101502-9014 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1015029014


 

Information injection-pump assembly

ZEXEL 101502-9014 1015029014
101502-9014 INJECTION-PUMP ASSEMBLY
Rating:
16
Buy INJECTION-PUMP ASSEMBLY 101502-9014 zexel genuine, new aftermarket engine parts with delivery

Service parts 101502-9014 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101050-8032
3. GOVERNOR 105410-8630
4. SUPPLY PUMP 105220-5480
5. AUTOM. ADVANCE MECHANIS 105621-0430
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7370
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7(160)/22.1(225)
13. NOZZLE-HOLDER 105031-4990
14. NOZZLE 105015-7140
15. NOZZLE SET

Include in #1:

101502-9014 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101502-9014 1015029014


Zexel num
Bosch num
Firm num
Name
101502-9014 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   134424-4420
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-5-4- 2
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   72 71.5 72.5
Difference between angles 2
Cal 1-5
deg.   144 143.5 144.5
Difference between angles 3
Cal 1-4
deg.   216 215.5 216.5
Difference between angles 4
Cyl.1-2
deg.   288 287.5 288.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.5
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   59.2 57.7 60.7
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   7.1+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   8.9 6.9 10.9
Max. variation between cylinders %   0 -15 15
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101502-9014
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Set idle sub-spring (4)Main spring setting (5)Rack difference from N = N1
----------
K=12 N1=1200r/min
----------

Speed control lever angle

Test data 101502-9014
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=21deg+-5deg b=37deg+-5deg

Stop lever angle

Test data 101502-9014
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa
----------
aa=35mm
----------
a=19deg+-5deg b=53deg+-5deg

Timing setting

Test data 101502-9014
(1)Pump vertical direction (2)Position of camshaft's key groove at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(120deg)




Information:


If there has been a previous repair, part age/hours will apply. Retain a copy of the previous repair invoice in the dealer's records for audit purposes, and specify repair date and machine hours in the "Additional Comments" section of the warranty claim.
Dealer to perform most economical repair.
Description____________________________SMCS Code___Hours
Wash___________________________________1091-074 ___0.2
Inner fender __________________________7252-010 ___0.2
R&I DPF _______________________________108F-010 ___1.2
program ECM - program DPF serial # ,
ASH reset, factory passwords __________1901-591 ___0.2
Test after Repair _____________________108F-030 ___0.2
This letter is to be performed during a recommended ash service as stated in Media number SEBU8087. Ash cleaning is a part of the recommended maintenance of the engine, customer is responsible for the labor required to remove and install the DPF.
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Rework Procedure
1. Wash debris from Diesel Particulate Filter (DPF) as necessary.
Image1.1.1
2. Remove the Fender (A): Loosen and remove the nuts and bolts from the fender of the truck. Retain the fender and fasteners for reuse. Refer to Image 1.1.1.
Image1.2.1
3. Remove the Step (B): Loosen and remove fasteners from the step of the truck. Retain the step and fasteners for reuse. Refer to Image 1.2.1.
Image1.3.1
Image1.3.2
4. Remove the Pipe Clamps: Loosen and remove clamps from the Inlet Pipe (C)& Outlet Pipe (D) of the DPF?s. Refer to Image 1.3.1 & Image 1.3.2
Image1.4.1
5. Remove tubes (E) and sensor box mounting bolts (F) to unplug sensor box connection. Refer to Image 1.4.1.
Image1.5.1
6. Remove DPF mounting bolts: Loosen and remove fasteners from the mounting of the DPF. Retain the mounting and fasteners for reuse. No jack will be used to hold DPF, DPF is supported by air tank brackets. Properly support DPF until it rests on the bracket. Refer to Image 1.5.1.
Image1.6.1
7. Slide the DPF forward and remove. Remove the CGI pipe (G) after the DPF has been removed. Refer to Image 1.6.1.
Image 1.7.1 shows the chassis after the welded DPF has been removed.
Image1.7.1
Image1.7.2
8. Install the Clamped DPF with mounting bolts (reuse the bolts). Install the new 330-4036 CGI Pipe for Group 1 & Group 2 with the 304-3048 Clamp. Check Inlet, Outlet and CGI pipes alignment, mounting brackets should be aligned with OEM brackets.
Refer OEM guidelines for connecting Inlet & CGI connections.
Image 1.7.2 shows the clamped DPF after it has been installed in the chassis.
9. Install the step and fender that were removed in Step 2 and Step 3.
10. Reset the engine ash model. Refer Media Number RENR9705.
11. Start the engine and use CAT ET to ensure that the status parameter Diesel Particulate Trap #1 Differential Pressure has a value greater than zero. Also ensure status parameters Diesel Particulate Trap #1 Intake Temperature, and Diesel Particulate Trap #1 Outlet Temperature show reasonable values and increase with the rising exhaust temperatures.

Have questions with 101502-9014?





Group cross 101502-9014 ZEXEL

Kubota 

 
1570751011 
INJECTION-PUMP ASSEMBLY
F5000
 
 
INJECTION-PUMP ASSEMBLY

Kubota 

 
1570751013 
INJECTION-PUMP ASSEMBLY
F5000
101502-9014  
 
 
INJECTION-PUMP ASSEMBLY

Kubota 

9 400 614 553 
1570751014 
INJECTION-PUMP ASSEMBLY
F5000
Back to top