101492-0710 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014920710 8971045090


 

Information injection-pump assembly

ZEXEL 101492-0710 1014920710
ISUZU 8971045090 8971045090
101492-0710 INJECTION-PUMP ASSEMBLY
Rating:
47
Buy INJECTION-PUMP ASSEMBLY 101492-0710 zexel genuine, new aftermarket engine parts with delivery

Service parts 101492-0710 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-9940
3. GOVERNOR 105400-8300
4. SUPPLY PUMP 105220-5850
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-0620
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4602
11. Nozzle and Holder 8-94442-224-1
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3230
14. NOZZLE 105017-0490
15. NOZZLE SET

Include in #1:

101492-0710 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101492-0710 1014920710
ISUZU 8971045090 8971045090


Zexel num
Bosch num
Firm num
Name
101492-0710 
101492-0711 
 
8971045090  ISUZU
INJECTION-PUMP ASSEMBLY
4JB1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-0820
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   3.3 3.25 3.35
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.3
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   52.5 51.5 53.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   9.2+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   11.5 9.5 13.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101492-0710
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Set idle sub-spring (4)Main spring setting
----------
K=12
----------

Speed control lever angle

Test data 101492-0710
F:Full speed I:Idle S:Stop
----------

----------
a=9deg+-5deg b=20deg+-5deg c=35deg+-3deg

Stop lever angle

Test data 101492-0710
N:Pump normal S:Stop the pump.
----------

----------
a=0deg+-5deg b=53deg+-5deg

Timing setting

Test data 101492-0710
(1)Pump vertical direction (2)Position of gear mark 'V' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=17deg
----------
a=(200deg)




Information:

2. Turn the crankshaft until two of the pistons are at bottom center. Remove the nuts and bolts (1) from the connecting rods that are at bottom center. Remove connecting rod caps (2). Put identification marks on them for installation purposes.
Do not let the connecting rods hit the crankshaft or the bottom edge of the cylinder liners when the pistons are removed.
3. Push the connecting rods and pistons away from the crankshaft until the piston rings are out of the cylinder liners. Remove the two pistons from the engine.4. Keep each connecting rod cap with its respective connecting rod and piston. Put identification marks on each piston as to its location in the engine.5. Do Steps 1 through 4 for the removal of the remaining pistons.Install Pistons & Connecting Rods
1. Turn the crankshaft until the bearing journals for the pistons to be installed are at bottom center.2. Put clean engine oil on the crankshaft journals and on the inside of the cylinder liners. Put clean engine oil on the piston rings and the connecting rod bearings.3. Move the piston rings on the pistons until the ring openings are approximately 90° apart. 4. Put the piston in the cylinder liner with the "V" mark on the piston in alignment with the "V" mark on the cylinder block. Put Tool (A) in position on the cylinder block and compress the piston rings.5. Push the piston into the cylinder liner and out of the ring compressor. 6. Pull the connecting rod into position on the crankshaft as shown. Install connecting rod bolts (1) in the connecting rods.7. Put clean engine oil on the lower half of the connecting rod bearing. Put 2P2506 Thread Lubricant on the bolt threads and on the surfaces of the nuts that make contact with the connecting rod caps.
When the connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
8. Install connecting rod caps (2) and the nuts that hold them. Tighten the nuts to a torque of 40 4 N m (30 3 lb ft). Put a mark on each nut as to its location. Tighten them 90° 5° more.9. Do Steps 1 through 8 for the remainder of the pistons.End By:a. install oil pumpb. install oil pan platec. install cylinder head assembly and spacer plateDisassemble Pistons & Connecting Rods
Start By:a. remove pistons and connecting rods 1. Remove the rings from the pistons with Tool (A). 2. Remove retaining ring (3), piston pin (1) and connecting rod (2) from the piston.3. Remove the bearings from the crankshaft end of the connecting rod.4. See Use Of Piston Pin Bearing Removal And Installation Tools, Special Instructions, Form No. SMHS7295-02 for more information about removal and installation of piston pin bearings. Be sure to remove the bearings from the crankshaft end of connecting rod.5. Heat the connecting rod in an oven to a temperature of 176

Have questions with 101492-0710?





Group cross 101492-0710 ZEXEL

Isuzu 

9 400 614 409 
8971002650 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 536 
8971002651 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 410 
8971002652 
INJECTION-PUMP ASSEMBLY
4JB1
101492-0710  

101492-0711 
 
8971045090 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 614 411 
8971045091 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 939 
 
INJECTION-PUMP ASSEMBLY
4JB1

Isuzu 

F 019 Z10 963 
8971045092 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 383 
8971089220 
INJECTION-PUMP ASSEMBLY
4JB1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971348740 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 537 
8971348741 
INJECTION-PUMP ASSEMBLY
4JB1
F 019 Z10 104 
8971379810 
INJECTION-PUMP ASSEMBLY
4JB1
 
8971392240 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 538 
8971392241 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 539 
8971417740 
INJECTION-PUMP ASSEMBLY
4JA1
 
8971348730 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 540 
8971348731 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 611 985 
8971348732 
INJECTION-PUMP ASSEMBLY
4JB1
9 400 610 541 
8971385900 
INJECTION-PUMP ASSEMBLY
4BC2
 
8971385920 
INJECTION-PUMP ASSEMBLY
4BC2
Back to top