101433-9110 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014339110 16700t5601


 

Information injection-pump assembly

ZEXEL 101433-9110 1014339110
NISSAN-DIESEL 16700T5601 16700t5601
101433-9110 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 101433-9110 zexel genuine, new aftermarket engine parts with delivery

Service parts 101433-9110 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101043-8480
3. GOVERNOR 105542-6871
4. SUPPLY PUMP 105220-5001
5. AUTOM. ADVANCE MECHANIS 105622-0240
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105141-1881
11. Nozzle and Holder 16600-20053
12. Open Pre:MPa(Kqf/cm2) 9.8{100}
13. NOZZLE-HOLDER 105071-1241
14. NOZZLE 105000-1080
15. NOZZLE SET

Include in #1:

101433-9110 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101433-9110 1014339110
NISSAN-DIESEL 16700T5601 16700t5601


Zexel num
Bosch num
Firm num
Name
101433-9110 
 
16700T5601  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
SD22 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   2.3 2.25 2.35
Rack position
Point B
  R=B
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   12
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   37 36 38
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   11
Pump speed r/min   1700 1700 1700
Average injection quantity mm3/st.   37 35.4 38.6
Max. variation between cylinders %   0 -4 4
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   6
Pump speed r/min   1700 1700 1700
Average injection quantity mm3/st.   8 7.2 8.8
Max. variation between cylinders %   0 -7.5 7.5
Fixing the rack   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   7.7
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   7.5 6.4 8.6
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_05
Adjusting point   -
Rack position   -
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   37 36.5 37.5
Remarks
Set full load.
 
Timer adjustment
Pump speed r/min   500
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   550
Advance angle deg.   0.7
Timer adjustment_03
Pump speed r/min   700
Advance angle deg.   1 0.5 1.5
Timer adjustment_04
Pump speed r/min   900
Advance angle deg.   2 1.5 2.5
Timer adjustment_05
Pump speed r/min   1100
Advance angle deg.   3 2.5 3.5
Timer adjustment_06
Pump speed r/min   1300
Advance angle deg.   4 3.5 4.5
Timer adjustment_07
Pump speed r/min   1500
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101433-9110
N:Pump speed R:Rack position (mm) P:Negative pressure (1)Pneumatic governor (2)Mechanical governor (3)Acting negative pressure: P1 (4)RACK LIMIT: RAL (5)Beginning of idle sub spring operation: L1 (6)Injection quantity Q = Q1 or less
----------
RAL=16mm L1=7.5+0.3mm Q1=3mm3/st
----------

Speed control lever angle

Test data 101433-9110
F:Full speed N:Normal S:Stop
----------

----------
a=3.5deg+-5deg b=12deg+-5deg c=20.5deg+-3deg

Timing setting

Test data 101433-9110
(1)Pump vertical direction (2)Position of gear mark 'Y' at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(130deg)




Information:

1. Loosen bolt (1).2. Loosen bolt (3).3. Push alternator (2) toward the engine to loosen the tension on the two alternator V-belts.4. Remove two alternator V-belts (4) from the alternator drive pulley and fan drive (6).5. Fasten a lifting strap and a hoist to fan drive (6). Remove four bolts (5) and the washers that hold the fan drive to the cylinder head assembly. Remove the fan drive. The weight of the fan drive is approximately 11 kg (25 lb). The following steps are for the installation of the fan drive.6. Be sure the mating surface on the cylinder head assembly and the mating surface on the fan drive support are thoroughly clean.7. Install the fan drive in the reverse order of removal.8. Adjust the tension of the alternator V-belts. See the topic "Alternator And Fan Drive Belts, Inspect/Adjust/Replace" in the 3114 & 3116 ATAAC Diesel Truck Engine Operation & Maintenance Manual, Form No. SEBU6723. Also, refer to the "Belt Tension Chart" in the 3114 & 3116 Diesel Truck Engines Specifications module, Form No. SENR6436.End By:a. install fan drive clutch assemblyDisassemble & Assemble Fan Drive
Start By:a. remove fan drive 1. Remove three bolts (6) and the washers. Access to bolts (6) can be made by rotating the fan pulley.2. Remove fan pulley assembly (2) from fan support (1).3. Remove two bolts (4) and thrust plate (5).4. Remove roller bearing assembly (8) and the bearing retainer from the fan pulley. Remove O-ring seal (7) from the bearing retainer. The following steps are for the assembly of the fan drive group.5. Be sure all parts of the fan drive group are thoroughly clean prior to assembly.6. Check the condition of O-ring seal (7) used in the bearing retainer. Also, check the condition of roller bearing assembly (8). If the components are damaged, use new parts for replacement.7. Install roller bearing assembly (8) in the bearing retainer. Be sure the lip seal in the roller bearing assembly is facing toward the bearing retainer.8. Install O-ring seal (7) in the bearing retainer. Put the bearing retainer and roller bearing assembly, as a unit, in position on pulley (2). Be sure the inner race of the roller bearing assembly in seated against the shoulder on the pulley.9. Install thrust plate (5) and two bolts (4).10. Put pulley assembly (2) in position in fan support (1). Install the three washers and bolts (6) that hold the unit together. Access to the mounting bolt holes can be made by rotating the fan pulley.11. Fill the bearing cavity in the fan drive with 30 g (1 oz) of 2S3230 Bearing Lubricant.End By:a. install fan drive

Have questions with 101433-9110?





Group cross 101433-9110 ZEXEL

Nissan-Diesel 

 
16700Y7507 
INJECTION-PUMP ASSEMBLY
SD20
101433-9110  
 
16700T5601 
INJECTION-PUMP ASSEMBLY
SD22
 
16700Y7506 
INJECTION-PUMP ASSEMBLY
SD20
 
16700V0602 
INJECTION-PUMP ASSEMBLY
SD22
 
16700V0603 
INJECTION-PUMP ASSEMBLY
SD20
 
1670031W01 
INJECTION-PUMP ASSEMBLY
SD22
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1679090060 
INJECTION-PUMP ASSEMBLY
SD22
 
1671290060 

SD22
9 400 614 122 
1671290062 
INJECTION-PUMP ASSEMBLY
SD22
 
1679090062 

SD22
Back to top