101431-0330 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1014310330 5156007451


 

Information injection-pump assembly

ZEXEL 101431-0330 1014310330
ISUZU 5156007451 5156007451
101431-0330 INJECTION-PUMP ASSEMBLY
Rating:
60
Buy INJECTION-PUMP ASSEMBLY 101431-0330 zexel genuine, new aftermarket engine parts with delivery

Service parts 101431-0330 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101043-9170
3. GOVERNOR 105410-3350
4. SUPPLY PUMP 105220-4591
5. AUTOM. ADVANCE MECHANIS 105621-0290
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105151-1451
11. Nozzle and Holder 5-15300-039-1
12. Open Pre:MPa(Kqf/cm2) 11.8{120}
13. NOZZLE-HOLDER 105081-3141
14. NOZZLE 105000-1650
15. NOZZLE SET

Include in #1:

101431-0330 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101431-0330 
101431-0591 
 
5156007451  ISUZU
INJECTION-PUMP ASSEMBLY
C240 *




Information:

(3) Remove all dirt, rust and foreign material from the surfaces on transmission input flange (3), shaft assembly (4) and spacer group (2). Use a file to remove all burrs or damaged areas on the surfaces. Install shaft assembly (4) on flange (3) with bolts (5) and the nuts. Push the crankshaft to the front of its travel with a pry bar. Loosely install spacer (2). Put a feeler gauge equal to one-half the crankshaft end play (see step 2, page 6 for the dimension) between spacer (2) and coupling (1) at (S). Move the engine to the front or rear as needed to get clearance equal to the feeler gauge thickness. Remove spacer (2). Install 6V2042 Alignment Yoke (6) and 6V2043 Alignment Bar (7) on shaft (4) with two 13.0 mm Ø (.5"Ø) threaded rods and nuts. Install two dial indicators (8) and (9) as shown, one on surface (Y) and one on surface (Z). Use a pry bar to push the crankshaft to the front of its travel. Set the indicators to "0" in this position. (4) Indicator (8), on surface (Y), will show face alignment. Slowly turn shaft (4) by hand; do not use yoke (6) to turn the shaft. Make a record of the indicator readings 90° apart at (A), (B), (C) and (D). Face alignment as shown by the indicator must be as follows: a) A maximum TIR between (A) and (C) of 0.25 mm (.010") is permitted. The reading at (C) must be plus (+). This dimension is needed, because as an application of engine torque is made to the propeller shaft, the transmission will tip forward a small amount and both dimensions will be the same.b) A maximum TIR between (B) and (D) of 0.25 mm (0.010") is permitted but the reading at (B) plus the reading at (D) must be equal to the reading at (C). (5) Indicator (9) on surface (Z) will show bore alignment. Put the indicator on "0" at location (A). Slowly turn shaft (4) and make a record of the indicator readings 90° apart at (A), (B), (C) and (D). Bore alignment as shown by indicator (9) must be as follows: a) The TIR between (A) and (C) must be 0.64 0.25 mm (.025" .010"). IMPORTANT: Because the centerline of the crankshaft must be below the centerline of the coupling shaft, the indicator reading at (C) must be plus (+) when the reading at (A) is 0.00 mm (.000") and indicator (9) is installed as shown.b) The TIR between (B) and (D) can be a maximum of 0.13 (.005"). The reading at (B) plus (D) must equal the reading at (C).(6) Move the engine as necessary to get the alignment dimensions given. (7) Loosely connect shaft (4) to coupling (1) with two bolts (18). Do not install the spacer between the shaft and the coupling at this time. Rotate the engine and transmission input shaft together and take the dial indicator readings

Have questions with 101431-0330?





Group cross 101431-0330 ZEXEL

Isuzu 

 
5156007431 
INJECTION-PUMP ASSEMBLY
C240
 
5156007560 

C240
 
5156007460 

C240
101431-0330  

101431-0591 
 
5156007451 
INJECTION-PUMP ASSEMBLY
C240
 
5156007491 
INJECTION-PUMP ASSEMBLY
C240
 
5156007551 
INJECTION-PUMP ASSEMBLY
C240
 
5156007691 

C240
 
5156007481 
INJECTION-PUMP ASSEMBLY
C240
Back to top