101492-3491 ZEXEL 9 400 614 441 BOSCH INJECTION-PUMP ASSEMBLY 9400614441 1014923491 6204711220


 

Information injection-pump assembly

BOSCH 9 400 614 441 9400614441
ZEXEL 101492-3491 1014923491
KOMATSU 6204711220 6204711220
101492-3491 INJECTION-PUMP ASSEMBLY
Rating:
60
Buy INJECTION-PUMP ASSEMBLY 101492-3491 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-3491 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-8280
3. GOVERNOR 105400-3851
4. SUPPLY PUMP 105220-5360
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4110
11. Nozzle and Holder 6207-11-3100
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105048-3060
14. NOZZLE 105017-0090
15. NOZZLE SET

Include in #1:

101492-3491 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 614 441 9400614441
ZEXEL 101492-3491 1014923491
KOMATSU 6204711220 6204711220


Zexel num
Bosch num
Firm num
Name
101492-3491 
101492-3730 
9 400 614 441 
6204711220  KOMATSU
INJECTION-PUMP ASSEMBLY
4D95L K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-4-3
Pre-stroke mm   3.6 3.55 3.65
Rack position
Point A
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cal 1-3
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.4
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   34.4 33.4 35.4
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   10.2+-0. 5
Pump speed r/min   450 450 450
Average injection quantity mm3/st.   10.5 9.5 11.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101492-3491
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK CAP: R1 (4)The torque control spring must does not have a set force. (5)Rack difference between N = N1 and N = N2
----------
K=16 R1=(17.5)mm N1=1050r/min N2=750r/min
----------

Speed control lever angle

Test data 101492-3491
F:Full speed I:Idle S:Stop (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=32deg+-3deg c=24deg+-5deg

Timing setting

Test data 101492-3491
(1)Pump vertical direction (2)Position of key groove at No 1 cylinder's beginning of injection (3)Stamp aligning marks on the pump housing flange. (4)-
----------

----------
a=59deg36min+-3deg b=0deg24min+-30min




Information:

1. Disconnect air line (1) at fitting. Remove two bolts (2). Pull up and toward the front of the engine to remove the bolt of the fuel ratio from the groove (slot) in the collar for the governor. Remove fuel ratio control (3). Remove gasket from fuel ratio control.2. Install a new gasket on fuel ratio control. Install fuel ratio control (3). Make sure bolt engages with stop collar in governor control.3. Install two bolts (2). Connect air line (1) at fitting.4. Make sure the fuel ratio control is in correct adjustment. See Systems Operation Testing & Adjusting Manual for this procedure.5. Install a new governor seal.Disassemble Fuel Ratio Control
Start By:a. remove fuel ratio control 1. Remove two bolts (1) and the housing (2). 2. Remove valve assembly (3).3. Remove seal (4) and O-ring seal from valve.4. Remove the retainer (5) and two springs (6). 5. Remove three bolts (9) and cover (10).6. Remove valve (7), diaphragm (8), retainer and spring. 7. Remove pin (12) from valve (7).8. Remove cover (11) from the valve.9. Remove the seal from the cover (11).Assemble Fuel Ratio Control
1. Put clean engine oil on lip of seal. Install the seal (1) in cover (2). Install seal so lip of seal is toward the inside of the cover. 2. Install the valve (3) into cover (2).3. Install the pin that holds cover on valve. 4. Install spring (7) and the retainer (6) in cover (8).5. Install diaphragm (5) on the valve assembly (4) and in the cover. 6. Install cover and three bolts (11) that hold covers together.7. Put clean engine oil on seal and ring seal. Install the seals (10) on valve.8. Install the two springs (13), retainer and valve assembly (12).9. Install housing (9) and two bolts.
Correct adjustment must be made to fuel ratio control before installation. See Systems Operation Testing & Adjusting for this procedure.
End By:a. install fuel ratio control

Have questions with 101492-3491?





Group cross 101492-3491 ZEXEL

Komatsu 

9 400 614 435 
6144731111 
INJECTION-PUMP ASSEMBLY
4D94
9 400 614 436 
6204711210 
INJECTION-PUMP ASSEMBLY
4D95L
 
6204711250 
INJECTION-PUMP ASSEMBLY
4D95L
9 400 614 437 
6204711710 
INJECTION-PUMP ASSEMBLY
4D95L
 
6204711260 
INJECTION-PUMP ASSEMBLY
4D95L
9 400 614 438 
6204711410 
INJECTION-PUMP ASSEMBLY
4D95L
 
6204711510 
INJECTION-PUMP ASSEMBLY
4D95L
9 400 614 439 
6204711430 
INJECTION-PUMP ASSEMBLY
4D95L
9 400 614 440 
6204711240 
INJECTION-PUMP ASSEMBLY
4D95L
101492-3491  

101492-3730 
9 400 614 441 
6204711220 