101601-3020 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016013020


 

Information injection-pump assembly

ZEXEL 101601-3020 1016013020
101601-3020 INJECTION-PUMP ASSEMBLY
Rating:
43
Buy INJECTION-PUMP ASSEMBLY 101601-3020 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101601-3020 
101601-3021 
 
  KOMATSU
INJECTION-PUMP ASSEMBLY
SA6D110 *




Information:


CRANKSHAFT
1. Bolts and washers (ten each). 2. Main bearing caps (five). 3. Crankshaft.2. Remove the main bearing caps (2) and lower halves of crankshaft main bearings.3. Attach a hoist and sling to the crankshaft (3). Remove the crankshaft, the weight is approx. 102 lbs. (46.3 kg).
REMOVING CRANKSHAFT4. Remove the upper halves of crankshaft main bearings.Install Crankshaft
1. Install the upper halves of main bearings. Lubricate the upper halves with clean engine oil (SAE 30).2. Attach a hoist and sling to the crankshaft. Position crankshaft in cylinder block. If camshaft is in the cylinder block, align timing mark on crankshaft gear with timing mark on camshaft gear.3. Lubricate lower halves of main bearings with clean engine oil (SAE 30). Install main bearing caps so number on cap corresponds with number on saddle of cylinder block. Both numbers must be on same side of cylinder block.4. Put engine oil on the threads of the bolts and the face of the washers and install the bolts into the cylinder block.
Do not rotate the crankshaft until all main bearing cap bolts have been tightened.
5. For 1140 (36B1-36B1923), 1145 (97B1-97B6154), 1150 (96B1-96B6580), 1160 (95B1-95B13691) Engines, tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 60 15 lb. ft. (8.3 2.1 mkg). Tighten all bolts in the number sequence shown (hand torque only) to a last torque of 175 10 lb. ft. (24.2 1.4 mkg).6. For 1140 (36B1924-Up), 1145 (97B6155-Up), 1150 (96B6581-Up), 1160 (95B13692-Up) Engines, tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 30 3 lb. ft. (4.1 0.4 mkg). Put a mark on each bolt and cap and tighten, in the number sequence shown, an added 120° 5° from the mark.
BOLT TIGHTENING SEQUENCE7. Check crankshaft end play. End play with new bearings should be .006 .003 in. (0.15 0.08 mm). Maximum allowable end play is .012 in. (0.30 mm).

Have questions with 101601-3020?





Group cross 101601-3020 ZEXEL

Komatsu 

 
 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 611 692 
 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 614 577 
6138711200 
INJECTION-PUMP ASSEMBLY
SA6D110
101601-3020  

101601-3021 
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138711290 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 610 267 
6138711300 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138711201 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138711291 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138711550 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
S6D110
 
6138711500 
INJECTION-PUMP ASSEMBLY
S6D110
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6138711950 
INJECTION-PUMP ASSEMBLY
SA6D110
 
 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 614 578 
6138711510 
INJECTION-PUMP ASSEMBLY
SA6D110
Back to top