101472-3600 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014723600 6144711150


 

Information injection-pump assembly

ZEXEL 101472-3600 1014723600
KOMATSU 6144711150 6144711150
101472-3600 INJECTION-PUMP ASSEMBLY
Rating:
34
Buy INJECTION-PUMP ASSEMBLY 101472-3600 zexel genuine, new aftermarket engine parts with delivery

Service parts 101472-3600 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101047-8190
3. GOVERNOR 105400-1590
4. SUPPLY PUMP 105220-1860
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105151-1530
11. Nozzle and Holder 6142-12-3300
12. Open Pre:MPa(Kqf/cm2) 11.8{120}
13. NOZZLE-HOLDER 105081-2190
14. NOZZLE 105000-1130
15. NOZZLE SET

Include in #1:

101472-3600 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

ZEXEL 101472-3600 1014723600
KOMATSU 6144711150 6144711150


Zexel num
Bosch num
Firm num
Name
101472-3600 
 
6144711150  KOMATSU
INJECTION-PUMP ASSEMBLY
4D94 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-4-3
Pre-stroke mm   2.2 2.15 2.25
Rack position
Point A
  R=A
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cal 1-3
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.1
Pump speed r/min   1225 1225 1225
Average injection quantity mm3/st.   29 28 30
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   7.8
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   9 8.2 9.8
Max. variation between cylinders %   0 -15 15
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101472-3600
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK CAP: R1
----------
K=10 R1=18+-1mm
----------

Speed control lever angle

Test data 101472-3600
F:Full speed I:Idle S:Stop
----------

----------
a=9deg+-5deg b=32deg+-3deg c=23deg+-5deg

Timing setting

Test data 101472-3600
(1)Pump vertical direction (2)Position of key groove at No 1 cylinder's beginning of injection (3)Stamp aligning marks on the pump housing flange. (4)- (5)-
----------

----------
a=50deg24min+-3deg b=9deg36min+-30min




Information:


Illustration 2 g06542023
(T1a) Eccentric gasket
Install adjustment tool (T1) on the injector for center cylinder (2) using eccentric gasket (T1a). Install eccentric gasket (T1a) over the check valve in place of the O-ring.
Illustration 3 g06542029
(T1b) Supply fitting
(T1c) Purge hose
(T2) Inlet hose
Connect a suitable container filled with clean diesel fuel to supply fitting (T1b) using inlet hose (T2). Place a small cup under purge hose (T1c).
Illustration 4 g06536094
(1) Drive clutch side cylinder
(2) Center cylinder
(3) Alternator side cylinder
(A) TDC index mark
Rotate the engine in the direction of rotation (clockwise) until center cylinder (2) is at Top-Dead-Center (TDC) with the compression stroke. The reference mark for center cylinder (2) must be aligned with the TDC index mark (A) and the valves must be closed.
Illustration 5 g06536129
Center cylinder (2) at 11° Before-Top-Dead-Center (BTDC)
(1) Drive clutch side cylinder
(2) Center cylinder
(3) Alternator side cylinder
(A) TDC index mark
Illustration 6 g06542031
(T1c) Purge hose
Raise the fuel container above the level of the injector. Rotate the engine counterclockwise until reference mark (2) is to the left of the 11° Before-Top-Dead-Center (BTDC) mark or until fuel is observed flowing from purge hose (T1c).
Illustration 7 g06542019
(T1c) Purge hose
Rotate the engine clockwise and stop immediately when the fuel stops flowing from purge hose (T1c). The beginning of injection has been reached when the fuel stops flowing.
Illustration 8 g06536129
Center cylinder (2) rotated 11°
(1) Drive clutch side cylinder
(2) Center cylinder
(3) Alternator side cylinder
(A) TDC index mark
Observe the alignment of the reference mark for center cylinder (2) and the 11° BTDC mark.Note: If mark (2) aligns with the 11° mark, timing is correct and proceed to Step 9. If marks are not aligned, the injector timing must be adjusted. Adjust injector timing using the procedure in Step 8.
Observe the position of the reference mark for center cylinder (2) and the mark at 11° of rotation for BTDC. Note if the injector timing is early or late.Note: If the reference mark for center cylinder (2) is left of the 11° BTDC mark, injector timing is early. If the mark is to the right, injector timing is late.
Illustration 9 g06536148
(B) Jam nut
Rotate the engine to align the reference mark for center cylinder (2) and the 11° BTDC mark. Loosen jam nut (B) on the fuel injector timing adjustment screw. For late timing, proceed to Step 8b. For early timing, proceed to Step 8c
Illustration 10 g06536146
(C) Adjustment screw
Late Timing: While watching purge hose (T1c), turn adjustment screw (C) clockwise until fuel flow stops.
Early Timing: While watching purge hose (T1c), turn adjustment screw (C) counterclockwise until fuel flow starts. Then, turn adjustment screw (C) clockwise until fuel flow stops.
Hold adjustment screw (C) and tighten jam nut (B) securely. Check the injector timing by repeating Steps 5 through 7.
Remove adjustment tool (T1) and install with eccentric gasket (T1a) on the injector for drive clutch side cylinder (1). Rotate the engine 120° clockwise using the reference mark for cylinder (1). Repeat Steps 4 through 8.
Repeat Step 9 for alternator side cylinder (3).
Illustration 11 g06543249
(1) 562-0435 O-Ring Seal
Remove adjustment tool (T1) and eccentric gasket (T1a). Reinstall the fuel rail with four new

Have questions with 101472-3600?





Group cross 101472-3600 ZEXEL

Komatsu 

101472-3600  
 
6144711150 
INJECTION-PUMP ASSEMBLY
4D94
 
6144711160 
INJECTION-PUMP ASSEMBLY
4D94
 
6144711320 

 
6144751103 
INJECTION-PUMP ASSEMBLY
4D94
 
6144711170 
INJECTION-PUMP ASSEMBLY
4D94
 
6141741023 
INJECTION-PUMP ASSEMBLY
4D92
 
6141741024 
INJECTION-PUMP ASSEMBLY
4D92
9 400 614 197 
6141741025 
INJECTION-PUMP ASSEMBLY
4D92
 
6144791100 

4D94
 
6144791300 

4D94
 
6144791200 

4D94
 
6144711111 
INJECTION-PUMP ASSEMBLY
4D94
Back to top