101491-1080 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014911080 me017716


 

Information injection-pump assembly

ZEXEL 101491-1080 1014911080
MITSUBISHI ME017716 me017716
101491-1080 INJECTION-PUMP ASSEMBLY
Rating:
52
Buy INJECTION-PUMP ASSEMBLY 101491-1080 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101491-1080 1014911080
MITSUBISHI ME017716 me017716


Zexel num
Bosch num
Firm num
Name
101491-1080 
 
ME017716  MITSUBISHI
INJECTION-PUMP ASSEMBLY
4D31T * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.5 3.45 3.55
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.2
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   59.5 58.5 60.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.7+-0.5
Pump speed r/min   325 325 325
Average injection quantity mm3/st.   10 8.7 11.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.2)
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   59.5 58.5 60.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   I
Rack position   14.8+-0. 5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   66 66 71
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1270--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1200
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1500
Advance angle deg.   1.5 1.2 1.8
Timer adjustment_04
Pump speed r/min   -
Advance angle deg.   3 3 3
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 101491-1080
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT
----------
T1=K14
----------

Speed control lever angle

Test data 101491-1080
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=26deg+-5deg b=35deg+-3deg

Stop lever angle

Test data 101491-1080
N:Pump normal S:Stop the pump.
----------

----------
a=33deg+-5deg b=40deg+-5deg

Timing setting

Test data 101491-1080
(1)Pump vertical direction (2)Position of gear mark '3' at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(130deg)




Information:

2. Turn the crankshaft until two of the pistons are at bottom center. Remove the nuts and bolts (1) from the connecting rods that are at bottom center. Remove connecting rod caps (2). Put identification marks on them for installation purposes.
Do not let the connecting rods hit the crankshaft or the bottom edge of the cylinder liners when the pistons are removed.
3. Push the connecting rods and pistons away from the crankshaft until the piston rings are out of the cylinder liners. Remove the two pistons from the engine.4. Keep each connecting rod cap with its respective connecting rod and piston. Put identification marks on each piston as to its location in the engine.5. Do Steps 1 through 4 for the removal of the remaining pistons.Install Pistons & Connecting Rods
1. Turn the crankshaft until the bearing journals for the pistons to be installed are at bottom center.2. Put clean engine oil on the crankshaft journals and on the inside of the cylinder liners. Put clean engine oil on the piston rings and the connecting rod bearings.3. Move the piston rings on the pistons until the ring openings are approximately 90° apart. 4. Put the piston in the cylinder liner with the "V" mark on the piston in alignment with the "V" mark on the cylinder block. Put Tool (A) in position on the cylinder block and compress the piston rings.5. Push the piston into the cylinder liner and out of the ring compressor. 6. Pull the connecting rod into position on the crankshaft as shown. Install connecting rod bolts (1) in the connecting rods.7. Put clean engine oil on the lower half of the connecting rod bearing. Put 2P2506 Thread Lubricant on the bolt threads and on the surfaces of the nuts that make contact with the connecting rod caps.
When the connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
8. Install connecting rod caps (2) and the nuts that hold them. Tighten the nuts to a torque of 40 4 N m (30 3 lb ft). Put a mark on each nut as to its location. Tighten them 90° 5° more.9. Do Steps 1 through 8 for the remainder of the pistons.End By:a. install oil pumpb. install oil pan platec. install cylinder head assembly and spacer plateDisassemble Pistons & Connecting Rods
Start By:a. remove pistons and connecting rods 1. Remove the rings from the pistons with Tool (A). 2. Remove retaining ring (3), piston pin (1) and connecting rod (2) from the piston.3. Remove the bearings from the crankshaft end of the connecting rod.4. See Use Of Piston Pin Bearing Removal And Installation Tools, Special Instructions, Form No. SMHS7295-02 for more information about removal and installation of piston pin bearings. Be sure to remove the bearings from the crankshaft end of connecting rod.5. Heat the connecting rod in an oven to a temperature of 176

Have questions with 101491-1080?





Group cross 101491-1080 ZEXEL

Mitsubishi 

 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME016095 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME019331 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME019336 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME016096 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME016097 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME016098 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME016195 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME016099 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
 
INJECTION-PUMP ASSEMBLY
4D31T
 
ME016196 
INJECTION-PUMP ASSEMBLY
4D31T
101491-1080  
 
ME017716 
INJECTION-PUMP ASSEMBLY
4D31T
9 400 614 308 
ME017760 
INJECTION-PUMP ASSEMBLY
4D31T
Back to top