101601-8863 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016018863 1156017423


 

Information injection-pump assembly

ZEXEL 101601-8863 1016018863
ISUZU 1156017423 1156017423
101601-8863 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 101601-8863 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101601-8863 1016018863
ISUZU 1156017423 1156017423


Zexel num
Bosch num
Firm num
Name
101601-8863 
101601-8865 
 
1156017423  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.5
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   73.4 71.8 75
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   8 6.7 9.3
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.5)
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   73.4 72.4 74.4
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   I
Rack position   14+-0.5
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   90 90 98
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1350--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1300
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   2 1.5 2.5
Timer adjustment_04
Pump speed r/min   1500
Advance angle deg.   4.5 4 5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101601-8863
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=C73
----------

Speed control lever angle

Test data 101601-8863
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=35mm
----------
a=42deg+-5deg b=35deg+-3deg

Stop lever angle

Test data 101601-8863
N:Pump normal S:Stop the pump.
----------

----------
a=25deg+-5deg b=40deg+-5deg

Timing setting

Test data 101601-8863
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(60deg)




Information:

13. Install spring (16), bellcrank (17), and retaining ring (15) on cover assembly (14). 14. Install gasket (24) bellcrank assembly (14) and two bolts (13) on timing advance housing. 15. Install timing advance housing (11) on the timing gear cover. Remove the screwdriver. 16. Check the position (protrusion) of ball detent (25) in tool (B). It should protrude only slightly into the grooved area. During the following steps, tool (B) and the area of installation cannot be seen. The cutaway views are shown for better photo illustration. 17. Install tool (B) with grooved side toward the engine, between the power piston bearing and bellcrank (17) so that ear (26) is in an approximate 9 o'clock position. 18. Apply a slight hand pressure and push tool (B) towards the engine and rotate counterclockwise slowly until ear (27) is in an approximately 9 o'clock position. A slight resistance as the tool starts to seat can be felt.19. Continue to rotate tool (B) counterclockwise until ear (27) is in an approximate 6 o'clock position. 20. Carefully install timing position sensor (6), spring (28), damping washer (29), bracket (8), collar (10) and locknut (9). Do not tighten locknut (9) at this time.21. Connect the wiring harness from the timing position sensor to the wiring harness on the engine. (J2/P2 connector). Be sure that the harness from the PEEC control module is connected to the engine wiring harness. (J7/P7 connector)22. Disconnect the PEEC data link connector (the short pigtail out of the top of the PEEC control module - J4/P4 connector) from the truck wiring harness and connect either tool (C) or tool (D) to the PEEC data link connector (J8 connector).23. Turn power on the PEEC control module. Select "Timing Position Sensor Calibration" from the main menu of tool (C) or (D). See Special Instructions, Form No's. SEHS8742 and/or SEHS8743.
Do not engage the starter, or damage to the engine will be the result.
24. Adjust collar (10) on timing position sensor until the bar graph on tool (C) or (D) is centered and indicate the timing position sensor is calibrated.25. Tighten locknut (9) to 55 7 N m (41 5 lb.ft.).26. Check the timing position calibration reading on tool (C) or (D) to insure that the timing position sensor is still in calibration after tightening the locknut.27. Turn off power to the PEEC control module.28. Disconnect tool (C) or (D) from the PEEC control module. Connect the PEEC data link connector (J1 connector) to the truck harness (P1 connector).29. Remove tool (B) from between the power piston and the bellcrank.30. Use tool (E) to rotate the engine in the clockwise direction to release the pressure on tool (F). Remove tool (F). 31. Lubricate o-ring seal (31) with engine oil and install on timing solenoid (5).32. Install timing solenoid (5) into the timing advance housing. Be sure lever (32) is engaged in the groove of the sleeve. Access port (33) has been provided to visually check the position of lever (32). 33.

Have questions with 101601-8863?





Group cross 101601-8863 ZEXEL

Isuzu 

 
1156017420 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156017421 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156017422 
INJECTION-PUMP ASSEMBLY
6BG1
101601-8863  

101601-8865 
 
1156017423 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156017424 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 614 674 
1156017425 
INJECTION-PUMP ASSEMBLY
6BG1
Back to top