101601-8990 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016018990 1156015242


 

Information injection-pump assembly

ZEXEL 101601-8990 1016018990
ISUZU 1156015242 1156015242
101601-8990 INJECTION-PUMP ASSEMBLY
Rating:
16
Buy INJECTION-PUMP ASSEMBLY 101601-8990 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101601-8990 
101601-8991 
 
1156015242  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1 *




Information:

1. Drain the coolant and oil from the engine.2. Remove bolt (1) and retainer (2) that hold the oil lines in the BrakeSaver control valve. 3. Disconnect oil lines (3) and (4) from the oil cooler. Remove oil lines (3) and (4) from the BrakeSaver control valve.4. Fasten a hoist to the oil cooler. 5. Remove two bolts (8) to disconnect elbow (10) from front bonnet (9). Remove two bolts (7) to disconnect front bonnet (9) from the water pump.6. Remove four bolts (5) to disconnect the rear bonnet from the cylinder block. Disconnect bracket (12).7. Remove oil cooler (11), front bonnet (9) and rear bonnet (6) from the engine as a unit. The weight is approximately 54 kg (120 lb.).8. Make a separation of front bonnet (9) and rear bonnet (6) from oil cooler (11). 9. Clean oil cooler core tubes (13) with a 3.81 mm (.150 in.) diameter rod.10. Inspect all O-ring seals and gaskets for damage, and make replacements if needed. Put clean engine oil on the O-ring seals.11. Install rear bonnet (6) and front bonnet (9) on oil cooler (11).12. Fasten a hoist, and put the oil cooler and bonnets as a unit in place on the engine. Connect bracket (12) but do not tighten the bolts at this time.13. Install the gasket and four bolts (5) that hold rear bonnet (6) to the engine block. Do not tighten the bolts at this time.14. Install the gasket and two bolts (7) that hold front bonnet (9) to the water pump. Do not tighten the bolts at this time.15. Install the gasket and bolts (8) that hold elbow (10) to the front bonnet. Tighten all the bolts.16. Make sure the O-ring seals are in place on the oil lines, and install oil lines (3) and (4).17. Install retainer (2) to hold the oil lines in the BrakeSaver control valve. If the bottom plug in the oil pan was removed, put the split (seam) of the gasket for the plug against the oil pan. If either plug on the side of the oil pan was removed, put 5P3413 Thread Sealant With Teflon on the threads, and tighten the plug to a torque of 80 11 N m (60 8 lb.ft.).18. Fill the engine with coolant and oil. See the Maintenance Manual.

Have questions with 101601-8990?





Group cross 101601-8990 ZEXEL

Isuzu 

 
1156017372 
INJECTION-PUMP ASSEMBLY
6QA2
 
1156017373 
INJECTION-PUMP ASSEMBLY
6QA2
 
1156017430 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156015072 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 676 
1156015075 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015101 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015102 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015105 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015121 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015124 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 611 890 
1156015126 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015131 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015134 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015141 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015144 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015163 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015173 
INJECTION-PUMP ASSEMBLY
6BD1
101601-8990  

101601-8991 
 
1156015242 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 677 
1156015245 
INJECTION-PUMP ASSEMBLY
6BD1
Back to top