Information injection-pump assembly
ZEXEL
101492-1011
1014921011
MITSUBISHI
ME019335
me019335

Rating:
Service parts 101492-1011 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
17.7(180)
15.
NOZZLE SET
Cross reference number
ZEXEL
101492-1011
1014921011
MITSUBISHI
ME019335
me019335
Zexel num
Bosch num
Firm num
Name
101492-1011
ME019335 MITSUBISHI
INJECTION-PUMP ASSEMBLY
4D31T * K
4D31T * K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-4620
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
3.2
3.15
3.25
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
9.8
Pump speed
r/min
975
975
975
Average injection quantity
mm3/st.
66.4
65.4
67.4
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
8.2+-0.5
Pump speed
r/min
375
375
375
Average injection quantity
mm3/st.
7.5
6.2
8.8
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
C
Rack position
11.6+-0.
5
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
60.5
60.5
65.5
Fixing the lever
*
Injection quantity adjustment_04
Adjusting point
D
Rack position
7.6+-0.5
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
8
7
9
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)RACK LIMIT
(3)Torque spring does not operate.
(4)Setting at shipping
(5)Idle sub spring setting: L1.
(6)Rack difference between N = N1 and N = N2
----------
K=7 L1=9.2+-0.1mm N1=975r/min N2=600r/min
----------
----------
K=7 L1=9.2+-0.1mm N1=975r/min N2=600r/min
----------
Speed control lever angle

F:Full speed
I:Idle
(1)At shipping
(2)Stopper bolt setting
----------
----------
a=18deg+-5deg b=5deg+-5deg c=(12deg)
----------
----------
a=18deg+-5deg b=5deg+-5deg c=(12deg)
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=27deg+-5deg b=53deg+-5deg
----------
----------
a=27deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark '3' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=16deg
----------
a=(130deg)
----------
aa=16deg
----------
a=(130deg)
Information:
1. Turn the engine counterclockwise (as seen from the flywheel end of the engine) with Tool (A) until the No. 1 piston is at top center (TC) on the compression stroke. Install the timing bolt. Install 6V-2112 Timing Pin through the hole in the injection pump housing. See the topic "Finding Top Center Compression Position for NO. 1 Piston" in SENR6577 Testing & Adjusting. Tool (B), 6V-2112 Timing Pin, replaces 6V-6019 Timing Pin. 2. Remove two bolts (1).3. Remove eleven bolts (2) and cover (3). 4. Remove four bolts (5), retainer (6) and automatic timing advance (4).Install Automatic Timing Advance
1. Install automatic timing advance (4). Install retainer (6) and four bolts (5).2. Tighten the bolts (5) with fingers until there is a small amount of friction (slight drag) between the retainer and automatic timing advance (4). This friction will hold the unit against the timing gears. This prevents play (backlash) when gears are turned to the correct position.3. Remove the timing bolt. Turn the flywheel until the timing pin will go into the groove in the injection pump camshaft.4. With the timing pin installed, turn the flywheel clockwise (opposite the direction of engine rotation) a minimum of 30 degrees. The reason for this step is to be sure the play is removed from the timing gears when the engine is put on top center (TC).5. Turn the flywheel in the direction of engine rotation until the No. 1 piston of the engine is on top center compression stroke. Then turn the timing bolt into the threaded hole in the flywheel.6. Tighten bolts (5) to 25 N m (20 lb ft). Then remove the timing pin from the injection pump housing.7. Tighten bolts (5) to 135 7 N m (100 5 lb ft). Then remove the timing bolt from the flywheel.8. Turn the crankshaft two complete revolutions and check the timing again to see that timing pin will go into the groove in the injection pump camshaft with bolt in flywheel.9. If timing is not correct, do the procedure of Steps 1 through 7 again. If the timing is correct, be sure to remove the timing pin and the timing bolt. 5. Install eleven bolts (2) and cover (3).6. Install two bolts (1). Disassemble Automatic Timing Advance
Start By:a. remove automatic timing advance 1. Remove flange assembly (1). 2. Remove two springs (2) and two weights (3) from drive gear assembly (4). 3. Remove two slides (5) from pistons (6).4. Separate drive gear assembly (4) from advance sleeve (7).Assemble Automatic Timing Advance
1. Put weights (3) in position in flange assembly (1) as shown.2. Install springs (2) in flange assembly (1). 4. Use 1P-008 General Purpose Lubricant to hold slides (5) in position on drive gear assembly (4). Install slides (5) on pistons (6).5. Install advance sleeve (7) to drive gear assembly (4). 6. Install drive gear assembly (4) on flange assembly (1). Make sure slides (5) fit in grooves of the weights.End By:a. install automatic timing advance
1. Install automatic timing advance (4). Install retainer (6) and four bolts (5).2. Tighten the bolts (5) with fingers until there is a small amount of friction (slight drag) between the retainer and automatic timing advance (4). This friction will hold the unit against the timing gears. This prevents play (backlash) when gears are turned to the correct position.3. Remove the timing bolt. Turn the flywheel until the timing pin will go into the groove in the injection pump camshaft.4. With the timing pin installed, turn the flywheel clockwise (opposite the direction of engine rotation) a minimum of 30 degrees. The reason for this step is to be sure the play is removed from the timing gears when the engine is put on top center (TC).5. Turn the flywheel in the direction of engine rotation until the No. 1 piston of the engine is on top center compression stroke. Then turn the timing bolt into the threaded hole in the flywheel.6. Tighten bolts (5) to 25 N m (20 lb ft). Then remove the timing pin from the injection pump housing.7. Tighten bolts (5) to 135 7 N m (100 5 lb ft). Then remove the timing bolt from the flywheel.8. Turn the crankshaft two complete revolutions and check the timing again to see that timing pin will go into the groove in the injection pump camshaft with bolt in flywheel.9. If timing is not correct, do the procedure of Steps 1 through 7 again. If the timing is correct, be sure to remove the timing pin and the timing bolt. 5. Install eleven bolts (2) and cover (3).6. Install two bolts (1). Disassemble Automatic Timing Advance
Start By:a. remove automatic timing advance 1. Remove flange assembly (1). 2. Remove two springs (2) and two weights (3) from drive gear assembly (4). 3. Remove two slides (5) from pistons (6).4. Separate drive gear assembly (4) from advance sleeve (7).Assemble Automatic Timing Advance
1. Put weights (3) in position in flange assembly (1) as shown.2. Install springs (2) in flange assembly (1). 4. Use 1P-008 General Purpose Lubricant to hold slides (5) in position on drive gear assembly (4). Install slides (5) on pistons (6).5. Install advance sleeve (7) to drive gear assembly (4). 6. Install drive gear assembly (4) on flange assembly (1). Make sure slides (5) fit in grooves of the weights.End By:a. install automatic timing advance
Have questions with 101492-1011?
Group cross 101492-1011 ZEXEL
Mitsubishi
101492-1011
ME019335
INJECTION-PUMP ASSEMBLY
4D31T
4D31T