101601-8931 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016018931 1156015102


 

Information injection-pump assembly

ZEXEL 101601-8931 1016018931
ISUZU 1156015102 1156015102
101601-8931 INJECTION-PUMP ASSEMBLY
Rating:
25
Buy INJECTION-PUMP ASSEMBLY 101601-8931 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101601-8931 1016018931
ISUZU 1156015102 1156015102


Zexel num
Bosch num
Firm num
Name
101601-8931 
101601-8932 
 
1156015102  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.6
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   55.5 54 57
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   6.7+-0.5
Pump speed r/min   290 290 290
Average injection quantity mm3/st.   9.2 7.9 10.5
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   50 50
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   550--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   500
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1050
Advance angle deg.   1.3 0.8 1.8
Timer adjustment_04
Pump speed r/min   1600
Advance angle deg.   3.5 3 4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101601-8931
N:Pump speed R:Rack position (mm) (1)Damper spring setting: DL (2)Excess fuel setting for starting: SXL (3)Tamper proof (shaft setting) (at N = N1). (4)Rack difference between N = N2 and N = N3
----------
DL=6.2-0.2mm SXL=9.4+0.2mm N1=1500r/min N2=1500r/min N3=850r/min
----------

0000000901

Test data 101601-8931
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=33deg+-5deg b=20deg+-3deg

Stop lever angle

Test data 101601-8931
N:Pump normal S:Stop the pump.
----------

----------
a=35.5deg+-5deg b=71deg+-5deg

0000001501 TAMPER PROOF

Test data 101601-8931
N:Pump speed (r/min) R:Rack position (mm) 1. After governor adjustment, adjust the shaft as described below and stamp the cap. (1)Turn the load lever stopper bolt determining the full rack position (R = Rf) 1~2 turns counterclockwise. (2)Then, increase the full rack position. (3)Operate the pump at N = Nf and turn the shaft (B) clockwise. (4)Adjust so that full rack is Rf+0.4. (5)Tighten nut (A) to the specified torque. (6)Turn the stopper bolt clockwise the same amount that it was turned counter clockwise in (1). (7)Then, align with the full rack position (R = Rf) and fix. (8)Apply thread lock adhesive to the entire circumference of the cap (C) and tap it down to pressfit and seal it.. (9)Check for air tightness.
----------
Rf=8.4mm Nf=1500r/min
----------

Timing setting

Test data 101601-8931
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=14deg
----------
a=(60deg)




Information:

Start By:a. remove valve covers 1. Remove bolts (1) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (2). 2. Use tool (A) to loosen fuel injection line (3) from fuel injection nozzle (4). 3. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (3). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (5) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (6). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (7). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (8) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20° to 30° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.) and

Have questions with 101601-8931?





Group cross 101601-8931 ZEXEL

Isuzu 

 
1156017372 
INJECTION-PUMP ASSEMBLY
6QA2
 
1156017373 
INJECTION-PUMP ASSEMBLY
6QA2
 
1156017430 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156015072 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 676 
1156015075 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015101 
INJECTION-PUMP ASSEMBLY
6BD1
101601-8931  

101601-8932 
 
1156015102 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015105 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015121 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015124 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 611 890 
1156015126 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015131 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015134 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015141 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015144 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015163 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015173 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015242 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 677 
1156015245 
INJECTION-PUMP ASSEMBLY
6BD1
Back to top