101441-9331 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1014419331


 

Information injection-pump assembly

ZEXEL 101441-9331 1014419331
101441-9331 INJECTION-PUMP ASSEMBLY
Rating:
35
Buy INJECTION-PUMP ASSEMBLY 101441-9331 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101441-9331 
101441-9332 
 
  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
SD23 *




Information:


Illustration 39 g00367353
Set the drive speed to "Col 4". Place a straight edge across the opening in the shutdown rod and the shutdown rod nut (F). Use a 7/16 inch open end wrench in order to turn the shutdown rod nut (F) counterclockwise until the governor begins to shut down. Once the governor begins to shut down, turn the nut clockwise one full turn.Adjustment Of The Shutdown Device
Note: The electric shutdown device and the pressure shutdown device should be checked prior to the installation, after the installation, and at 1000 hour intervals thereafter.
Failure to test, inspect and maintain these items could result in faulty operation and possible severe engine damage if an emergency shutdown situation occurs.
The electric shutdown is either an Energize-To-Shutoff (ETS) or an Energize-To-Run (ETR). Identify the type of shutdown device in your governor, and make a note of the type of shutdown device.
Visually inspect the pressure shutdown components for signs of burrs, nicks, scoring and/or wear. Repair the components if evidence of a problem exists. Inspect the pressure shutdown gasket. Determine if the gasket is reusable. If necessary, replace the gasket.
Illustration 40 g00367319
(F) Shutdown Rod Nut. (J) Shutdown Rod. (II) Solenoid. (JJ) Jam Nut. (KK) Set Screw. (LL) Shutdown Plunger. (MM) Solenoid Plunger. (NN) Pivot Pin. (PP) Shutdown Lever.
Visually inspect the electric shutdown device and determine if there is any component wear. If the shutdown is an ETS version, pay particular attention to the connection of the shutdown solenoid's plunger and the shutdown lever's link pin.If there is evidence of wear, replace the solenoid. Inspect the gasket on the electric shutdown. Determine if the gasket is reusable. If necessary, replace the gasket.Check the size of spacer on the solenoid plunger in the electric shutdown. Refer to the Service Magazine Article November 19,, "Field Replacement of Spacer to Correct Possible Sticking in Woodward 3161 Governor Electric Shutoff Group".Adjustment Of The Electric Shutdown Solenoid
Energize-To-Shutoff (ETS)
Place the housing of the electric shutdown in a vise. Use copper jaws or shop towels in order to protect the sides of the aluminum die cast housing. Do NOT excessively tighten the vise.Loosen the jam nut (JJ) that holds the solenoid in the electric shutdown's housing. Remove the solenoid coil (II) in order to expose the shutdown plunger (MM) .Note: Loctite 222 is used on the threads of the solenoid coil during manufacturing. In addition, the jam nut is tightened to a torque of 75 N m (55.5 lb ft).
Carefully clean any dirt, metal filings or metal chips from the solenoid plunger and from the cavity in the solenoid coil. Turn the jam nut on the solenoid coil so that the nut will not interfere with the adjustment of the solenoid coil. Reinstall the solenoid coil in the electric shutdown's housing by turning the coil four times.
Hold the housing and the gasket on a

Have questions with 101441-9331?





Group cross 101441-9331 ZEXEL

Nissan-Diesel 

 
1670029W06 
INJECTION-PUMP ASSEMBLY
SD25
 
1679090177 
INJECTION-PUMP ASSEMBLY
SD25
 
1670064W00 
INJECTION-PUMP ASSEMBLY
SD25
 
 
INJECTION-PUMP ASSEMBLY
SD23
101441-9331  

101441-9332 
 
 
INJECTION-PUMP ASSEMBLY
SD23
 
16700V6604 
INJECTION-PUMP ASSEMBLY
SD23
 
16700J1800 
INJECTION-PUMP ASSEMBLY
SD25
 
16700J1801 
INJECTION-PUMP ASSEMBLY
SD25
9 400 610 087 
1670064W01 
INJECTION-PUMP ASSEMBLY
SD25
 
16700V6605 
INJECTION-PUMP ASSEMBLY
SD23
F 01G 09U 01J 
16700T8278 
INJECTION-PUMP ASSEMBLY
SD25
Back to top