101601-0780 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016010780 5156003702


 

Information injection-pump assembly

ZEXEL 101601-0780 1016010780
ISUZU 5156003702 5156003702
101601-0780 INJECTION-PUMP ASSEMBLY
Rating:
86
Buy INJECTION-PUMP ASSEMBLY 101601-0780 zexel genuine, new aftermarket engine parts with delivery

Service parts 101601-0780 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-8010
3. GOVERNOR 105470-0720
4. SUPPLY PUMP 105220-4080
5. AUTOM. ADVANCE MECHANIS 105622-0380
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4582
11. Nozzle and Holder 5-15300-089-1
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105031-3952
14. NOZZLE 105015-4130
15. NOZZLE SET

Include in #1:

101601-0780 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101601-0780 1016010780
ISUZU 5156003702 5156003702


Zexel num
Bosch num
Firm num
Name
101601-0780 
101601-4020 
 
5156003702  ISUZU
INJECTION-PUMP ASSEMBLY
6BB1 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   2.4 2.35 2.45
Rack position
Point B
  R=B
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   B
Rack position   9.5
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   55.2 53.7 56.7
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   D
Rack position   7
Pump speed r/min   325 325 325
Average injection quantity mm3/st.   7.3 6 8.6
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   58.6 58.6
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   1000+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1200
Advance angle deg.   0.9 0.4 1.4
Timer adjustment_03
Pump speed r/min   1450
Advance angle deg.   2.1 1.6 2.6
Timer adjustment_04
Pump speed r/min   1650
Advance angle deg.   3 2.5 3.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101601-0780
N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL (2)Set using excess fuel device for starting: SXL (3)Governor wavering must not exceed R1 between N1 and N2.
----------
DL=5.2-0.2mm SXL=9.5+0.2mm N1=1500r/min N2=1650r/min R1=0.2mm
----------

0000000901

Test data 101601-0780
F:Full load I:Idle (1)Fix using the stopper bolt.
----------

----------
a=30deg+-3deg b=33deg+-5deg




Information:


Product smu Caterpillar Dealer Suggested Customer Suggested
Parts Labor Hrs Parts Labor Hrs Parts Labor Hrs
0-4000 100% 7.0 0 0 0 0
4001-8000 50% 3.5 0 0 50% 0
This is a 7.0?hr job.PARTS DISPOSITION
Handle the parts in accordance with your WarrantyBulletin on warranty parts handling.Attach. (1-Rework Procedure)Rework Procedure
The two tests below provide the appropriateinjector troubleshooting and repair steps for injector updates.Test 1: Use "Test for CylinderCutout" to determine if individual injector replacements (using originalinjector part) are needed.Test 2: Use "Test for Leakagefrom Poppet Valve" to determine if full injector sets (using new injectorparts and a software change from the table) are appropriate for repair.Test for Cylinder Cutout:
Warm the engine out of Cold Mode.
Connect Caterpillar Electronic Technician (ET)to the engine while the engine is running.
Ensure that the engine speed is 1200 rpm +/- 125rpm. An extremely rough running engine will need to be diagnosed by othermethods.
Cut out one bank of cylinders.
Engine rpm and the fuel positionon the ET screen at that time.
Cut out one of the remaining cylinders from thecylinder bank that is running. Allow the engine to stabilize and note thefuel position.
Give power back to that cylinder. Allow the engineto stabilize and note the fuel position.
Repeat steps 5 through 6 until the cylinder bankhas been completely checked.
Power all cylinders. Allow the engine to stabilize.
Cut out the other cylinder bank and repeat steps5 through 8.
Repeat steps 4 through 9 with the engine at 2000rpm.
Compare the results from the fuel position fromeach cylinder.
If the cylinder was cut out and the fuel positiondid not change, the cylinder may not have producing power. This cylinderwould be suspect.
When you are finished with the test, decreaseengine rpm to low idle and shut the engine off.
Replace any suspect injector with a similar originalinjector. Install new seals for the injector and the jumper tube duringthis repair. The injector repair procedure is found in Special InstructionREHS0116.
It is also possible that multiple injectors arefunctioning improperly. Complete "Test for Leakage from Poppet Valve" inorder to evaluate potential excessive injector leakage and need for fuelsystem conversion.Test for Leakage from Poppet Valve:
Warm engine out of Cold Mode to normaloperating temperature.
Turn off the engine.
Remove the valve cover bolts in preparation toobserve the injectors. Leave covers in place.
!Personal injury can result from hot oil and components. Do not allowhot oil or components to contact skin.
Restart the engine and run at low idle with noload.
Use the ET service tool in order to perform theoverride test for the injection actuation system. Increase injection actuationpressure to the maximum value.
Observe all of the injectors under each valvecover for leakage at the spill port. A small amount of dripping is acceptable.However, a continuous stream of oil is an indication of excessive leakageof the poppet valve. Only leaks at the spill port are an indication ofexcessive poppet valve leakage.
If multiple injectors are discovered with excessiveleakage from the poppet valve, update the full set of injectors and softwarewith the new version given in this Service Letter. Install new seals forthe injector and the jumper tube during this repair. The injector repairprocedure can be found in Special Instruction REHS0116. The old softwarepart number should be documented for potential future reference.
Before proceeding with updating

Have questions with 101601-0780?





Group cross 101601-0780 ZEXEL

Isuzu 

 
1156002750 
INJECTION-PUMP ASSEMBLY
D920
 
1156002740 

 
5156003281 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156003291 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156004280 

6BB1
 
5156004290 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156003113 
INJECTION-PUMP ASSEMBLY
6BD1
 
5156004460 
INJECTION-PUMP ASSEMBLY
6BB1
101601-0780  

101601-4020 
 
5156003702 
INJECTION-PUMP ASSEMBLY
6BB1
 
5156004240 

Back to top