Information injection-pump assembly
BOSCH
9 400 614 472
9400614472
ZEXEL
101492-9160
1014929160
NISSAN-DIESEL
1679090273
1679090273

Rating:
Service parts 101492-9160 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
16600-T9303
12.
Open Pre:MPa(Kqf/cm2)
19.6{200}
15.
NOZZLE SET
Cross reference number
Zexel num
Bosch num
Firm num
Name
101492-9160
9 400 614 472
1679090273 NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FD33 * K
FD33 * K
Information:
PARTS NEEDED
Qty
Part Number Description
2 5P4115 WASHER-HARD
2 6S8620 CLAMP-HOSE
4 8T4121 WASHER-HARD
2 8T4171 BOLT-HEX HEAD
2 8T4195 BOLT-HEX HEAD
1 3550632 CONNECTOR-SPL
1 4609257 INJECTOR AS-DEF
1 4719926 TANK AS-ALUMINUM
1 4719927 PLATE AS
2 4719928 PLATE AS
9 4721116 HOSE-BULK (9cm)
1 5218238 SFWR GP-A1000
1 BULK_COOLANT COOLANT - See Action Required
In order to allow equitable parts availability to all participating dealers, please limit your initial parts order to not exceed 7% of dealership population. This is an initial order recommendation only, and the ultimate responsibility for ordering the total number of parts needed to satisfy the program lies with the dealer.
ACTION REQUIRED
1. Replace the DEF Injector, As per the Disassembly and Assembly, "DEF Injector and Mounting - Remove and Install". Please ensure that the coolant drained from the system is stored in a suitable storage container and not refilled until the end of the following procedure.
2. Position bracket assembly 471-9927 onto the CEM. Ensure that the bracket is correctly orientated. As per Image 1
3. Position the two 471-9928 plates onto the CEM and install 8T-4195 bolts with the 8T-4121 washers. As per Image 2
4. Position coolant tank 471-9926 onto bracket. Install bolts 8T-4171 with 5P-4115 washer. Tighten to 9 Nm. As per Image 1
5. Remove coolant supply hose 349-6234 from DEF injector and connect to tank 471-9926 inlet using existing clamp. As per Image 1
6. Connect hose assembly 472-1116 (9cm) to tank 471-9926 and the DEF injector. Secure with 2 off 6S?8620 clamps, As per Image 1
7. Refill the cooling system with coolant. Refer to Operation and Maintenance Manual, ?Cooling System Coolant - Change? for the correct procedure. If required, top up the coolant system.
8. Flash the engine ECM with the software or latest available in SIS Web.
For flash programming the engine ECM, refer to Troubleshooting, "Flash Programming".
Image1
Image2
SERVICE CLAIM ALLOWANCES
Product smu/age whichever comes first Caterpillar Dealer Suggested Customer Suggested
Parts % Labor Hrs% Parts % Labor Hrs% Parts % Labor Hrs%
0-3000 hrs,
0-36 mo 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
This is a 2.5-hour job
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Have questions with 101492-9160?
Group cross 101492-9160 ZEXEL
Daewoo
Nissan-Diesel
Daewoo
Nissan-Diesel
101492-9160
9 400 614 472
1679090273
INJECTION-PUMP ASSEMBLY
FD33
FD33