101492-3240 ZEXEL 9 400 610 241 BOSCH INJECTION-PUMP ASSEMBLY 9400610241 1014923240 6130721111


 

Information injection-pump assembly

BOSCH 9 400 610 241 9400610241
ZEXEL 101492-3240 1014923240
KOMATSU 6130721111 6130721111
101492-3240 INJECTION-PUMP ASSEMBLY
Rating:
36
Buy INJECTION-PUMP ASSEMBLY 101492-3240 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-3240 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-8090
3. GOVERNOR 105402-1520
4. SUPPLY PUMP 105220-1810
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156612-9520
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-4980
11. Nozzle and Holder 6130-12-3100
12. Open Pre:MPa(Kqf/cm2) 22.1{225}
13. NOZZLE-HOLDER 105031-3510
14. NOZZLE 105015-3590
15. NOZZLE SET

Include in #1:

101492-3240 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 241 9400610241
ZEXEL 101492-3240 1014923240
KOMATSU 6130721111 6130721111


Zexel num
Bosch num
Firm num
Name
101492-3240 
9 400 610 241 
6130721111  KOMATSU
INJECTION-PUMP ASSEMBLY
4D105 K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-4-3
Pre-stroke mm   3 2.95 3.05
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cal 1-3
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   C
Rack position   8.5
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   45.5 44.5 46.5
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   E
Rack position   8.1
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   14 12.6 15.4
Max. variation between cylinders %   0 -10 10
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101492-3240
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Supplied with torque spring not set.
----------
K=13
----------

Speed control lever angle

Test data 101492-3240
F:Full speed I:Idle S:Stop
----------

----------
a=12deg+-5deg b=32deg+-3deg c=20deg+-3deg




Information:

Start By:a. remove valve covers 1. Use Tool (A) to disconnect fuel injection line (1) at both ends. Remove the fuel injection line from the engine. 2. Use Tool (B) to remove retainer (2) from the adapter.3. Remove the fuel injection nozzles with Tooling (C) as follows:a. Install the 6V-6983 Adapter and the 8T-3199 Screw into nozzle assembly (3).b. Install the 8T-3198 Tube over the 8T-3199 Screw.c. Use the 1B-4206 Nut on the 8T-3199 Screw to pull the fuel injection nozzle from the adapter.4. Remove compression seal (4) and carbon dam seal (8) from fuel injection nozzle (3).5. Use Tool (D) to remove adapter (6) from the cylinder head.6. Remove gasket (7) and seal (5) from adapter (6). The following steps are for installation of the fuel injection nozzles and adapters.7. Use Tool (E) to clean the bore in adapter (6). Use an open end wrench or tap driver to turn Tool (E).8. Inspect seal (5) for damage or wear. Replace the seal if necessary.9. Put washer (7) and seal (5) in position on adapter (6).10. Put liquid soap in the bores of the cylinder head and on seals (5) in the adapters.11. Put 5P-3931 Anti-Seize Compound on the threads of adapter (6), and install the adapter in the cylinder head assembly.12. Use Tool (D), and tighten the adapter to a torque of 205 14 N m (150 10 lb ft).
Make sure the correct compression seal washer (4) is used when the nozzle assembly is installed in the adapter. Only copper washers are to be used with this adapter.
13. Install compression seal washer (4), and use Tool (F) to install carbon dam seal (8) on the fuel injection nozzle.14. Put fuel injection nozzle (3) in position in the adapter, and install retainer (2).15. Use Tool (B) to tighten retainer (2) to a torque of 48 7 N m (35 5 lb ft).16. Install fuel line (1). Tighten the nuts on the fuel line with Tool (A) to a torque of 40 7 N m (30 5 lb ft).End By:a. install valve covers

Have questions with 101492-3240?





Group cross 101492-3240 ZEXEL

Komatsu 

 
6130721250 
INJECTION-PUMP ASSEMBLY
P065
 
6130751601 
INJECTION-PUMP ASSEMBLY
4D105
 
6130751701 
INJECTION-PUMP ASSEMBLY
4D105
 
6130751900 
INJECTION-PUMP ASSEMBLY
4D105
101492-3240  
9 400 610 241 
6130721111 
INJECTION-PUMP ASSEMBLY
4D105
 
6130751300 

 
6130721211 
INJECTION-PUMP ASSEMBLY
4D105
 
6130751301 
INJECTION-PUMP ASSEMBLY
4D105
 
6130751901 
INJECTION-PUMP ASSEMBLY
4D105