101601-2420 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016012420 220201250c


 

Information injection-pump assembly

ZEXEL 101601-2420 1016012420
HINO 220201250C 220201250c
101601-2420 INJECTION-PUMP ASSEMBLY
Rating:
26
Buy INJECTION-PUMP ASSEMBLY 101601-2420 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101601-2420 1016012420
HINO 220201250C 220201250c


Zexel num
Bosch num
Firm num
Name
101601-2420 
101601-2421 
 
220201250C  HINO
INJECTION-PUMP ASSEMBLY
EH700 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   134424-0620
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.1 3.05 3.15
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   B
Rack position   6.5
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   64 63 65
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   5.5+-0.5
Pump speed r/min   250 250 250
Average injection quantity mm3/st.   8 7 9
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Timer adjustment
Pump speed r/min   1000++
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1250
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   2 1.5 2.5
Timer adjustment_04
Pump speed r/min   1500
Advance angle deg.   3.5 3 4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101601-2420
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK LIMIT: RAL (3)The torque control spring does not operate.
----------
K=12 RAL=9.8+0.2mm
----------

Speed control lever angle

Test data 101601-2420
F:Full speed I:Idle S:Stop
----------

----------
a=16deg+-5deg b=32deg+-3deg c=26deg+-5deg

Stop lever angle

Test data 101601-2420
N:Pump normal S:Stop the pump.
----------

----------
a=27deg+-5deg b=53deg+-5deg




Information:

3. Remove bearing caps (1) from the two connecting rods. Put pieces of rubber hose or tape on the threads of the connecting rod bolts as protection for the crankshaft. 4. Push the pistons up until the piston rings are clear of the cylinder liner. Remove pistons (2). Put identification on each piston as to its location for correct installation and alignment. Keep each cap with its connecting rod.
Do not turn the crankshaft while any of the connecting rods are in the engine without the caps installed.
5. Do Steps 1 through 4 for the remainder of the pistons.Install Pistons
1. Put clean engine oil on the piston rings, connecting rod bearings and cylinder liner. 2. Install piston into cylinder liner with tool (A). Push piston and rings through tool (A) with a hammer handle.3. Make a check of the connecting rod bearing clearance. See REMOVE AND INSTALL CONNECTING ROD BEARINGS. 4. Put clean engine oil on connecting rod cap and bearing. Install the cap (1) on the connecting rod. Tighten nuts to a torque of 50 5 lb. ft. (70 7 N m) plus 180°.5. Do Steps 1 through 4 for the remainder of the pistons.
As caps are installed, make sure that number identification on cap is on same side as number identification on rod.
end by: a) install cylinder head and spacer plateb) install oil pumpDisassemble Pistons
start by: a) remove pistons 1. Remove the retaining rings (2) for the piston pin.2. Remove piston pin (1) and remove piston from the connecting rod.3. Remove the piston rings using ring expander (A).Assemble Pistons
1. Use ring expander (A) to install the piston rings. The two compression rings have marks "UP-1" and "UP-2". The rings must be installed with the marks toward the top of the piston with "UP-1" being the top ring. Put the ring gaps in place 120° from each other.2. Put clean oil on the piston pin. Put the piston in place on the connecting rod. Install the piston pin and retaining rings. On some engines there can be a "V" mark (2) on the piston. This mark must be on the same side as the location number (1) on the connecting rod.end by: a) install pistons

Have questions with 101601-2420?





Group cross 101601-2420 ZEXEL

Hino 

 
220002060B 

 
220002001A 
INJECTION-PUMP ASSEMBLY
EL100
 
220002003A 
INJECTION-PUMP ASSEMBLY
EL100
 
220002004A 
INJECTION-PUMP ASSEMBLY
EL100
101601-2420  

101601-2421 
 
220201250C 
INJECTION-PUMP ASSEMBLY
EH700
 
220201251A 
INJECTION-PUMP ASSEMBLY
EH700
 
220002280B 
INJECTION-PUMP ASSEMBLY
EH700
 
220002240B 
INJECTION-PUMP ASSEMBLY
EH700
 
220002290B 
INJECTION-PUMP ASSEMBLY
ED100
 
220002291A 
INJECTION-PUMP ASSEMBLY
ED100
 
220002281B 
INJECTION-PUMP ASSEMBLY
EH700
 
220002282A 
INJECTION-PUMP ASSEMBLY
EH700
 
220002340B 
INJECTION-PUMP ASSEMBLY
EH700
 
220002341A 
INJECTION-PUMP ASSEMBLY
EH700
 
220002342A 
INJECTION-PUMP ASSEMBLY
EH700
 
220002330A 
INJECTION-PUMP ASSEMBLY
EH700
 
220002331A 
INJECTION-PUMP ASSEMBLY
EH700
 
220801020A 
INJECTION-PUMP ASSEMBLY
EH700
Back to top