101492-1000 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1014921000 me019330


 

Information injection-pump assembly

ZEXEL 101492-1000 1014921000
MITSUBISHI ME019330 me019330
101492-1000 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 101492-1000 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101492-1000 
 
ME019330  MITSUBISHI
INJECTION-PUMP ASSEMBLY
4D31T * K




Information:

1. Remove the plug from location (1). Install Tool (A) in the hole with the square end down. Move the governor control to the "ON" position until the rack stops against Tool (A). The racks are now in center (zero) position. 2. Disconnect lines (2) from the fuel injection pumps. Remove washers (3). Put caps on all fuel openings.3. Remove bushing (4) with Tool (B).
When injection pumps, spacers and lifters are removed from the injection pump housing, keep the parts of each pump together so they can be installed back in their original location.
4. Remove fuel injection pump with Tool (C).
Be careful when the injection pumps are disassembled. Do not cause damage to the surface on the plunger. The plunger and barrel for each pump are made as a set. Do not put the plunger of one pump in the barrel of another pump. If one part has wear install a complete new pump assembly. Be careful when the plunger is put into the bore of the barrel.
5. Disassemble the fuel injection pump. Remove ring (6). Make a separation of bonnet (5) from the plunger and barrel assembly (7).
Do not remove the gear from the plunger. The gear and plunger are assembled and adjusted at the factory.
6. Remove the plunger and gear segment, washer and spring from the barrel.7. Remove the ring, spring, collar and valve from the barrel. 8. Remove spacer (8) from the pump bore.Install Fuel Injection Pumps
Make sure the fuel racks are in the center (zero) position before the fuel injection pumps are installed. 1. Put plunger (10), washer (5) and spring (9) in position on barrel (4). Put check valve assembly (7), spring (3) and collar (8) in position in bonnet (6). Connect bonnet (6) and barrel (4) together with ring (2). Keep seal (1) with bonnet for use at installation. 2. Put spacer (13) into position in the pump housing bore. Make sure the correct spacer is with each pump.3. Put the space in gear segment (11) in alignment with the groove in barrel (4). 4. Put the injection pump straight down into the housing bore so the space in gear segment (11) is in alignment with pin (12) and the groove in barrel (4) is in alignment with dowel (14). Use Tool (C) to install the pump. 5. Install the seal and bushing (15) in the pump housing bore. If the pump is in the correct position, bushing (15) will turn into the threads of the pump housing with the fingers until it is even with the housing. Tighten bushing (15) to a torque of 205 14 Nm (150 10 lb ft) with Tool (B).6. Install washers (16).7. Connect the fuel lines to the injection pumps and tighten fuel line nuts to a torque of 40 7 Nm (30 5 lb ft) with Tool (D).8. Check for correct installation of the injection pumps with the engine stopped. See the topic "Installation of Injection Pump" in the Systems

Have questions with 101492-1000?





Group cross 101492-1000 ZEXEL

Mitsubishi 

101492-1000  
 
ME019330 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME019335 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME019337 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
9 400 614 421 
ME017757 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME017758 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31PT
9 400 614 422 
ME017813 
INJECTION-PUMP ASSEMBLY
4D31PT
 
 
INJECTION-PUMP ASSEMBLY
4D31T
9 400 614 423 
ME017863 
INJECTION-PUMP ASSEMBLY
4D31T
9 400 614 424 
ME018037 
INJECTION-PUMP ASSEMBLY
4D31CT
 
ME018041 
INJECTION-PUMP ASSEMBLY
4D31T
9 400 614 425 
ME017996 
INJECTION-PUMP ASSEMBLY
4D31PT
Back to top