101492-0870 ZEXEL 9 400 614 412 BOSCH INJECTION-PUMP ASSEMBLY 9400614412 1014920870 8971866180


 

Information injection-pump assembly

BOSCH 9 400 614 412 9400614412
ZEXEL 101492-0870 1014920870
ISUZU 8971866180 8971866180
101492-0870 INJECTION-PUMP ASSEMBLY
Rating:
71
Buy INJECTION-PUMP ASSEMBLY 101492-0870 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-0870 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-9981
3. GOVERNOR 105400-8450
4. SUPPLY PUMP 105220-7280
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156639-1720
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-6211
11. Nozzle and Holder 8-97134-524-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3230
14. NOZZLE 105017-2030
15. NOZZLE SET

Include in #1:

101492-0870 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101492-0870 
9 400 614 412 
8971866180  ISUZU
INJECTION-PUMP ASSEMBLY
4JB1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE




Information:

1. Disconnect hose (1) at governor control cylinder (2).2. Remove pin (4).3. Remove governor control cylinder (2).4. Note the position of linkage (3) in the lever, and remove linkage (3). The following steps are for installation of the governor control cylinder.5. Adjust linkage (3) so the distance between rod end centers is 84.07 mm (3.309 in).6. Install linkage (3) in its original position in the lever.7. Be sure lever (5) on the governor shaft is at 15 degrees from vertical (CW when viewed from the left side of the machine) with engine at low idle.8. Install control cylinder (2). Install pin (4) through link (3) and lever (5).9. Connect hose (1) to governor control cylinder (2).10. Adjust linkage (3) so lever (5) is at low idle when governor control cylinder is fully retracted.Disassemble & Assemble Governor Control Cylinder
Start By:a. remove governor control cylinder 1. Remove cover (1).
A spring force of 44.5 N (10 lb) will be released when the bolt that holds piston (8) is removed. Hold the components of the governor control cylinder to prevent unexpected movement of components and personal injury.
2. Remove the bolt that holds piston (6), and remove the piston and springs.3. Remove O-ring seal (2) and sleeve (5).4. Remove seals (3) and (4) from piston (6). The following steps are for the assembly of the governor control cylinder.5. Install lip-type seal (3) and "T" seal on the piston (6). Install the lip-type seal with the lip facing the cylinder pressure source.6. Install shell (5) in the air chamber body.7. Put 5P-0960 Multipurpose Grease inside the shell.8. Carefully install piston (6) and springs into the air chamber body.9. Install the bolt to hold the piston.10. Install O-ring seal (2) and cover (1).End By:a. install governor control cylinder

Have questions with 101492-0870?





Group cross 101492-0870 ZEXEL

Isuzu 

 
8971385890 
INJECTION-PUMP ASSEMBLY
4BC2
 
8971385910 
INJECTION-PUMP ASSEMBLY
4BC2
 
8971385770 
INJECTION-PUMP ASSEMBLY
4BC2
F 019 Z10 105 
 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 542 
8971762010 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 543 
8971680740 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 544 
8971738820 
INJECTION-PUMP ASSEMBLY
4JB1
101492-0870  
9 400 614 412 
8971866180 
INJECTION-PUMP ASSEMBLY
4JB1
 
8971912790 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 986 
8971912791 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 413 
8971903730 
INJECTION-PUMP ASSEMBLY
4JA1
Back to top