101601-5520 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016015520 220006320a


 

Information injection-pump assembly

ZEXEL 101601-5520 1016015520
HINO 220006320A 220006320a
101601-5520 INJECTION-PUMP ASSEMBLY
Rating:
83
Buy INJECTION-PUMP ASSEMBLY 101601-5520 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101601-5520 
101601-5523 
 
220006320A  HINO
INJECTION-PUMP ASSEMBLY
H07D-A *




Information:

Cooling
Never add coolant to an overheated engine; allow the engine to cool first.Check specific gravity of antifreeze solution frequently in cold weather to assure adequate protection.Coolant should be drained and replaced "Every 2000 Service Meter Units." With additions of Caterpillar Cooling System Inhibitor or the use of Coolant Conditioner Elements as recommended, the drain period can be extended to "Every 4000 Service Meter Units."All water is corrosive at engine operating temperature. The cooling system should be protected with inhibitor at all times regardless of concentration of antifreeze. This can be done by maintaining a 3% concentration of liquid Caterpillar Cooling System Inhibitor or by using Coolant Conditioner Elements.Never use both the liquid cooling system inhibitor and coolant elements at the same time.Do not use Caterpillar Cooling System Inhibitor or Coolant Conditioner Elements with Dowtherm 209 Full-Fill Coolant.
Whenever draining and refilling cooling system, always recheck the coolant level when the engine reaches normal operating temperature.Filling at over 5 U.S. gallons (19 liters) per minute can cause air pockets in the cooling system.Premix antifreeze solution to provide protection to the lowest expected ambient temperature. Pure undiluted antifreeze will freeze at -10°F (-23°C).Operate with a thermostat in the cooling system all year-round. Cooling system problems can arise without a thermostat.Electrical
When using jumper cables to start the engine, be sure to connect in parallel: POSITIVE (+) to POSITIVE (+) and NEGATIVE (-) to NEGATIVE (-).
Scheduled Oil Sampling
Use Scheduled Oil Sampling to monitor the engine's condition and maintenance requirements.Each oil sample should be taken when the oil is hot, and well mixed, to insure a sample which is representative of the oil in the compartment.Consult your Caterpillar dealer for complete information, and assistance in establishing a Scheduled Oil Sampling program for your equipment.Fuel
Fill fuel tank at the end of each day of operation to drive out moisture laden air and to prevent condensation. Do not fill the tank to the brim. The fuel expands when it gets warm and may overflow.
Water and sediment should be drained from the fuel tank at the start of each shift or after the fuel tank has been filled and allowed to stand for 5 to 10 minutes.Drain fuel tank of moisture and sediment as required by prevailing conditions.After changing fuel filters, always bleed fuel system to remove air bubbles from system.Air Intake
Service air cleaners when RED band in indicator locks in visible position.

Have questions with 101601-5520?





Group cross 101601-5520 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Hino 

 
220006240A 
INJECTION-PUMP ASSEMBLY
W06E
 
220006310A 
INJECTION-PUMP ASSEMBLY
H07D-A
 
220006310B 
INJECTION-PUMP ASSEMBLY
H07D-A
101601-5520  

101601-5523 
 
220006320A 
INJECTION-PUMP ASSEMBLY
H07D-A
 
220006320B 
INJECTION-PUMP ASSEMBLY
H07D-A
 
220006321A 
INJECTION-PUMP ASSEMBLY
H07D-A
 
220006330A 
INJECTION-PUMP ASSEMBLY
H07D-A
 
220006330B 
INJECTION-PUMP ASSEMBLY
H07D-A
 
220006340B 
INJECTION-PUMP ASSEMBLY
H07D-A
9 400 614 617 
220006360A 
INJECTION-PUMP ASSEMBLY
H07C-E
9 400 614 618 
220006370A 
INJECTION-PUMP ASSEMBLY
H07C-E
9 400 614 619 
220203420A 
INJECTION-PUMP ASSEMBLY
W06D
 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 614 620 
220006380A 
INJECTION-PUMP ASSEMBLY
W06E
 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 614 621 
220006390A 
INJECTION-PUMP ASSEMBLY
W06E
Back to top