Information injection-pump assembly
BOSCH
9 400 614 274
9400614274
ZEXEL
101491-0214
1014910214

Rating:
Service parts 101491-0214 INJECTION-PUMP ASSEMBLY:
1.
_
3.
GOVERNOR
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
8-94151-865-1
12.
Open Pre:MPa(Kqf/cm2)
18.1{185}
15.
NOZZLE SET
Cross reference number
BOSCH
9 400 614 274
9400614274
ZEXEL
101491-0214
1014910214
Zexel num
Bosch num
Firm num
Name
101491-0214
9 400 614 274
ISUZU
INJECTION-PUMP ASSEMBLY
4BC2 * K
4BC2 * K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
3.4
3.35
3.45
Rack position
Point A R=A
Point A R=A
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
-
Rack position
10.5
Pump speed
r/min
1100
1100
1100
Average injection quantity
mm3/st.
59.2
57.6
60.8
Max. variation between cylinders
%
0
-3.5
3.5
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
H
Rack position
9.8+-0.5
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
9.5
8
11
Max. variation between cylinders
%
0
-10
10
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(10.5)
Pump speed
r/min
1100
1100
1100
Average injection quantity
mm3/st.
59.2
58.2
60.2
Basic
*
Fixing the lever
*
Injection quantity adjustment_04
Adjusting point
C
Rack position
R1-0.1
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
43.5
40.3
46.7
Fixing the lever
*
Injection quantity adjustment_05
Adjusting point
D
Rack position
R1+0.5
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
46.1
42.1
50.1
Fixing the lever
*
Timer adjustment
Pump speed
r/min
1650--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1600
Advance angle
deg.
0.6
Timer adjustment_03
Pump speed
r/min
1800
Advance angle
deg.
3
2.5
3.5
Timer adjustment_04
Pump speed
r/min
1900
Advance angle
deg.
4.5
4
5
Timer adjustment_05
Pump speed
r/min
-
Advance angle
deg.
5
5
5
Remarks
Measure the actual speed, stop
Measure the actual speed, stop
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
----------
T1=B14
----------
----------
T1=B14
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt set position 'H'
(2)Speed = aa, rack position = bb (lever angle with microswitch ON)
----------
aa=1285+-50r/min bb=9.2mm
----------
a=5.5deg+-5deg b=(41deg)+-3deg c=(20deg)+-3deg
----------
aa=1285+-50r/min bb=9.2mm
----------
a=5.5deg+-5deg b=(41deg)+-3deg c=(20deg)+-3deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=15deg
----------
a=(100deg)
----------
aa=15deg
----------
a=(100deg)
Information:
Removal of Cooling System
Disassembly, Inspection and Reassembly Of Cooling System
Water Pump
Inspection of Water Pump
Inspection of impeller and shaft rotation conditionIf the inspection of the impeller and shaft finds abnormal noise or rough rotation, replace the assembly.Thermostat
Disassembly of Thermostat
Inspection of Thermostat
Inspection of thermostatTo test the thermostat operation, immerse the thermostat in a container filled with water, and heat the water while measuring the water temperature. Record the temperature at which the valve starts to open and the temperature at which the valve lift becomes 8 mm [0.3 in.] or more. (a) Stir the water in the container to ensure uniform temperature distribution.(b) When installing the thermostat, be sure to check the valve opening temperature indication stamped on the upper face of the thermostat mounting flange.Overheating Warming Unit (Thermo Switch)
Inspection of Overheating Warming Unit
Overheating warming unit Immerse the temperature sensor in oil, and measure the resistance while increasing the oil temperature. If the temperature measurement exceeds the standard value significantly, replace the thermo switch.
Since the inspection requires heating of oil to high temperatures, be careful not to get burns or start a fire.
Installation of Cooling System
Installation of Cooling System
Disassembly, Inspection and Reassembly Of Cooling System
Water Pump
Inspection of Water Pump
Inspection of impeller and shaft rotation conditionIf the inspection of the impeller and shaft finds abnormal noise or rough rotation, replace the assembly.Thermostat
Disassembly of Thermostat
Inspection of Thermostat
Inspection of thermostatTo test the thermostat operation, immerse the thermostat in a container filled with water, and heat the water while measuring the water temperature. Record the temperature at which the valve starts to open and the temperature at which the valve lift becomes 8 mm [0.3 in.] or more. (a) Stir the water in the container to ensure uniform temperature distribution.(b) When installing the thermostat, be sure to check the valve opening temperature indication stamped on the upper face of the thermostat mounting flange.Overheating Warming Unit (Thermo Switch)
Inspection of Overheating Warming Unit
Overheating warming unit Immerse the temperature sensor in oil, and measure the resistance while increasing the oil temperature. If the temperature measurement exceeds the standard value significantly, replace the thermo switch.
Since the inspection requires heating of oil to high temperatures, be careful not to get burns or start a fire.
Installation of Cooling System
Installation of Cooling System
Have questions with 101491-0214?
Group cross 101491-0214 ZEXEL
Isuzu
101491-0214
9 400 614 274
INJECTION-PUMP ASSEMBLY
4BC2
4BC2