Information injection-pump assembly
BOSCH
9 400 614 408
9400614408
ZEXEL
101492-0691
1014920691
ISUZU
8970894271
8970894271
Rating:
Service parts 101492-0691 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
8-94442-224-1
12.
Open Pre:MPa(Kqf/cm2)
18.1{185}
15.
NOZZLE SET
Cross reference number
Zexel num
Bosch num
Firm num
Name
101492-0691
9 400 614 408
8970894271 ISUZU
INJECTION-PUMP ASSEMBLY
4JB1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE
4JB1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE
Information:
2. Remove pipe (1) and the gasket between aftercooler cover (2) and the turbocharger. If necessary, remove the O-ring seals from the pipe.3. Remove the bolts and clamps that hold tube assemblies (3) to each end of the aftercooler. Remove tube assemblies (3) from each end of the aftercooler. If necessary, remove the O-ring seals from the tube assemblies. An O-ring seal on each end of the aftercooler core holds the adapters in position.4. Remove adapters (4) and the gaskets from each end of the aftercooler.5. Remove all bolts (5) that hold aftercooler cover (2) in position. Remove the aftercooler cover and gasket from the engine. 6. Remove aftercooler core (6) and the gasket from the engine. If necessary, remove the O-ring seals from the aftercooler core. Two of the bolts that hold the aftercooler housing in position are on the inside of the aftercooler housing.7. Remove the bolts and spacers that hold aftercooler housing (7) to the engine. Make a note of the location of the spacers. Remove the aftercooler housing and gaskets from the engine.Install Aftercooler
Inspect all O-ring seals and gaskets, and make replacements if necessary. 1. Put the gaskets and aftercooler housing (1) in position on the engine. Install the bolts and spacers that hold the aftercooler housing.2. Install the O-ring seals on the aftercooler core, and put a thin layer of clean engine oil on them. Put the gasket and aftercooler core (2) in position on the engine. 3. Put the gasket and aftercooler cover (3) in position. Install the bolts that hold the aftercooler cover. Force may be required to push the adapters around the O-ring seals on the aftercooler core. Make sure the O-ring seals stay in position on the aftercooler core.4. Put a thin layer of clean engine oil in the bores of adapters (4). Install a gasket and adapter on each end of the aftercooler core. 5. Install the O-ring seals on tube assemblies (5), and put a thin layer of clean engine oil on them. Put the tube assemblies in position on each end of the aftercooler, and install the bolts and clamps that hold them.6. Install the O-ring seals on pipe (6), and put a thin layer of clean engine oil on them. Put the pipe and gasket in position between the aftercooler and the turbocharger. Install the bolts that hold it.7. Fill the radiator with coolant to the correct level. See the Operation & Maintenance Manual.
Inspect all O-ring seals and gaskets, and make replacements if necessary. 1. Put the gaskets and aftercooler housing (1) in position on the engine. Install the bolts and spacers that hold the aftercooler housing.2. Install the O-ring seals on the aftercooler core, and put a thin layer of clean engine oil on them. Put the gasket and aftercooler core (2) in position on the engine. 3. Put the gasket and aftercooler cover (3) in position. Install the bolts that hold the aftercooler cover. Force may be required to push the adapters around the O-ring seals on the aftercooler core. Make sure the O-ring seals stay in position on the aftercooler core.4. Put a thin layer of clean engine oil in the bores of adapters (4). Install a gasket and adapter on each end of the aftercooler core. 5. Install the O-ring seals on tube assemblies (5), and put a thin layer of clean engine oil on them. Put the tube assemblies in position on each end of the aftercooler, and install the bolts and clamps that hold them.6. Install the O-ring seals on pipe (6), and put a thin layer of clean engine oil on them. Put the pipe and gasket in position between the aftercooler and the turbocharger. Install the bolts that hold it.7. Fill the radiator with coolant to the correct level. See the Operation & Maintenance Manual.
Have questions with 101492-0691?
Group cross 101492-0691 ZEXEL
Isuzu
Isuzu
101492-0691
9 400 614 408
8970894271
INJECTION-PUMP ASSEMBLY
4JB1
4JB1