Information injection-pump assembly
BOSCH
9 400 610 505
9400610505
ZEXEL
101441-9561
1014419561
NISSAN-DIESEL
1670011T62
1670011t62

Rating:
Service parts 101441-9561 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
16600-43G02
12.
Open Pre:MPa(Kqf/cm2)
9.8{100}
15.
NOZZLE SET
Include in #1:
101441-9561
as INJECTION-PUMP ASSEMBLY
Include in #2:
105866-7280
as _
Cross reference number
Zexel num
Bosch num
Firm num
Name
101441-9561
9 400 610 505
1670011T62 NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
TD27 * K
TD27 * K
Information:
Illustration 1 g00565418
4W-8471 Time Delay Relay
Use a 6V-7070 Digital Multimeter, a stopwatch, and a battery (8 volts to 40 volts) for this test.
Connect the positive lead of the voltage source to terminal (TD-4) of the time delay relay. Connect the negative lead to terminal (TD-3). If the test is done on an engine, the start/stop switch must be in the STOP position in order to power terminal (TD-6). All connections must be maintained until the tests are completed.
Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 1
Terminals     Relay Position    
5-6     Closed    
6-7     Open    
Connect the positive lead of the voltage source to terminal (TD-1). If the time delay relay is tested on the engine do not leave the voltage source hooked to terminal (TD-1) for more than 60 seconds. The fuel shutoff solenoid will be energized. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 2
Terminals     Relay Position    
5-6     Open    
6-7     Closed    
Remove the positive lead of the voltage source from terminal (TD-1). Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 3
Terminals     Delay Time of Relay Position    
0 to 60 seconds 80 seconds or more    
5-6     Open     Closed    
6-7     Closed     Open    Note: If a jumper is normally installed across terminals (TD-2) and (TD-3), the jumper must be removed before performing Step 5.
Connect the positive lead of the voltage source to terminal (TD-2). If the time delay relay is tested on the engine, do not leave the voltage source on terminal (TD-2) for more than 60 seconds. The fuel shutoff solenoid will be energized. Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 4
Terminals     Delay Time of Relay Position    
0 to 8 seconds 10 seconds or more    
5-6     Closed     Open    
6-7     Open     Closed    
Remove the positive lead of the voltage source from terminal (TD-1). Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 5
Terminals     Delay Time of Relay Position    
0 to 60 seconds 80 seconds or more    
5-6     Open     Closed    
6-7     Closed     Open    
Remove the voltage source from terminal (TD-4). Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 6
Terminals     Relay Position    
5-6     Closed    
6-7     Open    
Have questions with 101441-9561?
Group cross 101441-9561 ZEXEL
Nissan-Diesel
101441-9561
9 400 610 505
1670011T62
INJECTION-PUMP ASSEMBLY
TD27
TD27