101491-9351 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014919351 sl7113800


 

Information injection-pump assembly

ZEXEL 101491-9351 1014919351
MAZDA SL7113800 sl7113800
101491-9351 INJECTION-PUMP ASSEMBLY
Rating:
42
Buy INJECTION-PUMP ASSEMBLY 101491-9351 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101491-9351 1014919351
MAZDA SL7113800 sl7113800


Zexel num
Bosch num
Firm num
Name
101491-9351 
101491-9357 
 
SL7113800  MAZDA
INJECTION-PUMP ASSEMBLY
P627SL *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-3420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.1
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   55.3 54.8 55.8
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   325 325 325
Average injection quantity mm3/st.   9 7 11
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.1)
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   55.3 54.8 55.8
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   91 81 96
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1350+-25
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1600
Advance angle deg.   2.6 2.3 2.9
Timer adjustment_03
Pump speed r/min   -
Advance angle deg.   2.8 2.8 2.8
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 101491-9351
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=C34
----------

Speed control lever angle

Test data 101491-9351
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=20deg+-5deg b=(38deg)+-3deg

Stop lever angle

Test data 101491-9351
N:Pump normal S:Stop the pump. (1)Normal (2)Stop (3)Stopper bolt setting (4)Set the speed to aa using the idle lever and then confirm non-injection.
----------
aa=325r/min
----------
a=(15deg)+-5deg b=(13.5deg) c=23deg+-5deg d=40deg+-5deg

0000001501 LEVER

Test data 101491-9351
f1:Direction for pulling the speed lever f2:Direction for pulling the stop lever Stop lever's normal position setting method 1. (1) Push in the set bolt (A) until the rack starts to move. (2)Return the bolt N1 turns from that position and set. 2. Rack with limiter (1)Return the bolt N1 turns from the rack limit position and set.
----------
N1=1.5
----------

Timing setting

Test data 101491-9351
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(130deg)




Information:


Spray starting fluid only while cranking the engine.
1. Heat the glow plugs (If equipped) for the approximate heating time shown in the STARTING AID CHART. 2. Turn the HEAT-START switch to START position. While cranking, spray starting fluid into the air inlet or air cleaner for approximately 1 second.
Wait at least 2 seconds before spraying starting fluid again.
3. If necessary, repeat the procedure.4. After the engine starts, it may be necessary to return the HEAT-START switch to the HEAT position until the engine runs smoothly.Jacket Water Heater (Attachment)
In very low temperatures, the lubricating oil must be warmed to allow starting. A jacket water heater can maintain the water temperature at approximately 90°F (32°C). The warm water will keep the oil in the upper part of the engine block warm enough to flow when starting.Dipstick Oil Heater
Contact your Caterpillar dealer before installing a dipstick crankcase oil heater.
Generator
Starting Single Unit Operation
1. Make all preliminary engine starting checks.2. Be sure the main or line circuit breaker is open.3. Start the engine and allow it to warm up.4. Close the main circuit breaker.5. Apply the load. Do not try to apply full load in one move, rather apply the load in increments to maintain system frequency at a constant level.Standby Generator Sets
Most standby units are automatic. They start, pickup the load, run and stop without an operator in attendance. Standby units can not change the governor control setting automatically. The throttle must be preset for the proper operation of that unit. Whenever the set is exercised or operated manually, be sure the throttle setting is correct for automatic operation. Check all switches to see they are properly set: Start Selector Switch in AUTOMATIC position and any Emergency Stop Switches in RUN position.Paralleling
Units may be paralleled at no load or paralleled with units under load. To parallel two or more units the following conditions must be met:1. Same phase rotation.2. Same voltage level.3. Same voltage droop.4. Same frequency.5. Voltages must be in phase.The first condition is established by "phased" wiring connections of initial installation.The second and third conditions are usually established by semi-permanent adjustments to the generator controls.The fourth and fifth conditions are under control of the operation in manual paralleling systems (or under automatic control in automatic paralleling systems).To Parallel
1. Start the unit to be paralleled.2. Turn the synchronizer lights on.3. After the engine has run long enough to warm up, bring it up to synchronous speed (the same frequency as the unit on the line). The synchronizing lights will begin to blink.4. Using the governor control, adjust the speed until the lights blink very slowly.5. The lights are off when the voltages of the two units are in phase. At this point, very quickly close the breaker while the lights are out. The frequency of the incoming unit should be slightly greater than the line frequency. This will allow the incoming unit to assume some of the load rather than add to the system load.Load Division
Once two units have been paralleled,

Have questions with 101491-9351?





Group cross 101491-9351 ZEXEL

Mazda 

101491-9351  

101491-9357 
 
SL7113800 
INJECTION-PUMP ASSEMBLY
P627SL
 
 
INJECTION-PUMP ASSEMBLY
P627
 
 
INJECTION-PUMP ASSEMBLY

Mazda 

 
SL7313800B 
INJECTION-PUMP ASSEMBLY
P627SL
 
SL7313800C 
INJECTION-PUMP ASSEMBLY
P627SL
 
 
INJECTION-PUMP ASSEMBLY

Mazda 

9 400 614 339 
SL7313800E 
INJECTION-PUMP ASSEMBLY
P627SL
Back to top