101602-7321 ZEXEL 9 400 614 890 BOSCH INJECTION-PUMP ASSEMBLY 9400614890 1016027321 1156026321


 

Information injection-pump assembly

BOSCH 9 400 614 890 9400614890
ZEXEL 101602-7321 1016027321
ISUZU 1156026321 1156026321
101602-7321 INJECTION-PUMP ASSEMBLY
Rating:
17
Buy INJECTION-PUMP ASSEMBLY 101602-7321 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-7321 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-2190
3. GOVERNOR 105419-0381
4. SUPPLY PUMP 105220-4561
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105661-3230
7. COUPLING PLATE 156635-1820
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4372
11. Nozzle and Holder 5-15300-103-2
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-3391
14. NOZZLE 105015-3930
15. NOZZLE SET

Include in #1:

101602-7321 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 614 890 9400614890
ZEXEL 101602-7321 1016027321
ISUZU 1156026321 1156026321


Zexel num
Bosch num
Firm num
Name
101602-7321 
9 400 614 890 
1156026321  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1 K 14BE INJECTION PUMP ASSY PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.3
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   63.8 62.8 64.8
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.5+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   9.4 8.1 10.7
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101602-7321
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Set idle sub-spring (4)Main spring setting
----------
K=15
----------

Speed control lever angle

Test data 101602-7321
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=8deg+-5deg b=21deg+-5deg

Stop lever angle

Test data 101602-7321
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa (2)Rack position = bb or less
----------
aa=37mm bb=5.5mm
----------
a=38deg+-5deg b=46deg+-5deg

Timing setting

Test data 101602-7321
(1)Pump vertical direction (2)Position of flywheel's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(10deg)




Information:


Fig. 37-Injection Line to Injection Pump Screw TorqueConnect injection lines to injection pump using NEW washers (Fig. 37).Injection line to injection pump screw torque ... 35 lb-ft(47 N m)
Fig. 38-Fuel Supply and Return LinesConnect fuel supply line (1, Fig. 38) and fuel return line (2).Fuel supply line connection torque (1) ... 20 lb-ft(27 N m)Fuel return line connection torque (2) ... 20 lb-ft(27 N m)Connect throttle linkage, remove timing window, and install timing hole cover.Bleed the fuel system (Group 0413).See Group 9010 for adjustments.4-239T, 4-276T, 6-359T, 6-414D or 6-414T Engine
Position number one piston at top dead center on compression stroke.
Fig. 39-19918 Timing WindowRemove timing hole cover and install 19918 Timing Window (Fig. 39) on injection pump.Check pump mounting flange packing for damage or wear. Replace if necessary.
Fig. 40-Injection Pump Timing LinesRotate pump drive shaft and align timing lines (Fig. 40) on governor weight retainer and cam ring.Position pump on engine front plate making sure Woodruff key enters drive gear.
Fig. 41-Injection Pump Drive Gear NutInstall washer and nut on oiled pump drive shaft (Fig. 41).Injection pump drive gear nut torque (oiled) ... 150 lb-ft(203 N m)
Fig. 42-Injection Pump Attaching NutsInstall pump attaching nuts (Fig. 42) finger tight.Rotate injection pump housing counterclockwise (viewed from flywheel end) as far as possible.Rotate crankshaft counterclockwise (viewed from front end) approximately 180°. Reverse rotation and reposition number one piston at top dead center on compression stroke.Rotate injection pump housing clockwise (viewed from flywheel end) until timing lines align.Tighten injection pump attaching nuts (Fig. 42).Injection pump attaching nut torque ... 20 lb-ft(27 N m)Rotate crankshaft counterclockwise (viewed from front end) approximately 180°. Reverse rotation and reposition number one piston at top dead center on compression stroke.Injection pump timing lines should be aligned. If not, retime injection pump.
Fig. 43-Fuel Supply and Return LinesConnect fuel supply line (1, Fig. 43), fuel return line (2) and fuel injection lines (3).Fuel line connection torque (1) ... 20 lb-ft(27 N m)Fuel return line ... 20 lb-ft(27 N m)Fuel injection line connector torque ... 20 lb-ft(27 N m)Connect throttle linkage, remove timing window, and install timing hole cover.Bleed the fuel system (Group 0413).See Group 9010 for adjustments.Bleeding
Fig. 44-Fuel Filter Bleed ScrewLoosen fuel filter bleed screw (Fig. 44).
Fig. 45-Fuel Transfer Pump Primer LeverPump primer lever (Fig. 45), located on fuel transfer pump, until no air flows from bleed screw.Tighten the bleed screw.All Engines Except 3-179D
Fig. 46-Fuel Supply Line ConnectionSlightly crack fuel supply line connection at injection pump (Fig. 46) and pump primer lever until no air flows from fuel supply line connection.Tighten fuel supply line connection to 20 lb-ft (27 N m).Leave primer lever positioned toward the cylinder block.Loosen each nozzle inlet connector and turn engine until fuel flows form connector.Tighten nozzle inlet connector to 35 lb-ft (47 N m).3-179D Engine
If engine will not start after bleeding fuel filter, bleed fuel injection pump as follows:
Fig. 47-Roto-Diesel Fuel Injection Pump Bleed ScrewsLoosen lower bleed screw (B, Fig. 47).Pump primer lever on fuel transfer pump until fuel

Have questions with 101602-7321?





Group cross 101602-7321 ZEXEL

Isuzu 

9 400 614 889 
1156026200 
INJECTION-PUMP ASSEMBLY
6BG1-T
 
1156026310 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156026311 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 583 
1156026312 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156026320 
INJECTION-PUMP ASSEMBLY
6BD1
101602-7321  
9 400 614 890 
1156026321 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156026580 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156026581 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
 
INJECTION-PUMP ASSEMBLY
6BD1-T
9 400 613 117 
1156026582 
INJECTION-PUMP ASSEMBLY
6BD1-T
9 400 611 894 
1156026700 
INJECTION-PUMP ASSEMBLY
6BG1-T
 
1156025540 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 614 891 
1156025541 
INJECTION-PUMP ASSEMBLY
6BG1-T
 
1156026800 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 892 
1156026600 
INJECTION-PUMP ASSEMBLY
6BD1-T
9 400 614 893 
1156026860 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156026890 
INJECTION-PUMP ASSEMBLY
6BB1
9 400 614 894 
1156026891 
INJECTION-PUMP ASSEMBLY
6BB1
Back to top