101472-3700 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014723700 6144711122


 

Information injection-pump assembly

ZEXEL 101472-3700 1014723700
KOMATSU 6144711122 6144711122
101472-3700 INJECTION-PUMP ASSEMBLY
Rating:
46
Buy INJECTION-PUMP ASSEMBLY 101472-3700 zexel genuine, new aftermarket engine parts with delivery

Service parts 101472-3700 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101047-8180
3. GOVERNOR 105400-1520
4. SUPPLY PUMP 105220-1860
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105151-1530
11. Nozzle and Holder 6142-12-3300
12. Open Pre:MPa(Kqf/cm2) 11.8{120}
13. NOZZLE-HOLDER 105081-2190
14. NOZZLE 105000-1130
15. NOZZLE SET

Include in #1:

101472-3700 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101472-3700 1014723700
KOMATSU 6144711122 6144711122


Zexel num
Bosch num
Firm num
Name
101472-3700 
 
6144711122  KOMATSU
INJECTION-PUMP ASSEMBLY
4D94 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-4-3
Pre-stroke mm   2.2 2.15 2.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cal 1-3
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   40.5 39.5 41.5
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   7.3+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   9 8.2 9.8
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101472-3700
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK CAP: R1 (3)Torque control stroke
----------
K=11 R1=18+1mm
----------

Speed control lever angle

Test data 101472-3700
F:Full speed I:Idle S:Stop
----------

----------
a=14deg+-5deg b=32deg+-3deg c=22deg+-5deg

0000001501 LEVER

Test data 101472-3700
(F) P/N: Part number of the shim L1:Thickness (mm) 1. Adjustment of the control lever (1)Perform idling with the control lever (A) contacting the pushrod (B). At this time, confirm that the spring (C) is not compressed by control lever (A)'s operating torque. (2)To set the stop position, compress spring (C) using the control lever (A) and adjust the rack so that it contacts the guide screw (D) at position L2. Then, set and fix using the lock nut (E). Adjust the rack position L2 at this time using the shim (F). (3)Confirm that the control lever (A) returns to the idling position when pulled in the stop direction and then released.
----------
L2=0.2~2mm
----------

Timing setting

Test data 101472-3700
(1)Pump vertical direction (2)Position of key groove at No 1 cylinder's beginning of injection (3)Stamp aligning marks on the pump housing flange. (4)- (5)-
----------

----------
a=50deg24min+-3deg b=9deg36min+-30min




Information:

Additional Parts Needed for Installation
Fluid Property Sensor Mounting Bracket
A mounting bracket must be fabricated to support the Fluid Property Sensor. Since the kit can be used on a large range of engines in both stationary and machine applications, no universal mounting bracket design is possible. A bracket must be field fabricated to allow mounting of the sensor to a structural component of the machine. Leave room for electrical connection and room at each end for Engine Lubricating Oil line connections.Fittings and Adapters
Due to the large range of engines that this system may be used on, a list of all Engine Lubrication Oil line fittings, sizes, styles, and adapters are not possible. As a starting point, the inlet and outlet of the sensor adapter is a 37 degree Flare for 1" oil lines. This must be adapted to the correct size oil line tubing required for each engine. It is likely that the supply and return fuel lines will be of different sizes. It is recommended that the oil line tubing be new and in good condition. The tubing MUST be clean inside. Any small particles that are carried from the inlet hose through the transducer from the system and dislodge the particles. If hoses are equipped with O-ring fittings, the O-rings must be new.Wiring Diagram
Note: During Installation, it is important to protect wiring in key locations. Key locations are any area where the wiring could be nicked or cut and come in contact with the chassis. Avoid installation practices where there could be excessive flexing, chafing, or cutting of the wiring.
Illustration 1 g06137996
Fluid Property Sensor Wiring Schematic
Installation
Machine Preparation
Move the machine to a smooth, level location, and away from other working machines and personnel.
Lower the implements to the ground.
Stop the engine.
Engage the parking brake for the machine.
Place the disconnect switch in the OFF position.
Follow all LOTO instructions for the machine.Installation of the Fluid Property Sensor
The Fluid Property Sensor must be located on a field fabricated bracket in a location of the installer's choice. When selecting a mounting location, the installer must mount the sensor in an area off the engine to reduce vibration of the sensor as well as accessibility of sensor and electrical connection. Electrical connections should avoid sharp bends at connectors, sharp edges, and chafing surfaces. Harnesses should be supported at no less than 30.48 cm (12 inch) intervals. The Fluid Property Sensor must be installed with the orifice opening in the upright position as shown in Illustration 2.
Illustration 2 g06138010
Fluid Property Sensor Installation
(A) Oil Pump
(B) Oil Filter
(C) Engine Oil Gallery
(D) Isolation Valve
(E) Oil Flow
(F) Fluid Property Sensor Orientation
(G) Oil Reservoir
(H) Oil Strainer
(I) Engine Oil SumpInstallation of the Electrical Harnesses
Note: During installation, it is important to protect wiring in key locations. Key locations are any area where the wiring could be nicked or cut and come in contact with the chassis. Avoid installation practices where there could be excessive flexing, chafing, or cutting of the wiring.
Install the 514-3811 Instl GP-Field (Fluid Property Harness) on Fluid Property Sensor.
Route harness back

Have questions with 101472-3700?





Group cross 101472-3700 ZEXEL

Komatsu 

101472-3700  
 
6144711122 
INJECTION-PUMP ASSEMBLY
4D94
9 400 614 198 
6144751104 
INJECTION-PUMP ASSEMBLY
4D94
9 400 614 199 
6144711152 
INJECTION-PUMP ASSEMBLY
4D94
 
6144751302 
INJECTION-PUMP ASSEMBLY
4D94
9 400 614 200 
6144751201 
INJECTION-PUMP ASSEMBLY
4D94
 
6144711250 
INJECTION-PUMP ASSEMBLY
4D94
9 400 614 201 
6144751303 
INJECTION-PUMP ASSEMBLY
4D94
 
6144711290 
INJECTION-PUMP ASSEMBLY
4D94
 
6144751105 
INJECTION-PUMP ASSEMBLY
4D94
 
6144711210 
INJECTION-PUMP ASSEMBLY
4D94
 
6144711211 
INJECTION-PUMP ASSEMBLY
4D94
Back to top