101492-0713 ZEXEL F 019 Z10 963 BOSCH INJECTION-PUMP ASSEMBLY f019z10963 1014920713 8971045092


 

Information injection-pump assembly

BOSCH F 019 Z10 963 f019z10963
ZEXEL 101492-0713 1014920713
ISUZU 8971045092 8971045092
101492-0713 INJECTION-PUMP ASSEMBLY
Rating:
50
Buy INJECTION-PUMP ASSEMBLY 101492-0713 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-0713 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-9941
3. GOVERNOR 105400-8303
4. SUPPLY PUMP 105220-7280
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-0620
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4600
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 18.1(185)
13. NOZZLE-HOLDER 105048-3230
14. NOZZLE 105017-0490
15. NOZZLE SET

Include in #1:

101492-0713 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101492-0713 
F 019 Z10 963 
8971045092  ISUZU
INJECTION-PUMP ASSEMBLY
4JB1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE




Information:

Start By:a. remove oil pumpb. remove oil pan plate 1. Turn the crankshaft until two pistons are at the bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the rod bearing from the rod bearing cap.2. Push the connecting rods away from the crankshaft. Remove the upper half of the rod bearing from the connecting rod. Install the connecting rod bearings dry when the clearance checks are made. Put clean engine oil on the connecting rod bearings for final assembly.3. Install the upper half of the rod bearing in the connecting rod.4. Install the lower half of the rod bearing in the connecting rod cap. Be sure the tabs in the back of the connecting rod bearings are in the tab grooves of the connecting rod and cap. 5. Use Plastigage (A) to check the connecting rod bearing clearance.6. Put Plastigage (A) on the connecting rod bearing.7. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
When connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
Do not turn the crankshaft when Plastigage (A) is in position.
Do not use an impact wrench to tighten the nuts the additional 90°.
8. Install connecting rod cap (1). Install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb ft). Put a mark on each nut and the end of each bolt. Tighten the nuts 90° more. Remove the connecting rod caps. Remove Plastigage (A) and measure the width of the Plastigage. The connecting rod clearance must be 0.076 to 0.168 mm (.0030 to .0066 in) for new bearings. The maximum clearance with used bearings is 0.25 mm (.010 in).9. Install the connecting rod caps and tighten the nuts as in Step 8.10. Do Steps 1 through 9 for the remainder of the connecting rod bearings.End By:a. install oil pan plateb. install oil pump

Have questions with 101492-0713?





Group cross 101492-0713 ZEXEL

Isuzu 

9 400 614 409 
8971002650 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 536 
8971002651 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 410 
8971002652 
INJECTION-PUMP ASSEMBLY
4JB1
 
8971045090 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 411 
8971045091 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 939 
 
INJECTION-PUMP ASSEMBLY
4JB1

Isuzu 

101492-0713  
F 019 Z10 963 
8971045092 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 383 
8971089220 
INJECTION-PUMP ASSEMBLY
4JB1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971348740 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 537 
8971348741 
INJECTION-PUMP ASSEMBLY
4JB1
F 019 Z10 104 
8971379810 
INJECTION-PUMP ASSEMBLY
4JB1
 
8971392240 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 538 
8971392241 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 539 
8971417740 
INJECTION-PUMP ASSEMBLY
4JA1
 
8971348730 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 540 
8971348731 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 985 
8971348732 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 541 
8971385900 
INJECTION-PUMP ASSEMBLY
4BC2
 
8971385920 
INJECTION-PUMP ASSEMBLY
4BC2
Back to top