101601-4970 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016014970 1156008173


 

Information injection-pump assembly

ZEXEL 101601-4970 1016014970
ISUZU 1156008173 1156008173
101601-4970 INJECTION-PUMP ASSEMBLY
Rating:
40
Buy INJECTION-PUMP ASSEMBLY 101601-4970 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101601-4970 
 
1156008173  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1TU * K




Information:

Start By:a. remove oil pumpb. remove oil pan plate
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove No. 1, 3, 5 and 7 main bearing caps (1). Remove the lower halves of the main bearings from the main bearing caps.
If the crankshaft is turned in the wrong direction, the tab on the bearing will be pushed between the crankshaft and the bearing area in the cylinder block. This can result in damage to the cylinder block and/or the crankshaft.
2. Install tool (A) in the hole in the crankshaft journal, and turn the crankshaft to remove the upper halves of main bearings (2).3. Remove crankshaft thrust bearings (3). Install the main bearings dry when the clearance checks are made. Put clean engine oil on the main bearings for final assembly.
Make sure the upper and lower halves of the main bearings are installed so the bearing tabs fit into the notch in the cylinder block and the main bearing caps.
4. Use tool (A), and install new upper halves of main bearings (2) in the cylinder block. Install new lower halves of main bearings (2) in main bearing caps (1).
When the bearing clearance is checked and the engine is in an upright position (vertical position with cylinder head on top), the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with the Plastigage. The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, it is not necessary to hold the crankshaft up. Do not turn the crankshaft when the Plastigage is in position to check clearances.
For complete details concerning measuring bearing clearances, see Engine Bearings And Crankshafts, Form No. SEBD0531.5. Check the main bearing clearance with Plastigage (B) as follows:a. Put a piece of Plastigage (B) on the crankshaft journals as shown.
Make sure the part number on the main bearing cap is toward the front of the engine and the number on the main bearing cap is the same as the number on the cylinder block on the left side of each main bearing cap.
b. Put main bearing caps (1) in position in the engine. Put 2P2506 Thread Lubricant on the bolt threads and the face of the washers, and install the bolts. Tighten the bolts to a torque of 40 4 N m (30 3 lb ft).c. Put a mark on each bolt and main bearing cap; then tighten the bolts 90° more.d. Remove the main bearing caps, and measure the Plastigage to find the bearing clearance. The main bearing clearance for new bearings must be 0.076 to 0.165 mm (.0030 to .0065 in). Maximum permissible clearance with used bearings is 0.25 mm (.010 in). 6. Put clean oil on the thrust bearing, and install a new thrust bearing for the rear main bearing. Install the thrust bearing with the identification

Have questions with 101601-4970?





Group cross 101601-4970 ZEXEL

Isuzu 

9 400 619 651 
1156008221 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156008391 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156008400 
INJECTION-PUMP ASSEMBLY
6BB1
 
1156007972 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156008153 
INJECTION-PUMP ASSEMBLY
6BD1T
 
1156008163 
INJECTION-PUMP ASSEMBLY
6BD1T
 
1156008531 
INJECTION-PUMP ASSEMBLY
6BD1T
 
1156008534 
INJECTION-PUMP ASSEMBLY
6BD1T
9 400 614 595 
1156008536 
INJECTION-PUMP ASSEMBLY
6BD1-T
101601-4970  
 
1156008173 
INJECTION-PUMP ASSEMBLY
6BD1TU
 
1156008183 
INJECTION-PUMP ASSEMBLY
6BD1TU
 
1156008550 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156010190 
INJECTION-PUMP ASSEMBLY
6QA1
Back to top