101601-2390 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016012390 220002000b


 

Information injection-pump assembly

ZEXEL 101601-2390 1016012390
HINO 220002000B 220002000b
101601-2390 INJECTION-PUMP ASSEMBLY
Rating:
21
Buy INJECTION-PUMP ASSEMBLY 101601-2390 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101601-2390 
101601-2412 
 
220002000B  HINO
INJECTION-PUMP ASSEMBLY
EL100 *




Information:

start by:a) remove turbocharger 1. Put the turbocharger in position on tool (A).2. Put a mark on the compressor cover and housings for installation purpose.3. Remove bolts (1) and plates from compressor housing.4. Remove the compressor housing. 5. Remove bolts (2) and locks from turbine housing.6. Remove cartridge (3) from turbine housing. 7. Install tool (B) in tool (C). Install cartridge in tool (C).8. Remove nut (4) from the compressor wheel.
When the nut is loosened, do not put a side force on the shaft.
9. Install tool (D) on an oil heater. Heat the oil to 350°F (177°C). Install the cartridge on tool (D) with only the compressor wheel in the hot oil. Keep the compressor wheel in the hot oil for ten minutes. 10. Put tool (D) and cartridge on tool (E) under a press. Install driver (F) and push the shaft out of the compressor wheel. Step 10 must be done before the compressor wheel gets cold.11. Remove compressor wheel and shroud. Remove turbine wheel and shaft. 12. Remove the four bolts (5) and locks from plate (6). 13. Remove plate (6), spacer, collar and thrust bearing from cartridge.14. Remove seal from plate and ring from spacer. 15. Remove bearing (7), washer (11) and snap ring (8) from compressor side of cartridge.16. Remove snap ring (13), washer (10), bearing (12) and snap ring (9) from turbine side of cartridge.17. Check all the parts of the turbocharger for damage. If the parts have damage, use new parts for replacement. See SPECIAL INSTRUCTION, Form No. SMHS6854 for TURBOCHARGER RECONDITIONING. Also see GUIDELINE FOR REUSABLE PARTS, Form No. SEBF8018.Assemble Turbocharger
1. Make sure all oil passages are open and clean. Put clean engine oil on all parts before assembly. 2. Install snap ring (6), bearing (3), washer (7) and snap ring (4) in turbine side of cartridge. Install the two snap rings with tool (A). Install the snap rings with the rounded edge toward the bearing.3. Install snap ring (2), washer (5) and bearing (1) in compressor side of cartridge. 4. Install seal (12) on plate (8) and ring (9) on spacer.5. Install collar (10) in plate and spacer (11) in collar. 6. Install thrust bearing (13) with the three radial grooves toward the outside.7. Install plate (8), bolts and locks. Tighten bolts to a torque of 35 5 lb.in. (3.95 0.6 N m). 8. Install ring (14) on turbine wheel.9. Install turbine wheel and shaft in cartridge. Be careful not to break ring (14) when installing shaft. 10. Put cartridge on tool (C) and tool (C) on tool (B). Some compressor wheels (15) can be installed

Have questions with 101601-2390?





Group cross 101601-2390 ZEXEL

Hino 

 
220001540B 
INJECTION-PUMP ASSEMBLY
ED100
 
220001541A 
INJECTION-PUMP ASSEMBLY
ED100
 
220001560C 

 
220001620B 
INJECTION-PUMP ASSEMBLY
ED100
 
220001621A 
INJECTION-PUMP ASSEMBLY
ED100
 
220001941C 
INJECTION-PUMP ASSEMBLY
EH700
 
220001942A 
INJECTION-PUMP ASSEMBLY
EH700
 
220001951C 
INJECTION-PUMP ASSEMBLY
EH700
 
220001952A 
INJECTION-PUMP ASSEMBLY
EH700
 
220001561A 
INJECTION-PUMP ASSEMBLY
EH700
 
220001920A 
INJECTION-PUMP ASSEMBLY
EH700
 
220002270B 
INJECTION-PUMP ASSEMBLY
EH700
 
220001921D 
INJECTION-PUMP ASSEMBLY
EH700
101601-2390  

101601-2412 
 
220002000B 
INJECTION-PUMP ASSEMBLY
EL100
Back to top