101601-8451 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016018451 1156015700


 

Information injection-pump assembly

ZEXEL 101601-8451 1016018451
ISUZU 1156015700 1156015700
101601-8451 INJECTION-PUMP ASSEMBLY
Rating:
17
Buy INJECTION-PUMP ASSEMBLY 101601-8451 zexel genuine, new aftermarket engine parts with delivery

Service parts 101601-8451 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-2760
3. GOVERNOR 105931-1791
4. SUPPLY PUMP 105220-4781
5. AUTOM. ADVANCE MECHANIS 105612-3210
6. COUPLING PLATE 105661-0681
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6060
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 18.1(185)
13. NOZZLE-HOLDER 105031-3930
14. NOZZLE 105015-5730
15. NOZZLE SET

Include in #1:

101601-8451 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101601-8451 
 
1156015700  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1-T * K




Information:

Start By:a. remove cylinder headb. remove front and rear housingsc. remove rear seal and carrierd. remove pistons and connecting rods 1. Remove bolts (1), remove main bearing caps (2) and remove thrust bearings (3) from the center main. 2. Install two bolts and nylon strap (4) then carefully, remove the crankshaft. The approximate weight of the crankshaft is 129 Kg (284 lbs.).3. Remove the upper portions of the main bearings. The following steps are for the installation of the crankshaft. Be sure main bearing tabs engage the grooves in the block and cap.4. Position the upper portion of the main bearings in the block and the lower main bearing portion in caps (2). Make sure everything is clean and only the bearing face is lubricated with engine oil.5. Position the crankshaft. 6. Install thrust bearings (3).7. Install main bearing caps (2). Put engine oil or molylube on the bolt threads and the washer face, then install bolts (1). Tighten the bolts on the side where the main bearing tabs are located to a torque of 95 5 N m (70 4 lb.ft.). Tighten the bolts on the opposite side to a torque of 95 5 N m (70 4 lb.ft.).8. Put mark on each bolt head and the bearing caps. Turn the bolts that are opposite the main bearing tabs an additional 90° 5° turn. Then turn the bolts on the side where the main bearing tabs are located an additional 90° 5° turn.
Typical Example9. Use tooling (A) to measure crankshaft end play. The crankshaft end play must be 0.1 to 0.5 mm (.004 to .020 in.).End By:a. install pistons and connecting rodsb. install rear seal and carrierc. install front and rear housingsd. install cylinder head

Have questions with 101601-8451?





Group cross 101601-8451 ZEXEL

Isuzu 

 
1156015890 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015900 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015901 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015670 
INJECTION-PUMP ASSEMBLY
6BD1
 
 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015680 
INJECTION-PUMP ASSEMBLY
6BD1
 
 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156015690 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
 
INJECTION-PUMP ASSEMBLY
6BD1-T
101601-8451  
 
1156015700 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156015850 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015860 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156015870 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156015880 
INJECTION-PUMP ASSEMBLY
6BD1-T
Back to top