101601-3100 ZEXEL 9 400 610 243 BOSCH INJECTION-PUMP ASSEMBLY 9400610243 1016013100 6138721600


 

Information injection-pump assembly

BOSCH 9 400 610 243 9400610243
ZEXEL 101601-3100 1016013100
KOMATSU 6138721600 6138721600
101601-3100 INJECTION-PUMP ASSEMBLY
Rating:
59
Buy INJECTION-PUMP ASSEMBLY 101601-3100 zexel genuine, new aftermarket engine parts with delivery

Service parts 101601-3100 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-2700
3. GOVERNOR 105411-0840
4. SUPPLY PUMP 105210-4690
5. AUTOM. ADVANCE MECHANIS 105614-3070
6. COUPLING PLATE 105662-0810
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6000
11. Nozzle and Holder 6138-12-3100
12. Open Pre:MPa(Kqf/cm2) 24.5{250}
13. NOZZLE-HOLDER 105031-4480
14. NOZZLE 105015-5680
15. NOZZLE SET

Include in #1:

101601-3100 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 243 9400610243
ZEXEL 101601-3100 1016013100
KOMATSU 6138721600 6138721600


Zexel num
Bosch num
Firm num
Name
101601-3100 
9 400 610 243 
6138721600  KOMATSU
INJECTION-PUMP ASSEMBLY
SA6D110 K 14BF INJECTION PUMP ASSY PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4 3.95 4.05
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.9
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   76 75 77
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Boost pressure kPa   40 40
Boost pressure mmHg   300 300
Injection quantity adjustment_02
Adjusting point   B
Rack position   10.9
Pump speed r/min   725 725 725
Average injection quantity mm3/st.   85 83 87
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Boost pressure kPa   40 40
Boost pressure mmHg   300 300
Injection quantity adjustment_03
Adjusting point   C
Rack position   7.3+-0.5
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   13 11.8 14.2
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   10
Boost pressure kPa   12 10.7 13.3
Boost pressure mmHg   90 80 100
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   10.9
Boost pressure kPa   26.7 26.7 26.7
Boost pressure mmHg   200 200 200
Timer adjustment
Pump speed r/min   750--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   700
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   900
Advance angle deg.   1.5 1 2
Timer adjustment_04
Pump speed r/min   1050
Advance angle deg.   2.2 1.7 2.7
Timer adjustment_05
Pump speed r/min   -
Advance angle deg.   5 4.5 5.5
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 101601-3100
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Boost compensator stroke
----------
K=7
----------

Speed control lever angle

Test data 101601-3100
F:Full speed I:Idle S:Stop
----------

----------
a=12deg+-5deg b=26deg+-5deg c=32deg+-3deg

0000001501 LEVER

Test data 101601-3100
(F) P/N: Part number of the shim L1:Thickness (mm) 1. Adjustment of the control lever (1)Perform idling with the control lever (A) contacting the pushrod (B). At this time, confirm that the spring (C) is not compressed by control lever (A)'s operating torque. (2)To set the stop position, compress spring (C) using the control lever (A) and adjust the rack so that it contacts the guide screw (D) at position L2. Then, set and fix using the lock nut (E). Adjust the rack position L2 at this time using the shim (F). (3)Confirm that the control lever (A) returns to the idling position when pulled in the stop direction and then released.
----------
L2=0.2~2mm
----------

Timing setting

Test data 101601-3100
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(0deg)




Information:

preparatory step: a) remove oil pan1. Remove the suction screen mounting bolt.2. Remove the oil pump mounting bolts (1).3. Remove the oil pump-weight 40 lbs. (18,1 kg).Install Oil Pump
Prime the oil pump with SAE 30 engine oil before installation.
1. Position the oil pump on the engine, and install the pump mounting bolts and screen mounting bolt.concluding step: a) install oil panDisassemble Oil Pump
preparatory step: a) remove oil pump 1. Remove the oil pump idler gear (1). Using tool setup (A), remove the bearing from the gear.2. Remove the suction bell assembly (2) and relief valve oil tube (3). 3. Remove the relief valve (4) and spring (5).4. Using tool setup (B), pull the oil pump drive gear from the shaft. Remove the woodruff key. 5. Remove the oil pump housing cover (6).6. Remove the pump gears. 7. Using tool setup (C), remove the bearings from the pump housing and gear.8. Remove the bearing from the pump housing cover.Assemble Oil Pump
1. Using tool setup (A), install the bearing in the oil pump idler gear. Recess the bearing edge flush with the inner edge of the chamfer. 2. Using tool setup (B), install the bearings in the pump housing, pump gear and pump housing cover. Recess the bearing edge flush with the inner edge of the chamfer. 3. Lubricate the bearings, gears (1) and shaft with clean SAE 30 engine oil. Install the gears into the pump housing.4. Install the oil pump housing cover (2).5. Heat the oil pump drive gear to 350°F (177°C). Install the woodruff key and gear on the pump shaft.6. Install the relief valve and spring.7. Install the suction bell assembly, relief valve oil tube and install idler gear.concluding step: a) install oil pump

Have questions with 101601-3100?





Group cross 101601-3100 ZEXEL

Komatsu 

101601-3100  
9 400 610 243 
6138721600 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138721550 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 614 579 
6138721510 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 610 563 
6138721950 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138721690 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
S6D110
9 400 610 305 
6138721150 
INJECTION-PUMP ASSEMBLY
S6D110
 
6138711280 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 610 197 
6138721110 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138721520 
INJECTION-PUMP ASSEMBLY
SSA6D110
 
6138721560 
INJECTION-PUMP ASSEMBLY
S6D110
Back to top