101602-4171 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016024171 1156016450


 

Information injection-pump assembly

ZEXEL 101602-4171 1016024171
ISUZU 1156016450 1156016450
101602-4171 INJECTION-PUMP ASSEMBLY
Rating:
11
Buy INJECTION-PUMP ASSEMBLY 101602-4171 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101602-4171 
101602-4173 
 
1156016450  ISUZU
INJECTION-PUMP ASSEMBLY
6BB1 *




Information:

Hot Test Procedure
Start engine, run at low idle, and ensure minimum oil pressure of 235 kPa (34 psi) is present within 30 sec. Walk around the engine and check for leaks. Run straight diesel with Natural Gas shut off.
Check ET for Codes.
Run Break-In 1 Speed and Load for 1 min.
Break-In load and speed 2967 Nm at 1440 rpm.
Cycle Load Between Break-In 2 Load, and Break-In 1 Load, 3 times holding at each load for 30 sec.
Break-In load and speed 5933 Nm at 1800 rpm.
Remove dyno load and go to Low Idle.
Illustration 276 g06547946
Cat ET EGR system test
Run EGR verification check in ET, and ensure it Passes. Run the EGR verification check a second time if the first one fails. If itfailsagain shut the engine offand troubleshoot EGR system.
Cat ET EGR System Test.
If Aftertreatment is not installed the Exhaust Backpressure must be within pressure tolerance of 7 3 kPa (1.0 0.4 psi) at the end of Break-In 2.
Illustration 277 g06547948
Cat ET fuel system functional test
Run Fuel System verification check in ET, and ensure it Passes.Note: Checking to see, if this is needed or not
DO NOT Lug engine until the engine has a successful EGR verification check, and Engine Backpressure is acceptable (Aftertreatment installed or backpressure verified during Break-In 2).
Set engine speed to Hi Idle speed.
Lug to engine to "Full Load speed" and allow water temps to stabilize.
EJW 85° 4°C (185° 39°F).
SCAC 46° 3°C (115° 37°F).
ATAAC Out 48° 3°C (118° 37°F).
Acquire "Full Load Data".
Take screenshot from ET for some ECM parameters.
Lug engine to "Torque Check" speed and allow engine to stabilize.
Acquire "Torque Check Data".
Take screenshot from ET for some ECM parameters.
Go to "Gas Blending Speed and Load".
754 bkW at 1800 rpm.
Turn on Gas supply. Natural Gas supply pressure measured on engine should be between 100 70 kPa (15 to 10 psi).
Let engine stabilize for 1 min.
Acquire Diesel and Natural Gas fuel rates.
Take ET screenshot.
Remove engine load and stabilize at High Idle speed for 1 min.
Acquire Hi Idle Data.
Take screenshot from ET for some ECM parameters.
Set engine to Low Idle speed and stabilize for 1 min.
Acquire Low Idle Data.
Take screenshot from ET for some ECM parameters.Nominal Test Values
The following nominal value information for hot tests can be referenced in the TMI system under the following test specs:
Illustration 278 g06547949
TMI Spec Summary
Illustration 279 g06547950
Full Load Point Values (2500 hp SCAC)
Illustration 280 g06547951
Full Load Point Values (2500 hp ATAAC)
Full Load Point.
Illustration 281 g06547952
Torque Check Point Values (2500 hp SCAC)
Illustration 282 g06547953
Torque Check Point Values (2500 hp ATAAC)
Torque Check Point.
Illustration 283 g06547954
Gas Blend Point Values (2500 hp SCAC)
Illustration 284 g06547955
Gas Blend Point Values (2500 hp ATAAC)
Gas Blend Point.

Have questions with 101602-4171?





Group cross 101602-4171 ZEXEL

Isuzu 

 
1156014402 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156014453 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156014342 
INJECTION-PUMP ASSEMBLY
6BF1
9 400 614 830 
1156015592 
INJECTION-PUMP ASSEMBLY
6BD1T
 
1156015710 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015522 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156015601 
INJECTION-PUMP ASSEMBLY
6BD1T
9 400 614 831 
1156015602 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
 
INJECTION-PUMP ASSEMBLY
6BB1
101602-4171  

101602-4173 
 
1156016450 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156016451 
INJECTION-PUMP ASSEMBLY
6BB1
9 400 614 832 
1156016452 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156016590 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156016591 
INJECTION-PUMP ASSEMBLY
6BD1
Back to top