101492-0992 ZEXEL 9 400 611 318 BOSCH INJECTION-PUMP ASSEMBLY 9400611318 1014920992 8972142953


 

Information injection-pump assembly

BOSCH 9 400 611 318 9400611318
ZEXEL 101492-0992 1014920992
ISUZU 8972142953 8972142953
101492-0992 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 101492-0992 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-0992 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-5130
3. GOVERNOR 105400-8841
4. SUPPLY PUMP 105220-6560
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156643-1220
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-6721
11. Nozzle and Holder 8-97211-280-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3230
14. NOZZLE 105017-2690
15. NOZZLE SET

Include in #1:

101492-0992 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 611 318 9400611318
ZEXEL 101492-0992 1014920992
ISUZU 8972142953 8972142953


Zexel num
Bosch num
Firm num
Name
101492-0992 
9 400 611 318 
8972142953  ISUZU
INJECTION-PUMP ASSEMBLY
4JG1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-0820
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   2.6 2.55 2.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.4
Pump speed r/min   950 950 950
Average injection quantity mm3/st.   54 53 55
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.8+-0.5
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   11.5 9.5 13.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101492-0992
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Set idle sub-spring (4)Main spring setting (5)Rack difference from N = N1
----------
K=10 N1=700r/min
----------

Speed control lever angle

Test data 101492-0992
F:Full speed I:Idle S:Stop
----------

----------
a=0deg+-5deg b=16deg+-5deg c=35deg+-3deg

Stop lever angle

Test data 101492-0992
N:Pump normal S:Stop the pump. (1)Normal
----------

----------
a=2.5deg+-5deg b=53deg+-5deg

Timing setting

Test data 101492-0992
(1)Pump vertical direction (2)Position of gear mark 'W' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(210deg)




Information:

1. Disconnect fuel lines (1) from fuel transfer pump (3). Remove bolts (2). Remove fuel transfer pump (3). Remove gasket from fuel transfer pump.2. Install a new gasket on fuel transfer pump (3). Install fuel transfer pump on rear plate with the bolts (2) that hold it. Connect fuel lines (1) to the fuel transfer pump.Disassemble Fuel Transfer Pump
Start By:a. remove fuel transfer pump 1. Remove tachometer drive (3) from transfer pump cover (4).2. Remove bolts (1). Make a separation between cover (4) and pump body (2). 3. Remove lip-type seal (6) from the cover. Remove plug (5), seal, spring and plunger (bypass valve) from the cover. 4. Remove nut (10) from shaft (7). Remove gear (9) and key (11).5. Remove shaft (7) and gear (8) as a unit. Remove gear (8) from drive shaft (7) with a press.6. Remove idler gear (12). 7. Remove bushing (14), two lip-type seals and the bottom bearing from pump body (1).8. Remove check valve (13). Assemble Fuel Transfer Pump
1. Install bushing (4) in body (3) with Tooling (B). The bushing must not be extended above the (gear) surface of the body.2. Install the check valve in the body with Tooling (A).3. Install lip-type seal (5) with Tooling (C). Install the seal until it is 24.6 0.5 mm (97 .02) from the bottom surface of body (3) and with the lip toward bushing (4) as shown.4. Install lip-type seal (6) with Tooling (D). Install the seal until it is 14.2 0.5 mm (.56 .02 in) from the bottom surface of body (3) and with the lip away from seal (5) as shown.5. Install bearing (7) in body (3) with Tooling (E). The bearing must be even with the surface of the pump body. 6. Heat gear (8) to a maximum temperature of 316°C (600°F). Install gear (8) on shaft (11) until dimension (X) is 49.71 0.25 mm (1.957 0.10 in).7. Install the drive shaft and gear in body (3). Install key, gear (10) and nut (9). Tighten the nut to a torque of 28 7 N m (22 5 lb ft).8. Install idler gear (12) in body (3).9. Install lip-type seal (2) with Tooling (C). Install the seal until it is 3.8 0.5 mm (.15 .02 in) from the top surface of cover (1) with the lip toward the inside as shown. 10. Install plunger (14) (bypass valve), spring (15), seal plug (13) in pump cover (1). Tighten plug (13) to a torque of 28 4 N m (27 3 lb ft).11. Put 7M-7260 Liquid Gasket Material on the surface of cover (1). Install cover (1) on pump body.
Do not let the liquid gasket enter the pump.
The drive shaft must turn freely after the bolts that hold the transfer pump together are tightened.12. Install tachometer drive on transfer pump cover (1).End By:a. install fuel transfer pump

Have questions with 101492-0992?





Group cross 101492-0992 ZEXEL

Isuzu 

9 400 614 414 
8971903740 
INJECTION-PUMP ASSEMBLY
4JB1
 
8971903680 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 987 
8971903681 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 415 
8971912780 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 416 
8971915150 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 417 
8972063600 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 418 
8972103020 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 419 
8972110560 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 420 
8972117310 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 612 995 
8972118880 
INJECTION-PUMP ASSEMBLY
4JB1
 
8972142951 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 611 503 
8972142952 
INJECTION-PUMP ASSEMBLY
4JG1
101492-0992  
9 400 611 318 
8972142953 
INJECTION-PUMP ASSEMBLY
4JG1
Back to top