Service parts 101431-0840 INJECTION-PUMP ASSEMBLY:
1.
_
3.
GOVERNOR
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
10.
NOZZLE AND HOLDER ASSY
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
13.
NOZZLE-HOLDER
14.
NOZZLE
15.
NOZZLE SET
Cross reference number
BOSCH
9 400 614 091
9400614091
ZEXEL
101431-0840
1014310840
ISUZU
5156012121
5156012121
Zexel num
Bosch num
Firm num
Name
101431-0840
9 400 614 091
5156012121 ISUZU
INJECTION-PUMP ASSEMBLY
C240 K 14BC INJECTION PUMP ASSY PE4A,5A, PE
C240 K 14BC INJECTION PUMP ASSY PE4A,5A, PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Left L
Left L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left L
Left L
Injection order
1-3-4-2
Pre-stroke
mm
2.25
2.2
2.3
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
11.9
Pump speed
r/min
1900
1900
1900
Average injection quantity
mm3/st.
42
41
43
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the rack
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
8.2+-0.5
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
8
6.9
9.1
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
-
Rack position
-
Pump speed
r/min
1900
1900
1900
Average injection quantity
mm3/st.
42
41.5
42.5
Remarks
Smoke setting: 3.2 kPa {400 mmAq}
Smoke setting: 3.2 kPa {400 mmAq}
Timer adjustment
Pump speed
r/min
500+-50
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
800
Advance angle
deg.
1
0.5
1.5
Timer adjustment_03
Pump speed
r/min
1050
Advance angle
deg.
2
1.2
2.7
Timer adjustment_04
Pump speed
r/min
1500
Advance angle
deg.
4.5
3.9
5
Timer adjustment_05
Pump speed
r/min
1750
Advance angle
deg.
6
5.5
6.5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
P:Negative pressure
(1)Pneumatic governor
(2)Mechanical governor
(3)Acting negative pressure: P1
(4)Beginning of idle sub spring operation: L1
(5)Injection quantity Q = Q1 or less
----------
L1=9-0.3mm Q1=3mm3/st
----------
----------
L1=9-0.3mm Q1=3mm3/st
----------
Timing setting
(1)Pump vertical direction
(2)Gear mark Z for the No. 4 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=14deg
----------
a=(60deg)
----------
aa=14deg
----------
a=(60deg)
Information:
1. Drain the coolant and oil from the engine.2. Remove bolt (1) and retainer (2) that hold the oil lines in the BrakeSaver control valve. 3. Disconnect oil lines (3) and (4) from the oil cooler. Remove oil lines (3) and (4) from the BrakeSaver control valve.4. Fasten a hoist to the oil cooler. 5. Remove two bolts (8) to disconnect elbow (10) from front bonnet (9). Remove two bolts (7) to disconnect front bonnet (9) from water pump.6. Remove four bolts (5) to disconnect the rear bonnet from the cylinder block. Disconnect bracket (12).7. Remove oil cooler (11), front bonnet (9) and rear bonnet (6) from the engine as a unit. The weight is approximately 54 kg (120 lb.).8. Make a separation of front bonnet (9) and rear bonnet (6) from oil cooler (11). 9. Clean oil cooler core tubes (13) with a 3.81 mm (.150 in.) diameter rod.10. Inspect all O-ring seals and gaskets for damage, and make replacements if needed. Put clean engine oil on the O-ring seals.11. Install rear bonnet (6) and front bonnet (9) on oil cooler (11).12. Fasten a hoist, and put the oil cooler and bonnets as a unit on the engine. Connect bracket (12) but do not tighten the bolts at this time.13. Install the gasket and four bolts (5) that hold rear bonnet (6) to the engine block. Do not tighten the bolts at this time.14. Install the gasket and two bolts (7) that hold front bonnet (9) to the water pump. Do not tighten the bolts at this time.15. Install the gasket and bolts (8) that hold elbow (10) to the front bonnet. Tighten all the bolts.16. Make sure the O-ring seals are in place on the oil lines, and install oil lines (3) and (4).17. Install retainer (2) to hold the oil lines in the BrakeSaver control valve. If the bottom plug in the oil pan was removed, put the split (seam) of the gasket for the plug against the oil pan. If either plug on the side of the oil pan was removed, put 5P3413 Thread Sealant With Teflon on the threads, and tighten the plug to a torque of 80 11 N m (60 8 lb ft.).18. Fill the engine with coolant and oil. See the Maintenance Guide.
Have questions with 101431-0840?
Group cross 101431-0840 ZEXEL
Isuzu
101431-0840
9 400 614 091
5156012121
INJECTION-PUMP ASSEMBLY
C240
C240