101602-7550 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016027550 1156028590


 

Information injection-pump assembly

ZEXEL 101602-7550 1016027550
ISUZU 1156028590 1156028590
101602-7550 INJECTION-PUMP ASSEMBLY
Rating:
60
Buy INJECTION-PUMP ASSEMBLY 101602-7550 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-7550 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-2051
3. GOVERNOR 105419-1060
4. SUPPLY PUMP 105220-4561
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105661-3230
7. COUPLING PLATE 156635-1820
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5792
11. Nozzle and Holder 8-94130-074-3
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-3391
14. NOZZLE 105015-4740
15. NOZZLE SET

Include in #1:

101602-7550 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

ZEXEL 101602-7550 1016027550
ISUZU 1156028590 1156028590


Zexel num
Bosch num
Firm num
Name
101602-7550 
101602-7551 
 
1156028590  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   65.9 64.4 67.4
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   6.1+-0.5
Pump speed r/min   360 360 360
Average injection quantity mm3/st.   8.2 6.8 9.6
Max. variation between cylinders %   0 -14 14
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101602-7550
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK LIMIT: RAL
----------
K=13 RAL=13.5+-0.1mm
----------

Speed control lever angle

Test data 101602-7550
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=20deg+-5deg b=37deg+-5deg

Stop lever angle

Test data 101602-7550
N:Pump normal S:Stop the pump.
----------

----------
a=46deg+-5deg b=52deg+-5deg

Timing setting

Test data 101602-7550
(1)Pump vertical direction (2)Position of flywheel's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(10deg)




Information:


An additional 5 hours is allowed if the harness must replaced.
Product smu/age whichever comes first Caterpillar Dealer Suggested Customer Suggested
Parts % Labor Hrs% Parts % Labor Hrs% Parts % Labor Hrs%
*******Group 2*******
0-4000 hrs,
0-12 mo 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
This is a 3.0-hour job for Group 2
An additional 10 hours is allowed if the harness must replaced.
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Rework Procedure
Group Number 1
Injector Harness Inspection
-Raise the engine enclosure hood.
-Remove the air intake pipe connecting the air filter to the turbo inlet.
-Remove the valve covers.
-Inspect the injector harness wiring for contact between the harness and valve springs.
Image1.1.1
Repair
-If the harness is close to the valve spring, adjust the harness by disconnecting the injector connector rotating the connector 360 degrees and reconnecting it. This should slightly twist the wires and pull them away from the springs.
Image1.2.1
Injector Harness Replacement (If Necessary)
-If the injector harness has contacted the spring and cut the wire or exposed the wire, then replace the injector harness that is under the valve cover.
-When installing the new harness to the valve cover base make sure the tabs do not turn while torquing down the bolts(see the picture below). Keep the tabs straight, and this will help keep the wiring away from the valve springs.
Image1.3.1
Group Number 2
Injector Harness Inspection
-Remove the rear engine enclosure.
-Remove the clamp for flex boot on the air filter housing.
-Remove the rubber elbow on the inlet of the compressor side of the turbocharger.
-Remove the clamps called out in the photo for the turbocharger outlet pipe that connects to the aftercooler.
Image2.1.1
-Remove all three engine valve covers.
-Inspect the injector harness wiring for contact between the harness and valve springs.
Image2.2.1
Repair
-If the harness is close to the valve spring, adjust the harness by disconnecting the injector connector rotating the connector 360 degrees and reconnecting it. This should slightly twist the wires and pull them away from the springs.
Image2.3.1
Injector Harness Replacement (If Necessary)
-If the injector harness has contacted the spring and cut the wire or exposed the wire, then replace the injector harness that is under the valve cover.
-Remove the doors, hood, Clean Emissions Module (CEM) and mounting plate, and valve cover base.
-When installing the new harness to the valve cover base make sure the tabs do not turn while torquing down the bolts(see the picture below). Keep the tabs straight, and this will help keep the wiring away from the valve springs.
Image2.4.1
-Reinstall the previously removed hardware, and use the new 344-8311 exhaust clamp.
Image2.5.1

Have questions with 101602-7550?





Group cross 101602-7550 ZEXEL

Isuzu 

F 019 Z10 595 
1156028060 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156028061 
INJECTION-PUMP ASSEMBLY
6BB1
9 400 614 900 
1156028062 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156028080 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 614 901 
1156028081 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156028070 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 902 
1156028071 
INJECTION-PUMP ASSEMBLY
6BD1
F 019 Z10 357 
1156026870 
INJECTION-PUMP ASSEMBLY
6BG1-T
F 019 Z10 358 
1156026871 
INJECTION-PUMP ASSEMBLY
6BG1-T
F 019 Z10 359 
1156026872 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 614 903 
1156026873 
INJECTION-PUMP ASSEMBLY
6BG1-T
 
1156028140 
INJECTION-PUMP ASSEMBLY
6BG1
101602-7550  

101602-7551 
 
1156028590 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156028591 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 610 585 
1156028592 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 904 
1156028520 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 905 
1156028530 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 611 432 
1156028540 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 906 
1156028560 
INJECTION-PUMP ASSEMBLY
6BD1
Back to top