101493-9330 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014939330


 

Information injection-pump assembly

ZEXEL 101493-9330 1014939330
101493-9330 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 101493-9330 zexel genuine, new aftermarket engine parts with delivery

Service parts 101493-9330 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-9930
3. GOVERNOR 105921-6311
4. SUPPLY PUMP 105220-6020
5. AUTOM. ADVANCE MECHANIS 105671-0520
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-5581
11. Nozzle and Holder 16600-0T301
12. Open Pre:MPa(Kqf/cm2) 18.6{190}
13. NOZZLE-HOLDER 105048-3760
14. NOZZLE 105017-1330
15. NOZZLE SET

Include in #1:

101493-9330 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101493-9330 1014939330


Zexel num
Bosch num
Firm num
Name
101493-9330 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.2 3.15 3.25
Rack position
Point A
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.7
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   68.4 66.8 70
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   9.3 7.5 11.1
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.7)
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   68.4 67.4 69.4
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.1
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   77.8 73.8 81.8
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1+0.25
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   58.1 54.1 62.1
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   101 85 117
Fixing the lever   *
Timer adjustment
Pump speed r/min   700
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   1040
Advance angle deg.   1 0.5 1.5
Timer adjustment_03
Pump speed r/min   1500
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101493-9330
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=H39
----------

Speed control lever angle

Test data 101493-9330
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=32mm
----------
a=70deg+-5deg b=39deg+-3deg

Stop lever angle

Test data 101493-9330
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa
----------
aa=12mm
----------
a=29deg+-5deg b=10deg+-5deg

Timing setting

Test data 101493-9330
(1)Pump vertical direction (2)Position of gear's standard threaded hole (position of gear's distinguishing mark) at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=11deg
----------
a=(60deg)




Information:


Use tool (E) in order to cut off the part of rivet (1) that has been peened. Remove rivet (1) from fuel injection control linkage (4) .
Illustration 13 g00702186
The 180-7951 Bushing Assembly Kit (F) Rack Control Shaft (G) Governor Link (4) Fuel Injection Control Linkage (7) 180-7952 Lever Bushing (8) 8L-5832 Hex Nut (9) 9X-8907 Hexagon Button Screw
Use the 180-7951 Bushing Assembly Kit in order to modify the linkage. Insert 9X-8907 Hexagon Button Screw (9) from the 180-7951 Bushing Assembly Kit into fuel injection control linkage (4). Refer to Illustration 13.
Apply 169-5464 Quick Cure Primer apply on the threads of 9X-8907 Hexagon Button Screw (9) and 8L-5832 Hex Nut (8). Allow the primer to dry. The Quick Cure Primer counteracts the effects of the Volatile Corrosion Inhibitor (VCI) paper that was used to package the parts.
Assemble 180-7952 Lever Bushing (7) on 9X-8907 Hexagon Button Screw (9). Refer to Illustration 13.
Apply the 154-9731 Thread Lock Compound on the threads of 9X-8907 Hexagon Button Screw (9) and 8L-5832 Hex Nut (8) .
Illustration 14 g00655322
Place 8L-5832 Hex Nut (8) on 9X-8907 Hexagon Button Screw (9). Tighten 8L-5832 Hex Nut (8) until hex nut (8) is snug. Tighten 8L-5832 Hex Nut (8) for an additional 180 degrees.
Do not let metal chips or pieces of the rivet fall into the engine.
Illustration 15 g00655325
Clean the fuel injection control linkage and clean the surfaces of the cylinder head that are adjacent to the fuel injection control linkage with shop solvent. Remove the towels and remove all debris very carefully.
Install the 180-7956 Clamp Assembly Kit . Refer to the "Installation Of The 180-7956 Clamp Assembly Kit " section of this publication.Installation Of The 180-7956 Clamp Assembly Kit
Note: The 180-7956 Clamp Assembly Kit is used for the former control linkages only.Note: If the 180-7956 Clamp Assembly Kit is installed, refer to ""Modification of the 128-9640 Injector Synchronization Fixture "".The 180-7956 Clamp Assembly Kit may be installed on the fuel injection control linkage. The 180-7956 Clamp Assembly Kit will increase the strength of the joint.
Illustration 16 g00655326
Install 183-9390 Spacer (10) on fuel injection control linkage (4). Refer to Illustration 16.
Apply 169-5464 Quick Cure Primer to the threaded hole in the 180-7954 Clamp (11). Apply 169-5464 Quick Cure Primer to the threads of screw (13). Allow the primer to dry. The Quick Cure Primer counteracts the effects of the Volatile Corrosion Inhibitor (VCI) paper that was used to package the parts.
Apply 154-9731 Thread Lock Compound to the threaded hole in the 180-7954 Clamp (11). Apply 154-9731 Thread Lock Compound to the threads of screw (13) of clamp assembly. Loosely assemble 180-7954 Clamp (11) and 180-7987 Clamp (12) on fuel injection control linkage (4). Refer to Illustration 16. Be sure that the rivet head or bushing (14) is fully engaged into the counterbore of the

Have questions with 101493-9330?





Group cross 101493-9330 ZEXEL

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
DB33

Nissan 

9 400 610 556 
167000T068 
INJECTION-PUMP ASSEMBLY
FD42

Nissan-Diesel 

9 400 610 556 
167000T068 
INJECTION-PUMP ASSEMBLY
FD42

Nissan 

9 400 614 506 
167000T318 
INJECTION-PUMP ASSEMBLY
FD46

Nissan-Diesel 

9 400 614 506 
167000T318 
INJECTION-PUMP ASSEMBLY
FD46
101493-9330  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 614 507 
1670017D10 
INJECTION-PUMP ASSEMBLY
FD46
9 400 619 839 
 
INJECTION-PUMP ASSEMBLY

Mazda 

9 400 611 988 
SLS113800 
INJECTION-PUMP ASSEMBLY
SL
9 400 611 989 
 
INJECTION-PUMP ASSEMBLY

Mazda 

9 400 612 032 
SLS213800A 
INJECTION-PUMP ASSEMBLY
SL
Back to top