101482-9283 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014829283


 

Information injection-pump assembly

ZEXEL 101482-9283 1014829283
101482-9283 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 101482-9283 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101482-9283 1014829283


Zexel num
Bosch num
Firm num
Name
101482-9283 
 
   
INJECTION-PUMP ASSEMBLY
14BC PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 157 157
Overflow valve opening pressure kgf/cm2   1.6 1.6 1.6
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   2.8 2.75 2.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.3
Pump speed r/min   1225 1225 1225
Average injection quantity mm3/st.   42.9 41.9 43.9
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7.1+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   10 9 11
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   9++
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   65 60 70
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101482-9283
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting (6)Rack difference between N = N1 and N = N2
----------
K=10 N1=1225r/min N2=900r/min
----------

Speed control lever angle

Test data 101482-9283
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=21deg+-5deg b=4deg+-5deg

Stop lever angle

Test data 101482-9283
N:Pump normal S:Stop the pump. (1)Normal
----------

----------
a=7deg+-5deg b=53deg+-5deg

Timing setting

Test data 101482-9283
(1)Pump vertical direction (2)Position of camshaft's key groove at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(50deg)




Information:

Flywheel
Installation of Flywheel Housing
Installation of flywheel housing(1) Install the oil seal to the flywheel housing.(2) Coat the contact surfaces of the crankcase and flywheel with ThreeBond 1104.(3) Align the holes in the flywheel housing and gasket with the dowel pins on the crankcase, and install them to the crankcase.Installation of Flywheel
(1) Install the flywheel to the crankshaft by aligning the hole with the dowel pin on the back-end of the crankshaft.(2) Place the washer and tighten the four bolts to the specified torque.
Installation of flywheelMeasurement of Flywheel Runout
Measure the flywheel runout with the flywheel installed to the crankshaft. If the standard value is exceeded, check the bolts for tightening condition and the mounting face for adhesion of foreign particles.
Measurement of face runout and circular runoutCylinder Head and Valve Mechanisms
Installation of Valve Stem Seal
(1) Apply engine oil to the valve stem, and insert it into the valve guide.(2) Place a new stem seal on the valve guide.(3) Using the stem seal installer, install the stem seal to the valve guide, making use of the valve stem as a guide.
Installation of valve stem sealInstallation of Valves and Valve Springs
(1) Place the valve spring and retainer on the valve guide, and install the valve cotter using the valve spring pusher.
Excessive compression of the valve spring can cause the retainer to contact the stem seal and damage the seal.
Installation of valve and valve spring(2) Using a soft-faced hammer, tap the top of the valve stem several times to make sure that the spring and valve cotter are securely installed.
Confirmation of secure valve cotter installationInstallation of Cylinder Head Gasket
(1) Make sure that the top face of the crankcase and piston upper surfaces are clean and free of dust.(2) Place a new gasket of the crankcase, making sure that the dowel pins on the top face of the crankcase enter the holes in the gasket.
Do not use a liquid gasket.
Installation of cylinder head gasketInstallation of Cylinder Head
Place the cylinder head on the head gasket, making sure that the dowel pins on the top face of the crankcase enters the holes in the cylinder head.
Installation of cylinder head assemblyTightening of Cylinder Head Bolts
Tighten the cylinder head bolts, following the tightening sequence shown in the diagram two or three times before reaching the specified torque.
Cylinder head bolt tightening sequenceAssembly of Rocker Arm and Rocker Shaft Assembly
When installing the rocker arms, make sure that the shaft assembly marks face the front of the engine, as shown in the diagram. After the assembly, make sure that the rocker arms move smoothly.
Assembly of rocker shaft assemblyInstallation of Pushrods
(1) Insert the pushrods in the cylinder head through the pushrod holes.(2) Make sure that the ball end of each pushrod rests securely on the curved surface of the tappet.Installation of Rocker Shaft Assemblies
(1) Install the valve caps.(2) When installing the rocker shaft brackets, tighten the long bolts first, then tighten the short bolts (reversal of removal sequence).
Installation of rocker shaft assemblyAdjustment of Valve Clearances
(1) Confirming the top dead center on the

Have questions with 101482-9283?





Group cross 101482-9283 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 612 527 
 
INJECTION-PUMP ASSEMBLY
4TNE94
101482-9283  
 
 
INJECTION-PUMP ASSEMBLY

Yanmar 

9 400 614 263 
12993051500 
INJECTION-PUMP ASSEMBLY
4TNE94
Back to top