Information injection-pump assembly
ZEXEL
101461-0281
1014610281
ISUZU
5156012320
5156012320

Rating:
Service parts 101461-0281 INJECTION-PUMP ASSEMBLY:
1.
_
4.
SUPPLY PUMP
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
5-15300-097-0
12.
Open Pre:MPa(Kqf/cm2)
11.8{120}
15.
NOZZLE SET
Cross reference number
ZEXEL
101461-0281
1014610281
ISUZU
5156012320
5156012320
Zexel num
Bosch num
Firm num
Name
101461-0281
5156012320 ISUZU
INJECTION-PUMP ASSEMBLY
4BA1 *
4BA1 *
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
1.95
1.9
2
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
11.75
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
43.2
41.2
45.2
Max. variation between cylinders
%
0
-4
4
Fixing the rack
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
10.6
Pump speed
r/min
1750
1750
1750
Average injection quantity
mm3/st.
43.9
42.4
45.4
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the rack
*
Injection quantity adjustment_03
Adjusting point
C
Rack position
8.4+-0.5
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
8.5
7.1
9.9
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Injection quantity adjustment_04
Adjusting point
D
Rack position
16.5++
Pump speed
r/min
150
150
150
Average injection quantity
mm3/st.
75
75
Fixing the rack
*
Remarks
Excess fuel for starting.
Excess fuel for starting.
Timer adjustment
Pump speed
r/min
500
Advance angle
deg.
0.5
Timer adjustment_02
Pump speed
r/min
700
Advance angle
deg.
1
Timer adjustment_03
Pump speed
r/min
1000
Advance angle
deg.
1.5
1
2
Timer adjustment_04
Pump speed
r/min
1400
Advance angle
deg.
4
3.5
4.5
Timer adjustment_05
Pump speed
r/min
1750
Advance angle
deg.
6
6
7
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
P:Negative pressure
(1)Pneumatic governor
(2)Mechanical governor
(3)Adjustment speed N1
(4)Beginning of idle sub spring operation: L1
(5)Acting negative pressure: P1
(6)Injection quantity Q = Q1 or less
----------
N1=500r/min L1=5.5+-0.5mm Q1=3mm3/st
----------
----------
N1=500r/min L1=5.5+-0.5mm Q1=3mm3/st
----------
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=11deg
----------
a=(90deg)
----------
aa=11deg
----------
a=(90deg)
Information:
Illustration 6 g06613192
Gray locking wedge removed from ECM connector
Remove gray locking wedge from 86-pin connector to provide access to release the DT Pins.Note: Circuit U937 to be removed from pin location number 24 and transferred to pin location 73.Note: Cloth tape will need to be removed to the split in the harness main bundle.Note: The U937 wire can then be routed into the opposite branch to gain enough free length to make the connection.Note: The U939 wire removed from pin location 73 has adequate length to be loaded into location 16.
Transfer and relocate the wires as detailed in Table 2.
Reinstall the locking wedge (B) when all wires have been transferred and relocated.
Illustration 7 g06613197
View of back of ECM connector with connector cover (D) removed
Apply cloth tape to both wire branches from the main bundle of wires up the branches to the harness strain relief strap location.
Illustration 8 g06613199
Connector cover (D) reinstalled with harness secured
(1) 3S-2093 Cable Strap
(D) Connector cover
Reinstall connector cover (D) and secure the harness branches using two cable straps (1).
Use caution when re-engaging the connector with the ECM.
Tighten allen head screw (A).Note: In certain cases, U937 may require lengthening to provide adequate strain relief when relocated in pin 73.Note: Refer to "Soldered Splice","Deutsch connector", or "Sealed Mechanical Splice" for the proper way to extend circuit U937.Soldered Splice
A soldered spliced can be made to extend the wire. Soldered connection will need to be insulated using an appropriately sized adhesive head shrink sleeve.
Illustration 9 g06613210
U937 removed
Remove U937 from ECM connector.
Cut pin off end of wire.
Strip wire 7.5 mm (0.30 inch).
Illustration 10 g06613213
Additional wire soldered to circuit U937
Solder to additional wire to extend U937 and install appropriate sized adhesive head shrink sleeve.
Install pin on end of U937.
Insert U937 into pin 73.
Refer to "Procedure to Change Connector Plug Assembly Pins" for the proper method to reinstall ECM connector.Deutsch connector
Table 3
Required Parts
Qty Part Number Part Name
1 115-8109 Wire Splice Note: The deutsch connector is a field serviceable alternative to permanent splices. It is made from the same high-quality silicone elastomer as used for the Deutsch connector seals and grommets. The splice body houses a contact retention system that secures a mated pair of contacts in a compact environmentally sealed unit. This splice can also be serviced with standard deutsch connector tools.
Illustration 11 g06613218
Deutsch connector section view
Illustration 12 g06613221
Deutsch connector splice installed
Illustration 13 g06613224
Sufficient strain relief for deutsch connector
Refer to "Procedure to Change Connector Plug Assembly Pins" for the proper method to reinstall ECM connectorSealed Mechanical Splice
Table 4
Required Parts
Qty Part Number Part Name
1 136-4877 Wire Splice Note: Sealed mechanical splices have head-shrinkable, environmentally sealed sleeves.
Illustration 14 g06613205
Sealed mechanical splice
Select appropriate splice size.
Strip wire 7.5 mm (0.3 inch).
Insert stripped wire into sealed mechanical splice.
Crimp sealed mechanical splice.
Apply heat to the crimped splice until tubing re-covers and adhesive flows.
Refer to "Procedure to Change Connector Plug Assembly Pins" for the proper method to reinstall ECM connector
Have questions with 101461-0281?
Group cross 101461-0281 ZEXEL
Isuzu
101461-0281
5156012320
INJECTION-PUMP ASSEMBLY
4BA1
4BA1