Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   73.5 72 75
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.3+-0.5
Pump speed r/min   340 340 340
Average injection quantity mm3/st.   8 6.7 9.3
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101602-7710
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)The torque control spring does not operate. (4)Set idle sub-spring (5)Main spring setting
----------
K=10
----------

Speed control lever angle

Test data 101602-7710
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=1deg+-5deg b=18deg+-5deg

Stop lever angle

Test data 101602-7710
N:Pump normal S:Stop the pump.
----------

----------
a=12deg+-5deg b=46deg+-5deg

Timing setting

Test data 101602-7710
(1)Pump vertical direction (2)Position of coupling's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(10deg)




Information:

Fuel Filter
(For in-line fuel injection pump)
To prevent dust from entering the fuel system, cover all openings in the fuel injection pump and fuel hoses.
(For distributor-type fuel injection pump)
To prevent dust from entering the fuel system, cover all openings in the fuel injection pump and fuel hoses.
Fuel Injection Pipe, Fuel Leak-Off Pipe and Fuel Injection Nozzle
(For in-line fuel injection pump)
To prevent dust from entering the fuel system, cover all openings in the fuel injection pump, nozzle inlet connectors and injection pipes.
(For distributor-type fuel injection pump)
To prevent dust from entering the fuel system, cover all openings in the fuel injection pump, nozzle inlet connectors and injection pipes.
Fuel Injection Pump
(In-line fuel injection pump)
To prevent dust from entering the fuel system, cover all openings in the fuel injection pump.
(Distributor-type fuel injection pump)
To prevent dust from entering the fuel system, cover all openings in the injection pump.
Removal of Fuel Injection Pump
(1) Check the alignment marks stamped on the flange of the fuel injection pump and the pump mounting flange.(2) Remove the front cover from the engine.(3) Place alignment marks on the fuel injection pump gear and idler gear.(4) Unscrew the mounting bolts from the fuel injection pump flange, and remove the fuel injection pump together with the flange from the front plate. (a) After the fuel injection pump is removed, do not turn the engine.(b) When removing the pump gear, loosen the gear retaining nut while the pump is mounted on the engine.
Removal of fuel injection pump (1)
Removal of fuel injection pump (2)

Have questions with 101602-7710?





Group cross 101602-7710 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
1156029720 
INJECTION-PUMP ASSEMBLY
6BG1-T
101602-7710  
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 610 587 
1156029910 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 588 
1156029920 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 610 589 
1156030410 
INJECTION-PUMP ASSEMBLY
6BG1-TQB
9 400 610 590 
1156030400 
INJECTION-PUMP ASSEMBLY
6BG1-TQC
9 400 610 591 
1156030490 
INJECTION-PUMP ASSEMBLY
6BG1-TQA
9 400 610 592 
1156030520 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 614 913 
1156030530 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 610 593 
1156030540 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 614 914 
1156030550 
INJECTION-PUMP ASSEMBLY
6BG1-T
Back to top