101491-0012 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1014910012 5156012075


 

Information injection-pump assembly

ZEXEL 101491-0012 1014910012
ISUZU 5156012075 5156012075
101491-0012 INJECTION-PUMP ASSEMBLY
Rating:
17
Buy INJECTION-PUMP ASSEMBLY 101491-0012 zexel genuine, new aftermarket engine parts with delivery

Service parts 101491-0012 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101049-8150
3. GOVERNOR 105931-0661
4. SUPPLY PUMP 105220-5050
5. AUTOM. ADVANCE MECHANIS 105622-0861
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6391
11. Nozzle and Holder 8-94151-865-1
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-3201
14. NOZZLE 105015-6060
15. NOZZLE SET

Include in #1:

101491-0012 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101491-0012 
 
5156012075  ISUZU
INJECTION-PUMP ASSEMBLY
4BC2 * K




Information:

GENERAL
Specifications
Components parts
Fuel System Component Parts(1) Injection pump(2) Adjustment shim(3) Injection pipe(4) Injection nozzle(5) Return pipe(6) Fuel filter(7) Fuel cutoff solenoidFUEL INJECTION PUMP
Construction
Injection Pump Component Parts(1) Union collar(2) Air vent screw(3) Delivery valve holder(4) Valve spring(5) Holder stopper(6) Housing(7) O-ring(8) Delivery valve(9) Gasket(10) Seat valve(11) Plunger barrel(12) Sleeve(13) Upper seat(14) Plunger spring(15) Plunger(16) Lower seat(17) Adjusting shim(18) Tappet roller(19) Pin(20) Control rack(21) Stop wire bracketInspecting the injection pump while it is mounted on the engine
Never attempt to disassemble the pump unless it is necessary.If the pump is assumed defective, it is recommended to replace the pump assembly. Removal
(1) Disconnect the fuel injection pipes.(2) Remove the tie-rod clip cover.(3) Remove the tie-rod clip and tie-rod.(4) Remove the injection pump assembly.
Removing Injection PumpDisassembly
(1) Remove the stopper plate.(2) Unscrew the delivery holder. Take out the delivery valve and valve spring.(3) Remove the tappet roller and stopper pin.(4) Remove the tappet, plunger spring, etc. CAUTION1. When replacing the plunger barrel, delivery valve, etc., do not loosen the adjusting screw and plate for each cylinder.2. When those parts have been replaced, it is necessary to measure fuel injection quantity by using the pump tester and cam box.3. All parts removed from the pump should be kept classified by cylinders and immersed in clean fuel.Inspection
Inspection of Injection PumpAssembly
(1) Insert the plunger barrel into the housing.(2) Install the delivery valve and valve spring. Temporarily tighten the holder.(3) Insert the control rack.(4) Insert the control pinion. Align the matchmark on the rack with that on the pinion.(5) Install the spring upper seat.(6) Insert the plunger spring.(7) Fit the lower seat to the plunger. Insert the plunger into the barrel side.(8) Depress the tappet roller assembly and install the stopper pin.(9) Tighten the delivery holder. Tightening torque : 3.5 - 3.9 kgm
Direction of Installation of PlungerInstallation
Install the injection pump assembly in the reverse order of removal. CAUTION* When installing the plunger barrel, engage the dowel pin on the housing side with the groove in the barrel.* Position the plunger so that the part-number stamp on its flanges faces the direction opposite to the rack side. (Engage the feed hole with the plunger lead.)* After installation, check for proper injection timing.INJECTION NOZZLE
Construction
Nozzle Holder Ass'y Component Parts(1) Body sub-assembly(2) Shim washer(3) Pressure spring(4) Pin(5) Distance piece(6) Nozzle assembly(7) Retaining nutRemoval
(1) Disconnect the injection pipe and fuel return pipe.(2) Remove the injection nozzle assembly from the cylinder head. CAUTION* Attach an identification-number tag to the removed injection nozzle.* Plug the openings, from which the pipes are disconnected and the nozzle is removed, to prevent intrusion of dust, water, and other foreign particles into the pipes and combustion chamber.Disassembly
If the removed nozzle assembly is assumed defective, disassemble the assembly and repair or replace the faulty parts.(1) Grip the nozzle holder body in a vise. Loosen the retaining nut. Never vise the retaining nut to prevent deformation.(2) Take out the shim washer, pressure spring, distance piece, and nozzle assembly. CAUTION* Scrape off carbon deposit with a wooden spatula. Keep the removed parts immersed

Have questions with 101491-0012?





Group cross 101491-0012 ZEXEL

Isuzu 

 
5156012032 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012035 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012036 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012071 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012074 
INJECTION-PUMP ASSEMBLY
4BC2
101491-0012  
 
5156012075 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012091 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012094 
INJECTION-PUMP ASSEMBLY
4BC2
F 019 Z20 392 
5156012095 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012101 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156012104 
INJECTION-PUMP ASSEMBLY
4BC2
9 400 610 014 
5156012105 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156011961 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156011964 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156011965 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013320 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013220 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013370 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013670 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013671 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013672 
INJECTION-PUMP ASSEMBLY
4BC2
9 400 614 268 
5156013674 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013690 
INJECTION-PUMP ASSEMBLY
4BC2
 
5156013691 
INJECTION-PUMP ASSEMBLY
4BC2
Back to top