101491-9281 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1014919281


 

Information injection-pump assembly

ZEXEL 101491-9281 1014919281
101491-9281 INJECTION-PUMP ASSEMBLY
Rating:
17
Buy INJECTION-PUMP ASSEMBLY 101491-9281 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101491-9281 
101491-9286 
 
  MAZDA
INJECTION-PUMP ASSEMBLY
P630K *




Information:

Start By:a. remove exhaust manifoldb. remove inlet manifoldc. remove fuel injection nozzle assembliesd. remove fuel filtere. remove water temperature regulatorf. remove cylinder head assembly 1. Put cylinder head assembly (1) in position on tool group (A). 2. Put compression on valve spring (2) with tool (C). 3. Remove spring locks (3). 4. Remove tool (C). Remove valve spring cap (2) and valve springs (4). 5. Remove washer (5) and O-ring seal (8) from valve (7).6. Remove seal (6). Remove valve (7). 7. Check the valve spring tension with tool (B). The outer spring force must be 180 9 N (40 2 lb.). The length of the spring under test force must be 27.4 mm (1.08 in.). The free length after test must be 45.2 mm (1.78 in.). The inner spring force must be 68.5 9 N (15.4 2 lb.). The length of the spring under test force must be 23.88 mm (.940 in.). The length after test must be 39.6 mm (1.56 in.).8. Do Steps 1 through 8 again for the remainder of the valves. If the cylinder head is equipped with removable valve guides, refer to module SENB8082-06, System Operating Testing And Adjusting Specifications, 4.236 And 4.2482 Diesel Engines For Lift Trucks.Install Valves
1. Put clean engine oil on the valve stems.2. Install valve (3), washer (2) and seal (1).
The closed coil of the spring must be toward the cylinder head.
3. Install springs (5) and valve spring cap (4). 4. Use tool (A), and put springs under compression, and install O-ring seal on the valve. Exhaust valves have an extra O-ring seal on them.
Locks (6) can be thrown from the valve when tool (A) is released if they are not in their correct position on the valve stem.
5. Use tool (B), and install locks (6) that hold the springs in place.6. Remove tool (A), and hit the top of the valve with a plastic hammer to be sure the locks are in their correct position on the valve.7. Do Steps 1 through 6 again for the remainder of the valves.End By:a. install cylinder head assemblyb. install water temperature regulatorc. install fuel filterd. install fuel injection nozzle assembliese. install inlet manifold

Have questions with 101491-9281?





Group cross 101491-9281 ZEXEL

Mazda 

 
 
INJECTION-PUMP ASSEMBLY
P630K
101491-9281  

101491-9286 
 
 
INJECTION-PUMP ASSEMBLY
P630K
 
Z02SL5113800 
INJECTION-PUMP ASSEMBLY
P630K
 
 
INJECTION-PUMP ASSEMBLY
P630K
 
 
INJECTION-PUMP ASSEMBLY
P630K
 
 
INJECTION-PUMP ASSEMBLY

Mazda 

9 400 614 335 
SL5113800B 
INJECTION-PUMP ASSEMBLY
P630K
Back to top