101602-4110 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016024110 1156014453


 

Information injection-pump assembly

ZEXEL 101602-4110 1016024110
ISUZU 1156014453 1156014453
101602-4110 INJECTION-PUMP ASSEMBLY
Rating:
23
Buy INJECTION-PUMP ASSEMBLY 101602-4110 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-4110 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-8130
3. GOVERNOR 105410-7190
4. SUPPLY PUMP 105220-4561
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4372
11. Nozzle and Holder 5-15300-103-2
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-3391
14. NOZZLE 105015-3930
15. NOZZLE SET

Include in #1:

101602-4110 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101602-4110 1016024110
ISUZU 1156014453 1156014453


Zexel num
Bosch num
Firm num
Name
101602-4110 
101602-4840 
 
1156014453  ISUZU
INJECTION-PUMP ASSEMBLY
6BB1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.8
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   58 57 59
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   9.8
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   55 51 59
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   7.7+-0.5
Pump speed r/min   325 325 325
Average injection quantity mm3/st.   9.4 8.1 10.7
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101602-4110
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Main spring setting (3)Set idle sub-spring
----------
K=4
----------

Speed control lever angle

Test data 101602-4110
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=77deg+-5deg b=22deg+-5deg

Stop lever angle

Test data 101602-4110
N:Pump normal S:Stop the pump.
----------

----------
a=12deg+-5deg b=46deg+-5deg

Timing setting

Test data 101602-4110
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=22deg
----------
a=(90deg)




Information:

Condition: DEF nozzle does not shut off, causing DEF to exit the tank breather
Troubleshooting Steps:
Machine should be parked on level surface during DEF fill. Parking the machine with front end running at a downward angle may cause DEF to exit breather before the float in the tank valve rises enough to shut off nozzle.
Verify that the pressure at the nozzle from supply pump meets minimum 172 to 200 kPa (25 to 29 psi) requirement to trigger nozzle shut off.
Inspect tank-mounted valve for debris or ice preventing closure.
Inspect nozzle for damage from rough handling, DEF crystal buildup. Replace or repair as needed.Condition: DEF Nozzle shuts off before tank is full
Troubleshooting Steps:
Machine should be parked on level surface during DEF fill. Parking the machine with front end running at an upward angle may cause DEF Nozzle to shut off prematurely because DEF level at the rear of the tank near valve may cause float to rise and shut off nozzle.
Verify that flow at nozzle does not exceed the recommended target of 45 L/min (12 US gpm).
Excessive flow can damage tank-mounted valve and cause premature shut off.
Inspect vent line going up to breather and breather for any blockage, clean or replace if needed.
Inspect DEF fast fill line from receiver to valve, the valve for any blockages. Clean or replace if needed.
Inspect nozzle for damage from rough handling, DEF crystal buildup. Repair or replace as needed.

Have questions with 101602-4110?





Group cross 101602-4110 ZEXEL

Isuzu 

 
1156014402 
INJECTION-PUMP ASSEMBLY
6BD1
101602-4110  

101602-4840 
 
1156014453 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156014342 
INJECTION-PUMP ASSEMBLY
6BF1
9 400 614 830 
1156015592 
INJECTION-PUMP ASSEMBLY
6BD1T
 
1156015710 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015522 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156015601 
INJECTION-PUMP ASSEMBLY
6BD1T
9 400 614 831 
1156015602 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156016450 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156016451 
INJECTION-PUMP ASSEMBLY
6BB1
9 400 614 832 
1156016452 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156016590 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156016591 
INJECTION-PUMP ASSEMBLY
6BD1
Back to top