101492-3651 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014923651 6205711240


 

Information injection-pump assembly

ZEXEL 101492-3651 1014923651
KOMATSU 6205711240 6205711240
101492-3651 INJECTION-PUMP ASSEMBLY
Rating:
79
Buy INJECTION-PUMP ASSEMBLY 101492-3651 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-3651 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-8420
3. GOVERNOR 105400-4981
4. SUPPLY PUMP 105220-5360
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4160
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105048-3060
14. NOZZLE 105017-0140
15. NOZZLE SET

Include in #1:

101492-3651 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101492-3651 1014923651
KOMATSU 6205711240 6205711240


Zexel num
Bosch num
Firm num
Name
101492-3651 
101492-3720 
 
6205711240  KOMATSU
INJECTION-PUMP ASSEMBLY
S4D95L * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-4-3
Pre-stroke mm   3.2 3.15 3.25
Rack position
Point A
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cal 1-3
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.2
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   75.4 74.4 76.4
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7.6+-0.5
Pump speed r/min   475 475 475
Average injection quantity mm3/st.   10.5 9.5 11.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101492-3651
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK CAP: R1 (3)Rack difference between N = N1 and N = N2
----------
K=11 R1=(17.5)mm N1=1100r/min N2=750r/min
----------

Speed control lever angle

Test data 101492-3651
F:Full speed I:Idle S:Stop
----------

----------
a=(15deg)+-5deg b=32deg+-3deg c=(32deg)+-5deg

Timing setting

Test data 101492-3651
(1)Pump vertical direction (2)Position of key groove at No 1 cylinder's beginning of injection (3)Stamp aligning marks on the pump housing flange. (4)-
----------

----------
a=58deg+-3deg b=2deg+-30min




Information:


Before any service work is to be done on the fuel system, the outer surface of the injection pump housing must be clean.
Illustrations show fuel injection pump housing and governor removed from engines. Service work can be done with it installed on engine. 1. Remove the flange (1) and flange assembly (2) from the cover (3).2. Remove the cover from the pump housing by removing seven bolts. 3. Remove the solenoid (4) from the cover.4. Remove cover (6).5. Remove two bolts (5) that hold the cover to the shutoff housing. 6. Remove the cover from the shutoff housing (7). 7. Remove the lever (10) from the shaft (11).8. Remove the shaft (9) from the shutoff housing.9. Remove the lever (8) from the shaft (11).10. Remove the shaft (11) from the shutoff housing.11. Remove the seal (12) from the shutoff housing.Install Shutoff Housing
1. Put 5S1454 Sealing Compound on the outside diameter of the seal and install the seal (1) with tooling (A) in the shutoff housing with the lip toward the outside. The outer face of the seal must be .039 in. (1.0 mm) below the surface of the housing. Remove the extra sealing compound from the housing and the seal after installation. 2. Install the shaft (3) in the shutoff housing.3. Install the lever (5) on the shaft (3).4. Install shaft (2) in the shutoff housing.5. Install the lever (4) on shaft (3). 6. Put the cover (6) in position on the shutoff housing and install two bolts that hold the cover to the housing. 7. Install the cover (8).8. Install the solenoid (7) on the cover.9. Install the cover (6) on the pump housing.10. Install the flange assembly and the flange on the cover.

Have questions with 101492-3651?





Group cross 101492-3651 ZEXEL

Komatsu 

 
 
INJECTION-PUMP ASSEMBLY
4D95L
 
6204711720 
INJECTION-PUMP ASSEMBLY
4D95L
 
6204711730 
INJECTION-PUMP ASSEMBLY
4D95L
9 400 610 195 
6204711450 
INJECTION-PUMP ASSEMBLY
4D95L
 
6204711270 
INJECTION-PUMP ASSEMBLY
4D95L
 
 
INJECTION-PUMP ASSEMBLY
S4D95L
 
6205711230 
INJECTION-PUMP ASSEMBLY
S4D95L
 
 
INJECTION-PUMP ASSEMBLY
S4D95L
101492-3651  

101492-3720 
 
6205711240 
INJECTION-PUMP ASSEMBLY
S4D95L
 
 
INJECTION-PUMP ASSEMBLY
4D95L
 
6204711460 
INJECTION-PUMP ASSEMBLY
4D95L
 
 
INJECTION-PUMP ASSEMBLY
S4D95L
 
 
INJECTION-PUMP ASSEMBLY
4D95L
9 400 614 446 
6204711280 
INJECTION-PUMP ASSEMBLY
4D95L
Back to top