101482-9150 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014829150


 

Information injection-pump assembly

ZEXEL 101482-9150 1014829150
101482-9150 INJECTION-PUMP ASSEMBLY
Rating:
66
Buy INJECTION-PUMP ASSEMBLY 101482-9150 zexel genuine, new aftermarket engine parts with delivery

Service parts 101482-9150 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101048-8150
3. GOVERNOR 105419-0440
4. SUPPLY PUMP 105220-5740
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-2920
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4910
11. Nozzle and Holder 16600-54T01
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3390
14. NOZZLE 105017-0900
15. NOZZLE SET

Include in #1:

101482-9150 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101482-9150 1014829150


Zexel num
Bosch num
Firm num
Name
101482-9150 
 
   
INJECTION-PUMP ASSEMBLY
14BC PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   B
Rack position   10.5
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   42.1 41.1 43.1
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   9+-0.5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   8 6 10
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   62 62 72
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101482-9150
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Main spring setting (5)Set idle sub-spring (6)Rack difference between N = N1 and N = N2
----------
K=12 N1=1150r/min N2=800r/min
----------

Speed control lever angle

Test data 101482-9150
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=18deg+-5deg b=10deg+-5deg

Stop lever angle

Test data 101482-9150
N:Pump normal S:Stop the pump.
----------

----------
a=12deg+-5deg b=53deg+-5deg

Timing setting

Test data 101482-9150
(1)Pump vertical direction (2)Position of gear mark 'ZZ' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=16deg
----------
a=(100deg)




Information:


Unsolder the leads quickly to prevent heat from damaging the diodes.
(b) Remove the rectifiers mounting screws, then remove the rectifier.
Removing statorInspection
Key Points For Inspection(1) Inspection Rectifier
With each diode, measure the resistance between the diode terminal and the heat sink. Measure the resistance with the tester's (+) probe applied to the diode terminal and with the tester's (-) probe applied to the diode terminal. If the resistance is infinite in both cases, there is an open circuit. If the resistance is close to zero in both cases, there is a short circuit. An open circuit or short circuit indicates a diode fault. Replace the rectifiers if any diode is faulty.Next, measure the resistance between the terminals of the leads that connect the rectifier to the stator coil for each of the diodes. If any measurement reveals an open circuit (infinite resistance) or a short circuit (near-zero resistance), replace the rectifier.
Inspecting rectifier(2) Inspecting Field Coil
(a) Check whether continuity exists between the rotor's slip rings. If continuity does not exist, the field coil is open-circuited and the rotor must be replaced.
Field coil continuity test(b) Check whether continuity exists between each slip ring and the rotor shaft (or core). If continuity exists, the field coil is grounded and the rotor must be replaced.
Field coil ground test(3) Inspecting Stator Coils
(a) Check whether continuity exists between the leads at the ends of each stator coil. If continuity does not exist between any coil's leads, there is an open circuit and the stator must be replaced.
Stator coil continuity test(b) Check whether continuity exists between each stator coil lead and the stator core. If continuity exists, the stator coil is grounded and the stator must be replaced.
Stator coil ground test(4) Inspecting Brushes
(a) Replace the brush if it is worn down to the wear limit line.
Inspecting Brush(b) Disconnect the brush lead wires at the soldered sections to remove the brushes and springs.
Removing brushes and springs(c) To install new brushes, press them into the brush holders as shown in the diagram, then solder the lead wires.
Installing brushesAssembly
Follow the reverse of disassembly and use the procedure below:(1) The rear bearing has a groove for the snap ring. Install the snap ring in this groove. Make sure its tab is in the deep portion of the groove.(2) When installing the new rear bearing, place it in position with the side that has a groove toward the slip rings of the rotor.(3) To install the rear bearing in the rear bracket, heat the rear bracket.(4) Before installing the rotor in the rear bracket, insert a wire-shaped tooling into the hole in the rear bracket to lift the brushes of the slip rings. Remove the tooling after the rotor has been installed in position.
Assembling alternatorInstallation
Perform installation by following the removal sequence in reverse. Key Points For Installation(1) Install the fan belt on the alternator and mount the alternator on the engine. Temporarily tighten all the bolts.(2) Insert a bar between the alternator and crankcase. Using the bar as leverage, move the alternator

Have questions with 101482-9150?





Group cross 101482-9150 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 578 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 614 258 
1679090311 
INJECTION-PUMP ASSEMBLY
BD304
9 400 611 141 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1679090312 
INJECTION-PUMP ASSEMBLY
BD304
9 400 611 743 
1679090377 
INJECTION-PUMP ASSEMBLY
BD304
 
1671290166 
INJECTION-PUMP ASSEMBLY
FD35T05
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1679090313 
INJECTION-PUMP ASSEMBLY
FD35T04
9 400 614 259 
1679090315 
INJECTION-PUMP ASSEMBLY
FD33T
101482-9150  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1679090316 
INJECTION-PUMP ASSEMBLY
BD30

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
BD30
 
 
INJECTION-PUMP ASSEMBLY
BD30
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 614 260 
1679090319 
INJECTION-PUMP ASSEMBLY
BD30
9 400 614 261 
1679090360 
INJECTION-PUMP ASSEMBLY
BD30
Back to top