Information injection-pump assembly
ZEXEL
101492-0770
1014920770
ISUZU
8971348730
8971348730

Rating:
Service parts 101492-0770 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
8-97134-524-0
12.
Open Pre:MPa(Kqf/cm2)
18.1{185}
15.
NOZZLE SET
Cross reference number
ZEXEL
101492-0770
1014920770
ISUZU
8971348730
8971348730
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-0820
Overflow valve opening pressure
kPa
127
107
147
Overflow valve opening pressure
kgf/cm2
1.3
1.1
1.5
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Left L
Left L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left L
Left L
Injection order
1-3-4-2
Pre-stroke
mm
3.3
3.25
3.35
Rack position
Point A R=A
Point A R=A
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
7.4
Pump speed
r/min
1075
1075
1075
Average injection quantity
mm3/st.
59.5
58.5
60.5
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
C
Rack position
5.3+-0.5
Pump speed
r/min
540
540
540
Average injection quantity
mm3/st.
8.5
6.5
10.5
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Injection quantity adjustment_03
Adjusting point
D
Rack position
14++
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
70
70
102
Fixing the lever
*
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Set idle sub-spring
(4)Main spring setting
----------
K=15
----------
----------
K=15
----------
Speed control lever angle

F:Full speed
I:Idle
S:Stop
----------
----------
a=13deg+-5deg b=15deg+-5deg c=35deg+-3deg
----------
----------
a=13deg+-5deg b=15deg+-5deg c=35deg+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=0deg+-5deg b=53deg+-5deg
----------
----------
a=0deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'V' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=14deg
----------
a=(210deg)
----------
aa=14deg
----------
a=(210deg)
Information:
1. Remove two bolts (4) that hold tube assembly (1) to the engine block.2. Remove one bolt (not shown) that holds pipe (3) to oil pump (2). Remove the pipe and tube assembly as a unit. 3. Remove three bolts (5). Remove oil pump (2).Install Oil Pump
1. Check the O-ring seals for damage. If damaged, use new parts for replacement. 2. Put oil pump (1) in position. Install the three bolts that hold the oil pump to the engine. 3. Put clean engine oil on all O-ring seals, and install pipe (2) and tube assembly (3) in the oil pump as a unit. Install two bolts that fasten the pipe assembly to the engine block.End By:a. install oil panDisassemble Oil Pump
Start By:a. remove oil pump1. Remove the bolt and washer that hold the gear on the shaft. 2. Use Tooling (A) to remove drive gear (1) from the shaft. Remove the key from shaft. 3. Remove retainer (3) for the bypass valve.4. Remove the spring and bypass valve.5. Remove cover (2) from the pump body. 6. Use Tooling (B) to remove the bearings from the cover. 7. Remove gears (5) from pump body (4).8. Use Tooling (B) to remove the bearings from the pump body.Assemble Oil Pump
1. Use Tooling (A) to install the bearings in the main pump body until they are even with the outside surface of the pump body. Install the bearings so the junctions in the bearings are 30 15 degrees from the center of the bearing bores and toward the oil pump outlet passage (2) as shown. 2. Install idler gear (1) and drive gear (3) in the oil pump body. Put clean engine oil on the bearings and gears. 3. Use Tooling (A) to install the bearings in cover (4) until they are even with the outside surface of the cover. Install the bearings so the junctions in the bearings are 30 15 degrees from the center of the bearing bores and toward the oil pump outlet passage as shown. 4. Install bypass valve (5), spring (6), spacer and the retainer in the pump body.5. Install the key on the shaft. 6. Install gear (7) on the shaft. Install the washer and bolt that holds the gear on the shaft. Tighten the bolt to a torque of 55 7 N m (41 5 lb ft).7. Make sure the pump turns freely by hand after it is assembled.End By:a. install oil pump
1. Check the O-ring seals for damage. If damaged, use new parts for replacement. 2. Put oil pump (1) in position. Install the three bolts that hold the oil pump to the engine. 3. Put clean engine oil on all O-ring seals, and install pipe (2) and tube assembly (3) in the oil pump as a unit. Install two bolts that fasten the pipe assembly to the engine block.End By:a. install oil panDisassemble Oil Pump
Start By:a. remove oil pump1. Remove the bolt and washer that hold the gear on the shaft. 2. Use Tooling (A) to remove drive gear (1) from the shaft. Remove the key from shaft. 3. Remove retainer (3) for the bypass valve.4. Remove the spring and bypass valve.5. Remove cover (2) from the pump body. 6. Use Tooling (B) to remove the bearings from the cover. 7. Remove gears (5) from pump body (4).8. Use Tooling (B) to remove the bearings from the pump body.Assemble Oil Pump
1. Use Tooling (A) to install the bearings in the main pump body until they are even with the outside surface of the pump body. Install the bearings so the junctions in the bearings are 30 15 degrees from the center of the bearing bores and toward the oil pump outlet passage (2) as shown. 2. Install idler gear (1) and drive gear (3) in the oil pump body. Put clean engine oil on the bearings and gears. 3. Use Tooling (A) to install the bearings in cover (4) until they are even with the outside surface of the cover. Install the bearings so the junctions in the bearings are 30 15 degrees from the center of the bearing bores and toward the oil pump outlet passage as shown. 4. Install bypass valve (5), spring (6), spacer and the retainer in the pump body.5. Install the key on the shaft. 6. Install gear (7) on the shaft. Install the washer and bolt that holds the gear on the shaft. Tighten the bolt to a torque of 55 7 N m (41 5 lb ft).7. Make sure the pump turns freely by hand after it is assembled.End By:a. install oil pump