101431-9350 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014319350 1679090008


 

Information injection-pump assembly

ZEXEL 101431-9350 1014319350
NISSAN-DIESEL 1679090008 1679090008
101431-9350 INJECTION-PUMP ASSEMBLY
Rating:
70
Buy INJECTION-PUMP ASSEMBLY 101431-9350 zexel genuine, new aftermarket engine parts with delivery

Service parts 101431-9350 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101043-8240
3. GOVERNOR 105412-1470
4. SUPPLY PUMP 105220-4630
5. AUTOM. ADVANCE MECHANIS 105622-0240
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105141-1800
11. Nozzle and Holder 16600-90019
12. Open Pre:MPa(Kqf/cm2) 9.8{100}
13. NOZZLE-HOLDER 105071-1240
14. NOZZLE 105000-1010
15. NOZZLE SET

Include in #1:

101431-9350 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101431-9350 1014319350
NISSAN-DIESEL 1679090008 1679090008


Zexel num
Bosch num
Firm num
Name
101431-9350 
 
1679090008  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
SD22PU * K 14BC PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   2.3 2.25 2.35
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   14.5
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   33 32 34
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   13.8
Pump speed r/min   1550 1550 1550
Average injection quantity mm3/st.   35.5 34 37
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   10+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   5 4 6
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Timer adjustment
Pump speed r/min   500+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   700
Advance angle deg.   1 0.5 1.5
Timer adjustment_03
Pump speed r/min   900
Advance angle deg.   2 1.5 2.5
Timer adjustment_04
Pump speed r/min   1100
Advance angle deg.   3 2.5 3.5
Timer adjustment_05
Pump speed r/min   1300
Advance angle deg.   4 3.5 4.5
Timer adjustment_06
Pump speed r/min   1500
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101431-9350
N:Pump speed R:Rack position (mm)
----------

----------

Speed control lever angle

Test data 101431-9350
F:Full speed I:Idle S:Stop
----------

----------
a=(28deg) b=43deg c=(32deg)

Stop lever angle

Test data 101431-9350
N:Pump normal S:Stop the pump.
----------

----------
a=(19deg) b=(34deg)




Information:

Overcooling
25. Defective Temperature GaugeIf the temperature gauge shows that the coolant temperature is below normal and all other conditions indicate that conditions are normal, check the coolant temperature in another method, such as:* Read the coolant temperature with an ECAP or DDT.* Install an 8T0470 Thermistor Thermometer Group* Install a temperature sensitive tape.* Install a new gauge that is known to be good.26. Defective Coolant Temperature SensorIf a fault is detected in the coolant temperature sensor circuit, determine if the fault is in the wiring or the coolant temperature sensor following the procedure in Electronic Troubleshooting, 3176 Diesel Truck Engine, Form No. SENR3913. Repair or replace parts as needed. The coolant temperature sensor should be accurate within plus or minus 3° C (6° F). Check the accuracy of the sensor if it is found to be out of specification.27. Long Idle PeriodsRunning the engine for extended periods of time under no load conditions will cause the engine heat to be removed at a faster rate than it is being generated.28. Very Light LoadsVery light loads, very slow speeds, or downhill travel can cause below normal heating due to the decreased amount of fuel that is being burned. The installation of shutters will help correct this problem by decreasing the flow of air into the engine compartment.29. Defective Water Temperature RegulatorIf the water temperature regulator is stuck open, it will cause below normal engine heating. To test the thermostat, see the topic, Testing The Cooling System, in the Testing and Adjusting section of Systems Operation, Testing and Adjusting, Form No. SENR3909.30. Faulty Fan Clutch (Will Not Disengage)Check for proper operation of the fan clutch. Refer to the Truck Manufacturer's Service Manual for the proper procedure.31. Vent Line OpenIf the vent line (OEM) between the temperature regulator and the radiator top tank is open, overcooling could result. Install a valve assembly in the line that will allow air venting but restrict coolant flow with the engine running.

Have questions with 101431-9350?





Group cross 101431-9350 ZEXEL

Nissan-Diesel 

 
1670086000 

 
1679090007 

 
1670090509 
INJECTION-PUMP ASSEMBLY
SD22
101431-9350  
 
1679090008 
INJECTION-PUMP ASSEMBLY
SD22PU
 
1671290012 
INJECTION-PUMP ASSEMBLY
SD22
 
1670090504 

 
1670086001 

SD22
Back to top