101492-1211 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014921211


 

Information injection-pump assembly

ZEXEL 101492-1211 1014921211
101492-1211 INJECTION-PUMP ASSEMBLY
Rating:
19
Buy INJECTION-PUMP ASSEMBLY 101492-1211 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-1211 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-9890
3. GOVERNOR 105402-2102
4. SUPPLY PUMP 105220-6150
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156636-5320
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4050
11. Nozzle and Holder ME019368
12. Open Pre:MPa(Kqf/cm2) 17.7{180}
13. NOZZLE-HOLDER 105048-3010
14. NOZZLE 105017-0040
15. NOZZLE SET

Include in #1:

101492-1211 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101492-1211 1014921211


Zexel num
Bosch num
Firm num
Name
101492-1211 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.8
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   58.5 57.5 59.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   8.2+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   7.5 6.2 8.8
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   C
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   60.5 60.5 65.5
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101492-1211
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Torque spring does not operate. (4)RACK LIMIT (5)Set at delivery (6)Rack difference between N = N1 and N = N2 (7)Set idle sub-spring
----------
K=16 N1=900r/min N2=600r/min
----------

Speed control lever angle

Test data 101492-1211
F:Full speed I:Idle S:Stop (1)Rack position = aa or less (2)At delivery
----------
aa=1mm
----------
a=(7deg)+-5deg b=(19deg)+-5deg c=(35deg) d=(0deg)+-5deg

Stop lever angle

Test data 101492-1211
N:Pump normal S:Stop the pump.
----------

----------
a=27deg+-5deg b=53deg+-5deg

Timing setting

Test data 101492-1211
(1)Pump vertical direction (2)Position of gear mark '3' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(130deg)




Information:

1. Disconnect air line (1) from the fuel ratio control.2. Remove wire seal (4) from the bolts.3. Remove bolts (3) that hold fuel ratio control (2).4. Remove the fuel ratio control by pulling down and out from the collar. The following steps are for the installation of the fuel ratio control.5. Put fuel ratio control (2) in position on the governor. Make sure the valve head of the fuel ratio control is connected in the groove of the collar.6. Install bolts (3) that hold the fuel ratio control to the governor. Connect air line (1) to the fuel ratio control.7. To make an adjustment to the fuel ratio control, see the topic "Governor Adjustment For The Air Fuel Ratio Control" in, Testing & Adjusting Manual SENR6471.8. Install wire seal (4) on the bolts with Tool (A).Disassemble & Assemble Fuel Ratio Control
Start By:a. remove fuel ratio control 1. Put Tool (A) in a vise so that the station being used is not over the vise jaw. Place the fuel ratio control over the pins in Tool (A). Remove bolts (3) and remove cover (26) and gasket (24).
There is spring force behind cover (7). Hold cover (7) in position, and slowly remove the bolts that hold it to release the spring force.
2. Remove bolts (6). Remove cover (7) from housing (10).3. Remove nut (5) and stop (4) from cover (7).4. Remove spring (8), washer (9) and diaphragm (21) from retainer (25). Remove retainer (25) from housing (10).5. Remove tube (1) from the end of extension (19). Remove nut (2) from extension (19) and remove the extension from retainer (25). Remove valve (16), spring (22) and O-ring seal (23) from the extension.6. Remove spring (20), retainer (18) and spring (17) from housing (10).7. Remove piston (12) and valve assembly (14) from the housing.8. Use Tool (B) and remove snap ring (13) and washer (15) from the valve assembly. Remove piston (12) from the valve assembly.9. Remove seal (11) from piston (12).10. If necessary, remove the stem portion from valve assembly (14).11. Clean and inspect all parts. Make a replacement of all parts that are worn and damaged. The following steps are for the assembly of the fuel ratio control.12. If removed during disassembly, assemble the stem portion of valve assembly (14) on the valve using 9S3265 Retaining Compound.13. Lubricate seal (11) lightly with the lubricant being sealed. Put seal (11) on piston (12) and put piston (12) on valve assembly (14).14. Put washer (15) in position on the valve assembly and use Tool (B) to install snap ring (13) on the valve assembly.15. Place housing (10) on Tool (A), and put Tool (C) into the bore of the housing. Lubricate Tool (C) with clean engine oil.16. Push piston (12) into position with a smooth swift motion. Remove Tool (C) from the housing. Place spring (17), retainer (18) and spring (20) in housing (10).17. Put O-ring seal (23) on extension (19). Put spring (22) and valve (16) in position on the

Have questions with 101492-1211?





Group cross 101492-1211 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 614 432 
ME080595 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
101492-1211  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 545 
ME080668 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 546 
ME080864 
INJECTION-PUMP ASSEMBLY
4D31T
Back to top