101482-9220 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014829220


 

Information injection-pump assembly

ZEXEL 101482-9220 1014829220
101482-9220 INJECTION-PUMP ASSEMBLY
Rating:
79
Buy INJECTION-PUMP ASSEMBLY 101482-9220 zexel genuine, new aftermarket engine parts with delivery

Service parts 101482-9220 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101048-8170
3. GOVERNOR 105419-1990
4. SUPPLY PUMP 105220-6210
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-7020
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-5780
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7{160}
13. NOZZLE-HOLDER 105048-3390
14. NOZZLE 105017-0900
15. NOZZLE SET

Include in #1:

101482-9220 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101482-9220 1014829220


Zexel num
Bosch num
Firm num
Name
101482-9220 
 
  DPICO
INJECTION-PUMP ASSEMBLY
BD30 * Q

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.3
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   42.2 41.2 43.2
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   61 61 71
Fixing the lever   *
Rack limit   *
Injection quantity adjustment_03
Adjusting point   -
Rack position   9.2+-0.5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   8 6 10
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101482-9220
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting (6)Rack difference between N = N1 and N = N2
----------
K=15 N1=1150r/min N2=800r/min
----------

Speed control lever angle

Test data 101482-9220
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=9deg+-5deg b=20deg+-5deg

Stop lever angle

Test data 101482-9220
N:Pump normal S:Stop the pump.
----------

----------
a=12deg+-5deg b=53deg+-5deg

Timing setting

Test data 101482-9220
(1)Pump vertical direction (2)Position of gear mark 'ZZ' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=18deg
----------
a=(100deg)




Information:


Crankshaft fillet finishing dimension (2)
(a) When regrinding journals of the crankshaft, be sure to refinish all journals to the same dimension.(b) Finish the fillet radius to R3 mm [0.1181 in.].
Inspection of Oil Seal Contact Surface
Check the oil seal contact surface of the crankshaft back-end, and, if the crankshaft face has been excessively worn by the oil seal, replace the oil seal and oil sleeve with replacement parts.
Inspection of oil seal contact surface(1) Installation of oil seal sleeveTo install the oil seal sleeve, coat the inner surface of the sleeve with oil, and use the crankshaft sleeve installer for driving the sleeve into place.
Be careful not to dent or scratch the outer surface of the oil seal sleeve.
When the oil seal slinger becomes worn after engine operation, remove the oil seal sleeve by following the procedure below, and replace it with a replacement oil seal assembly (oil seal and oil seal sleeve).
Inspection of oil seal sleeve
Inspection of oil seal contact surface(2) Removal of oil seal sleeveAt three locations on the sleeve end face, hold a chisel at a right angle to the sleeve and strike with a hammer, and remove the sleeve when it becomes loose.If this method does not allow the removal of the sleeve, hold the chisel in the axial direction and lightly tap to expand and loosen the sleeve.
Be careful not to damage the crankshaft with the chisel when removing the oil seal sleeve.
Removal of oil seal sleeveMeasurement of Crankshaft Deflection
Support the crankshaft on its front and rear journals in V-blocks, and measure the runout at the center journal with a dial gage. Compare the amount of runout with the standard. If the runout is small, correct by grinding. If the runout is large, straighten with a press.If the runout exceeds the limit significantly, replace the crankshaft.
Measurement of crankshaft deflectionRemoval of Crankshaft Gear
Use the gear puller to remove the crankshaft gear. Do not remove the crankshaft gear unless the crankshaft or gear is replaced.
Removal of crankshaft gearInstallation of Crankshaft Gear
(1) Heat the gear to a temperature of 100 to 150 °C [212 to 302 °F].(2) Install the key to the crankshaft.(3) Align the gear with key and insert the gear fully.
Installation of crankshaft gearMeasurement of Cylinder Bore
(1) Using a cylinder gage, measure the cylinder bore and cylindricity. If the limit value is exceeded even at one place, bore all cylinders and replace the pistons and piston rings with oversize pistons and piston rings. Measure at three locations each in directions A and B shown in the diagram.
Measurement of inside diameter of cylinder(2) Boring of cylinders(a) Since there are two piston oversizes (0.25 mm [0.0098 in.] and 0.50 mm [0.0197 in.] oversize) as indicated above, determine the appropriate piston size to be used based on the largest cylinder bore diameter.(b) Measure the outside diameter of the piston to be used. The piston diameter measuring points are shown in the diagram.(c) Based on the measurements of the piston outside diameter, calculate the finishing dimension to be achieved by

Have questions with 101482-9220?





Group cross 101482-9220 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 521 
1679090361 
INJECTION-PUMP ASSEMBLY
BD30
 
1679090362 
INJECTION-PUMP ASSEMBLY
BD30
9 400 611 688 
1679090375 
INJECTION-PUMP ASSEMBLY
BD30
9 400 611 688 
1671390375 
INJECTION-PUMP ASSEMBLY
BD30

Dpico 

101482-9220  
 
 
INJECTION-PUMP ASSEMBLY
BD30
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1679090364 
INJECTION-PUMP ASSEMBLY
BD30
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 614 262 
1679090367 
INJECTION-PUMP ASSEMBLY
BD30
 
1671290170 
INJECTION-PUMP ASSEMBLY
BD30
9 400 612 301 
1671290178 
INJECTION-PUMP ASSEMBLY
BD30
F 01G 09U 01P 
1679090369 
INJECTION-PUMP ASSEMBLY
BD30
9 400 610 522 
1679090378 
INJECTION-PUMP ASSEMBLY
BD30

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
AL30
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 612 527 
 
INJECTION-PUMP ASSEMBLY
4TNE94
 
 
INJECTION-PUMP ASSEMBLY

Yanmar 

9 400 614 263 
12993051500 
INJECTION-PUMP ASSEMBLY
4TNE94

Nissan-Diesel 

 
1679090373 
INJECTION-PUMP ASSEMBLY
BD30
9 400 610 523 
1679090376 
INJECTION-PUMP ASSEMBLY
BD30
Back to top