101493-9110 ZEXEL F 01G 09U 02G BOSCH INJECTION-PUMP ASSEMBLY f01g09u02g 1014939110 167000t306


 

Information injection-pump assembly

BOSCH F 01G 09U 02G f01g09u02g
ZEXEL 101493-9110 1014939110
NISSAN-DIESEL 167000T306 167000t306
101493-9110 INJECTION-PUMP ASSEMBLY
Rating:
27
Buy INJECTION-PUMP ASSEMBLY 101493-9110 zexel genuine, new aftermarket engine parts with delivery

Service parts 101493-9110 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-9870
3. GOVERNOR 105921-6190
4. SUPPLY PUMP 105220-6020
5. AUTOM. ADVANCE MECHANIS 105671-0310
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-5581
11. Nozzle and Holder 16600-0T301
12. Open Pre:MPa(Kqf/cm2) 18.6{190}
13. NOZZLE-HOLDER 105048-3760
14. NOZZLE 105017-1330
15. NOZZLE SET

Include in #1:

101493-9110 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 01G 09U 02G f01g09u02g
ZEXEL 101493-9110 1014939110
NISSAN-DIESEL 167000T306 167000t306


Zexel num
Bosch num
Firm num
Name
101493-9110 
101493-9111 
F 01G 09U 02G 
167000T306  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FD3 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.2 3.15 3.25
Rack position
Point A
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.5
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   71.4 69.8 73
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   9.4 7.6 11.2
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.5)
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   71.4 70.4 72.4
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(12.5)
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   80.4 76.4 84.4
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1+0.25
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   61.5 45.5 77.5
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   100 84 116
Fixing the lever   *
Timer adjustment
Pump speed r/min   970--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   920
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   -
Advance angle deg.   0.6 0.3 0.9
Remarks
Measure the actual speed.
 
Timer adjustment_04
Pump speed r/min   1250
Advance angle deg.   0.6 0.3 0.9
Timer adjustment_05
Pump speed r/min   1500
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101493-9110
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=H18
----------

Speed control lever angle

Test data 101493-9110
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=32mm
----------
a=70deg+-5deg b=38deg+-3deg

Stop lever angle

Test data 101493-9110
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa
----------
aa=12mm
----------
a=29deg+-5deg b=10deg+-5deg

Timing setting

Test data 101493-9110
(1)Pump vertical direction (2)Position of gear's standard threaded hole (position of gear mark 'S') at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=11deg
----------
a=(60deg)




Information:


Illustration 16 g00628694
(9) Fuel injector clamp. (10) Bolt. (11) O-ring seal.
Place the clamp (9) in the proper position. Temporarily place the jumper tube in position in order to ensure alignment of the bolt holes. Adjust the orientation of the injector until the alignment is satisfactory. Torque the bolt (10) to the following torque. Remove the jumper tube.Torque for bolt ... 47 9 N m (35 7 lb ft)
Illustration 17 g00628691
(12) O-ring seals in the injector jumper tube. (13) O-ring seals in the base of the rocker arm.
Replace the used O-ring seal (11), and the O-ring seals (12) and (13) in the jumper tube and in the rocker arm.
Illustration 18 g00628693
(14) Jumper tube. (15) Bolts. (16) Adapter. (17) Socket head screws.
Place the jumper tube (14) and the adapter (16) into position.
If the adapter was previously installed on the injector, loosen the socket head screws. Failure to loosen the socket head screws before continuing with Step 8 can result in injector failure.
Install the socket head screws (17) and the four bolts (15) finger tight.Note: The mating surfaces should be brought into complete contact and into alignment before the final torque procedure is started.
Failure to follow any of the procedures in this instruction may result in injector damage or malfunction, and possible major engine damage.
Torque Procedure
Illustration 19 g00338156
(1) Socket head screws.
Illustration 20 g00338157
(2) Two horizontal bolts. (3) Two vertical bolts.
Tighten the socket head screws (1), the two horizontal bolts (2), and the two vertical bolts (3) finger tight.
Tighten the socket head screws (1) to an initial torque of 1 .2 N m (9 2 lb in).
Tighten the horizontal bolts (2) to an initial torque of 5 3 N m (44 27 lb in).
Tighten the vertical bolts (3) to an initial torque of 5 3 N m (44 27 lb in).
Tighten the socket head screws (1) to a final torque of 12 3 N m (9 2 lb ft).
Tighten the horizontal bolts (2) to a final torque of 47 9 N m (35 7 lb ft).
Tighten the vertical bolts (3) to a final torque of 47 9 N m (35 7 lb ft).
Repeat Step 1 through Step 7 for the remainder of the injectors.
Check the fuel system for leaks by cranking the engine with the disabled injection. Then check the hydraulic pressure. Compare the pressure to the desired pressure.Cranking Without Injecting
Cranking the engine with the disabled injection may be performed by one of the following methods:
Disconnect the injector harness of the cylinders which have been reinstalled. Allow the engine to idle. Visually inspect the injector's components for high pressure oil leaks.
Activate the system "Crank Without Inject" if the option is available. On Track-Type Tractors, a "Crank Without Inject" plug can be assembled in the engine harness. On Off-Highway Trucks, the "Ground Level Shutdown" can be activated if the option is available.
When you are using the CAT ET or the ECAP, the injection may be disabled by interactive diagnostics. The engine can be left

Have questions with 101493-9110?





Group cross 101493-9110 ZEXEL

Nissan-Diesel 

101493-9110  

101493-9111 
F 01G 09U 02G 
167000T306 
INJECTION-PUMP ASSEMBLY
FD3
F 01G 09U 02H 
 
INJECTION-PUMP ASSEMBLY
F 01G 09U 02J 
 
INJECTION-PUMP ASSEMBLY

Nissan 

9 400 614 493 
167000T308 
INJECTION-PUMP ASSEMBLY
FD46

Nissan-Diesel 

9 400 614 493 
167000T308 
INJECTION-PUMP ASSEMBLY
FD46
9 400 614 494 
 
INJECTION-PUMP ASSEMBLY
FD46
Back to top