101601-4410 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016014410 5156009343


 

Information injection-pump assembly

ZEXEL 101601-4410 1016014410
ISUZU 5156009343 5156009343
101601-4410 INJECTION-PUMP ASSEMBLY
Rating:
67
Buy INJECTION-PUMP ASSEMBLY 101601-4410 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101601-4410 
 
5156009343  ISUZU
INJECTION-PUMP ASSEMBLY
6BB1 * K 14BE PE6A PE




Information:

2. Remove bolts (1) from the adapter. Loosen turbocharger compressor housing clamp (2), and rotate turbocharger tube (3) out of the way of the aftercooler housing. 3. Put identification marks on the bolts which hold the aftercooler cover in position for installation purposes. Remove bolts (4) that hold the aftercooler cover to the aftercooler housing. Remove aftercooler cover (5). 4. Remove four bolts (6), elbow (7), the two adapters and pipe (8). 5. Remove four bolts (9), elbow (10) and two adapters (11). 6. Remove aftercooler core (12) from aftercooler housing (13). 7. Remove O-ring seals (14) and gaskets (15) if necessary.Install Aftercooler Core
1. Clean and inspect all parts. Make a replacement of all parts that are worn or damaged. Lubricate all O-ring seals with clean engine oil at assembly. 2. Install O-ring seals (1). Fasten gaskets (2) to both sides of the aftercooler core flange with 5H2471 Cement. 3. Put aftercooler core (3) in position in the aftercooler housing with the end that has the identification "Jacket Water, Fresh Air" toward the water inlet end of the aftercooler housing. 4. Install cover (4) on the aftercooler housing. Be sure to install the long bolts in the thru bolt holes.
To prevent damage to the aftercooler core, tighten the bolts that hold the aftercooler core before tightening the bolts that hold the adapters.
5. Tighten the aftercooler core cover bolts to a torque of 25 7 N m (18 5 lb.ft.). Tighten the bolts again after engine is operated to a torque of 25 7 N m (18 5 lb.ft.). 6. Install gasket (5) and adapter (6) on the aftercooler housing. 7. Install adapter (7) on adapter (6). 8. Put O-ring seals (8) on pipe (9), and install pipe (9) into elbow (10). 9. Install elbow (11) on pipe (9). Put gasket (12) in position between elbow (11) and adapter (7), and fasten the elbow to aftercooler housing with four bolts. 10. Install gasket (13) and adapter (14) on the aftercooler housing. 11. Install adapter (15) on adapter (14). 12. Put O-ring seal (16) in position on tube (17), and install elbow (18) on tube (17). Put gasket (19) in position between elbow (18) and adapter (15), and fasten the elbow to the aftercooler housing with four bolts. 13. Rotate turbocharger tube (20) into position. Place a gasket between the aftercooler housing and adapter, and install the four bolts and nuts that hold it.14. Tighten turbocharger clamp nut (21) to a torque of 18 3 N m (13 2 lb.ft.). Lightly hit all around the clamp with a soft faced hammer, and tighten the clamp nut again to the same torque value.15. Fill the engine with coolant to the correct level. See the Maintenance Guide.

Have questions with 101601-4410?





Group cross 101601-4410 ZEXEL

Isuzu 

 
5156008743 
INJECTION-PUMP ASSEMBLY
6BD1
 
5156008744 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 591 
5156008746 
INJECTION-PUMP ASSEMBLY
6BD1
101601-4410  
 
5156009343 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156009530 

6BD1
 
5156009511 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156008880 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156008900 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156009040 

6BB1
 
5156009050 

6BB1
 
5156009600 

 
5156009620 

Back to top